MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211J3431999-09-0101 September 1999 Amends 231 & 207 to Licenses DPR-53 & DPR-69,respectively, Revising Appropriate TSs to Permit Use of leak-limiting Alloy 800 Repair Sleeves Developed by ABB-CE ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20207L2911999-03-0808 March 1999 Amend 205 to License DPR-69,permitting One Time Change to TS 3.8.2 to Provide Alternate Cooling to EDGs During Replacement of Service Water Heat Exchangers in 1999 Refueling Outage ML20196J6721998-12-0808 December 1998 Amends 229 & 204 to Licenses DPR-53 & DPR-69,respectively, Revising TS 3.3.1 & TS 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20249C0021998-06-23023 June 1998 Corrected Amends 227 & 201 to Licenses DPR-53 & DPR-69. Revision Due to Failure to Include Pages 10-13,Section 3.4, Reactor Coolant Sys, or Se,Table L,Matrix of Less Restrictive Changes & in Bases,Page B 3.7.6-5 ML20248B0131998-05-23023 May 1998 Amends 228 & 202 to Licenses DPR-53 & DPR-69,respectively, Revising TS for Reduction of Total Reactor Coolant Sys Flow Limit from 370,000 Gpm to 340,000 Gpm in Support of Increased SG Tube Plugging ML20216H1661998-03-17017 March 1998 Amends 226 & 200 to Licenses DPR-53 & DPR-69,respectively, Change TSs to Incorporate Both Steady State & Transient Degraded Voltage Setpoints as Opposed to Current Single Degraded Voltage Setpoints ML20203A6461998-02-10010 February 1998 Amend 225 to License DPR-53,authorizing Rev of UFSAR in Response to as Supplemented 971114,to Reflect Installation of Svc Water HX W/New Plate & Frame HX ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20198K5481998-01-0505 January 1998 Amend 224 to License DPR-53,consisting of Changes to TSs 4.8.1.1.2.a.5,4.8.1.1.2.d.4 & 4.8.1.1.2.d.5,in Response to Application Transmitted by ML20202C3561997-11-18018 November 1997 Amends 223 & 199 to Licenses DPR-53 & DPR-69,respectively, Incorporating Refs to New C-E TR Describing SG Tube Sleeves, Deleting Refs to Previous C-E TR & Incorporating Sleeve/Tube Insp Scope & Expansion Criterion ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20135F7971997-03-0707 March 1997 Amends 221 & 197 to Licenses DPR-53 & DPR-69.Amends Modify TSs Requirements to Allow Use of Blind Flanges During Modes 1-4 in Plants Unit 1 & 2 Containment Purge Sys Instead of Two Outboard 48 Inch Isolation Valves ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134N6951997-02-19019 February 1997 Amend 220 to License DPR-53 Concerning Provisions at Plant for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl ML20134K7261997-02-11011 February 1997 Amends 219 & 196 to Licenses DPR-53 & DPR-69,changing TSs in Response to & Adopting Option B,10CFR50,app J to Require Type B & C Containment Leakage Testing to Be Performed on Performance Based Testing Schedule ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20129D6911996-10-18018 October 1996 Amends 217 & 194 to Licenses DPR-53 & DPR-69,respectively, Implementing Changes to RETS IAW GL 89-01, Implementation of Programmatic for Radiological Effluent TS in Admin Controls Section of TSs & Relocation of Procedural.. ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20117H6211996-08-26026 August 1996 Amends 216 & 193 to Licenses DPR-53 & DPR-69,respectively, Revising TS Section 6.0 Administrative Controls to Be Consistent W/Sts & Allow STA to Perform Dual Roles ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20112J3271996-06-17017 June 1996 Amends 215 & 192 to Licenses DPR-53 & DPR-69,revising Applicable UFSAR Sections to Reflect Installation of Variable Flow Controller for Service Water Inlet Control Valves for Containment Air Coolers ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101N3101996-04-0202 April 1996 Amends 214 & 191 to Licenses DPR-53 & DPR-69,respectively, Reflecting New Plant Electrical Distribution Configuration, Surveillance & Limiting Condition for Operation of New SR EDG ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101G9181996-03-22022 March 1996 Amends 213 & 190 to Licenses DPR-53 & DPR-69,respectively, Allowing Installation of Tube Sleeves as Alternative to Plugging for Repairing SG Tubes Using Repair Techniques Developed by Westinghouse Electric Corp ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20101G2791996-03-13013 March 1996 Amends 212 & 189 to Licenses DPR-53 & DPR-69,respectively, Revising TSs to Reflect Approval for Use of 10CFR50,App J, Option B,For Plant Containment Leakage Rate Test Program for Type a Tests ML20100H1321996-02-21021 February 1996 Amend 211 to License DPR-53,allowing Use of Cladding Matl Other than Zircaloy or ZIRLO ML20097E3461996-02-0505 February 1996 Amends 210 & 188 to Licenses DPR-53 & DPR-69,respectively, Adding Convolution Analytical Technique for Analysis of Pretrip MSLB Event ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095L7481995-12-28028 December 1995 Amend 209 to License DPR-53,revising CC-1 TSs by Extending Certain 18-month Instrument Surveillance Intervals by Max of 39 Days to 960331 ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power 1999-09-01
[Table view] |
Text
e B A LTIMORE GAS AND ELECTRIC CHARLES CENTER e P.O. BOX 1475
- BALTIMORE, MARYLAND 21203-1475 Gromot C CRtto v:ce e.c ocie April 2,1991 w a..cu.c, m.,,. n. u.
U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50 317 & 50-318 1.icensg_ Ame,ndment Request: Containment intetrity Definition Gentlemen:
The Baltimore Gas and Electric Company hereby requests an Amendment to its Operating License Nos. DPR 53 and DPR 69 for Calvert Cliffs Unit Nos.1 & 2, respectively, with the submittal of the proposed changes to the Technical Specifications. This change would clarify the definition of containment integrity to eliminate an apparent conflict of action requirements.
DESCI(IPTION The proposed amendment would modify Definition 1.8, item 1.8.3, and Surveillance Requirement 4.6.1.1.b of the Calvert Cliffs, Units 1 and 2 Technical Speci0 cations to indicate that the impact of the containment air locks on containment integrity is based on compliance with Specif4ation 3.6.1.3 (Containment Air Imcks). This would clarify that operation is required to be in accort..cc with the intended action requirements of Limitinr. Condition for Operation 3.6.1.3, rather than the action requirements of Limiting Condition for Operation 3.6.1.1.
IM KGl(OUND The Calvert Cliffs Unit 2 Technical Specifications, as originally issued, and the subsequent conversion of Unit 1 to the Standardized Technical Specification format, were written such that the De0nition and the Surveillance Requirement both require operable containment air locks to show containment integrity. In more recently issued Technical Speci0 cations for other nuclear power plants, the Definition and the Surveillance Requirement both ;cquire compliance with the requirements of Specification 3.6.1.3. " Compliance with the requirements of Specification 3.6.1.3" provides for operation within the action requirements to suffice for containment integrity. With the current Calvert Cliffs wording, the containment integrity specification requires shutdown (Mode 5) within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> and does not provide the intended out of-service time of the action statement of SpeciGcation 3.6.1.3 for attempting repair of the air locks prior to requiring shutdown.
h
@\\ W 9104050070 910402 PDR ADOCK 05000317
{
p PDR
\\
\\ \\
ey n
,.y m-
l
, Document Control Desk April 2.1991 Page 2 The Calvert Cliffs Technical Specifications are currently worded such that they impose an unintended and unnecessary restriction. Baltimore Gas and Electric (BG&E) Company requests that they be changed to reDect the wording of more recently licensed nuclear power plants.
HEOUESTED Cil ANGE Change pages 12 and 3/4 6-1 of the Unit I and Unit 2 Technical SpeciGeations as shown on the marked up pages attached to this transmittal.
SAHilY ANAINSES The containment uir locks form a part of the containment pressure boundary. As such, uir lock integrity and air tightness is essential to limit offsite doses from a Dusign Basis Accident (DBA) as described in the safety analysis. The DBAs which couH occur at power and result in a release of radioactive material within containment are a loss of coolant accident (LOCA), a main steam line break, and a control clernent assembly ejection accident. Each of these DBAs assumes that the containment (and its air locks)is capable of performing its intended containment function such that the release of fission products to the environment is limited to a vuy small fraction of the containment volume. These events are described in Updated Final Safety Analyses Report (UFSAR) Chapter 14.
The containment design provides for an allowable leakage rate (La) of 0.20% of the containment air weight per day. This leakage rate was used in the offsite radiological dose calculations for Calvert Cliffs and is the basis for Technical Specification 3.6.1.2.a. An additional restriction imposed by 10 CFR Part 50, Appendix J, and Technical Specification 3.6.1.2.b is that no more than 60% of this allowable leakage (L ) be through Type B and C penetrations. The air locks are Type B a
penetrations. Each containment air lock is further limited, by Technical Specification 3.6.1.3.b, to an overallleakage rate of 5% of the allowable leakage (L )-
a Both of the containment air locks are designed with a door on each end. Both doors are required to be closed during operation unless the air lock is being used for transit entry and exit through the containment. Then, at least one door is required to be closed. Each door contains a double seal.
The area between the doubic seal on a dcxir is maintained pressurized to provide the leakage barrier.
In accordance with Technical Specification Surveillance Requirement 4.6.1.3.a. the seal leakage of each containment air k)ck is routinely verified following its use to be no greater than 0.02% of the allowable containment leakage (La)-
The operable seal of either door is sufficient to maintain the required containment barrier since each is designed to withstand the peak containment pressure calculated to occur following a DBA however, both doors are kept closed when not in use to provide an additional barrier. Specification 3.6.1.3 was written to recognize this capability of a single door to serve as a leakage barrier and provided an allowed out-of ser ice time for one door in order to attempt repairs prior to requiring a shutdown. Ilowever, due to the wording by which the containment integrity requirements reference the air lock doors (stating that the doors must be operable), the intent to govern airlock doors with the action statements of Specification 3.6.1.3 is thwarted. Based on the design of the air lock doors, BG&E believes the containment integrity wording to be incorrect and unnecessarily restrictive.
Thus, we request that the wording be revised.
1 1
Document Control Desk i
April 2,1991
' Page 3 a
1)l,TEllM f NATION Q)' S1(rbl[ICANT llALillllS This proposed change has been evaluated against the standards in 10 CFil 50.92 and has been determined to involve no significant huards considerations, in that operation of the facility in accordance with the proposed amendment:
(1) li'ould not inwire a significant increase in the prvbability or consequences of an accidentpreviously evaluated.
'lhe containtnent air locks are not considered as initiators for any previously evaluated accident. This change does not impact their design and therefore does not significantly increase the probability that they would initiate any previously evaluated accident.
The safety analyses consider the containtnent leakage barrier to be intact and maintaining the leakage at less than the assumed value at the initiation of the evaluated accidents that occur during operation. Since each air lock door is designed to provide that containment barrier and is periodically tested to assure that leakage is not excessive, this change will not significantly increase the consequences of any previously evaluated accidents.
(2)
W<ndd not create the possibility of a new or different type of accident l rom any accident previously evaluated.
This change does not involve a change to the design of the plant. The new method of operation will not involve any components which could initiate un accident.
Therefore, this change would not create the possibility of a new or different type of accident from any accident previously evaluated.
(3)
Would not inwire a significant reduction in a margin of safety.
The margin of safety for the containment integrity technical specification is provided by assuring that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak tales as:,umed in the accident analyses. Since cach air lock door is designed to provide that containment barrier, this change does not involve a significant reduction in the margin of safety.
Sfl1EI)UI,li 11G&E requests approval of this change by June 30,1991, While issuance of this amendment is currently not identthed as having an impact on outage completion or continued plant operation, your prompt consideration is appreciated.
S311ECOMh.llT[EE ItINIIM These proposed changes to the Technical Specifications and our determination of significant hazards have been reviewed by our Plant Operations and Off Site Safety 1(eview Committees, and they have
= _. _ _.. -.
, Documc it Control De*L April 2, W91 Page 4 concluded that implementation of these changes will not result in an undue risk to the health and safety of the publit..
Yery truly yours, 77)
}
/f'/
)
Y
']
STATE OT MARYLAND t t
TO WIT t COUNTY Or CALVERT I hereby certify that on ttm 2 day of _
/YI!
,1991,be re m the subscriber, a Notary Public of the State of Maryland in'and for Calocc) osm d/
pen, anally appeared George C. Creel, being duly sworn, and states that he is Vice President of the Baltimore Gas and Electric Cornpany, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.
WITNESS mylland and NotarialScal:
[
Notary Public My Comrnission Expires:
AMy ch. /9 Dafe GCC/ ERG / erg /dtm
Attachment:
(1)
Markup of Unit I and 2 Technical Specification Pages 12 and 3/4 6-1 cc:
D. A.11rene, Esquire l
J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., N RC T. T. Martin, NRC L E. Nicholson. NRC R. I. McLean, DNR l
J. II. Water, PSC l
..,... -