Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210K3281999-07-30030 July 1999 Forwards Response to NRC RAI Re License Amend Request 98-17. North Atlantic Concurs with Staff That Bases Should State That Maintaining ECCS Piping Full of Water from RWST to Reactor Coolant Sys Ensures Sys Will Perform Properly ML20210H8991999-07-27027 July 1999 Forwards Tabulation of Current LBLOCA & SBLOCA Peak Clad Temp Margin Utilization Tables Applicable to Seabrook Station ML20210H0921999-07-27027 July 1999 Forwards Naesc Semi-Annual Fitness-for-Duty Rept,Jan-June 1999, Per 10CFR26.71(d).Rept Includes Data from 990101- 0610 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options ML20210A2521999-07-15015 July 1999 Forwards Rev 33 to Seabrook Station Radiological Emergency Plan & Rev 84 to Seabrook Station Emergency Response Manual ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1351999-07-0909 July 1999 Forwards Relief Request Re Repair Welding on SA-351 Matl to Be Installed in Seabrook Station SW Pumps & SW Cooling Tower Pumps ML20209D2871999-07-0606 July 1999 Submits Response to NRC AL 99-02,re Numerical Estimate of Licensing Actions Expected to Be Submitted in Fy 2000 & 2001.Schedule Does Not Include Activities Which Meet AL Definition of Complex Review ML20209C9021999-06-30030 June 1999 Provides Revised Distribution List for Seabrook Station Correspondence to Reflect Current Organization ML20196G2391999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant Encl ML20196G3381999-06-23023 June 1999 Forwards LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20195J0981999-06-17017 June 1999 Forwards Responses to Questions Posed in Re Application of New England Power Co for Transfer of Control of Licenses NPF-49 & NPF-86.Copy of 1998 Schedule 13G, Included,As Requested ML20196D0561999-06-16016 June 1999 Forwards Certified Copy of Endorsements 77 & 78 to Nelia to Policy NF-0296 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195J1221999-06-15015 June 1999 Forwards Addl Clarifying Info to Suppl Info Provided at 990602 Predecisional Enforcement Conference at Region I. Proprietary Declarations by Util Employees to Correct Inaccuracies Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210K4971999-06-15015 June 1999 Forwards Copy of Ltr from Concerned Constitutent AC Menninger from Franconia,Nh to Senator Smith Re Seabrook Nuclear Power Station Y2K Readiness ML20195E9731999-06-0707 June 1999 Forwards Rev 32 to Seabrook Station Radiological Emergency Plan & Rev 83 to Emergency Response Manual ML20206T4201999-05-20020 May 1999 Forwards Certified Copies of Resolution Adopted by Shareholders of National Grid Group Approving Acquisition of New England Electric Sys & Vote of New England Electric Sys Shareholders Approving Merger with National Grid Group ML20196L2001999-05-0707 May 1999 Forwards Rev 01-07-00 to RE-21, Cycle 7 COLR, Per TS 6.8.1.6.c ML20206K4301999-05-0707 May 1999 Forwards Copy of Corrective Order of Notice by State of Nh Nuclear Decommissioning Financing Committee ML20206J3321999-05-0505 May 1999 Forwards Tabulation of Number of Tubes Plugged in Each of Two SGs Inspected During Sixth Isi,Per Plant TS SR 4.4.5.5a. Sixth ISI Was Completed on 990420 ML20206J3341999-05-0505 May 1999 Informs That on 990501,ISO New England & New England Power Pool Implemented Restructured Wholesale Electricity Market. Summary of Util Action as Result of Implementation of Subject Market,Encl ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206G4371999-04-30030 April 1999 Forwards 1998 Annual Environ Operating Rept for Seabrook Station.Encl Rept Is Summary of Implementation of EPP for Period of Jan-Dec 1998 ML20206H4801999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Seabrook Station. Listed Info Provided in Encls 1999-09-08
[Table view] |
Text
_ - - _ -___-____
03r27/3996 80132 PMt REG.LATORY SEWlCES 1 603 474 9588 0083 P.B2 ATTACHMENT 7 New Hampshire Teel C. Felg eoben Yankee ~. -
CWet tish ob NYN. 91029 February 26,1991 Mr. Thomas T. Martin Reglonal Adminlitrator Unlied States Nuclear Regulatory Commission Region 1 473 Allendelt Road Klag of Prussia, PA 19406 Referteces: (a) Facility Operettag IJcense No. NPP.86, Docket No. $0 443 (b) USNRC Reglos ! Letter dated February it. 1991, ' Request for Information on Radiogtspb Records' C. W. Hehl I- T. C, I cigtnbaum (c) NitY Lettet NYN 91023, dated Tsbrusty 8.1991 ' Additional NHY Responst to 010 Rcquest for Information*, T. C. Telgenbaum to L. J.
Nortos
$ubject: Respopst to Requtst for Information Centlement Ecelosed please find New Hampitlec Yankees' response to the information requested in USNRC letter dated Tebruary 22,1991 (Referents (b)),
Should you have any questions negerdlag this mattet pleast contact Mr. Nsal A.
Pillsbury, Dltector of Quellty Programs at (603) 474 9321, extsaston 33A i
Very tt y yours, 69 A. */ c ^5W C
Ted , Folgem TCF:ALL/ tad Nea Hampshire Yonkee DMston of P#ic Service Cornpony of New Hompshire P O. box 300
- Tetephone (603) 474 9521 9104040132 910322 PDR COMMS NRCC CORRESPONDENCE PDR
C2/37/1991 80133 t+ff MOULATORY SEWlCES 1 603 G74 9533 4483 P.03 United States Nuclear Regulatory Consission Pobruary 26, 1991 Attentlos: Mr. Thomas T. Martin Pass two l
cc: Document Conttel Desk United Stats: Nuclear Regulatos) Commission Washington, DC 20$$$
Mr. Oordon E. Edison, St. Project Manager Project Dlitetorate 13 Dittslen cf Reactor Projtelt U.S. Nuclear Regulatory Commission Washington, DC 20$$3 Mr Charles W. Hthl, Director Divisloc of Resetor Projects U. S. Nuclear Regulatory Ccmmisaloa, Reglos !
47f Allendale Road Kleg of Prussla, PA 19406 Mr. Hos! Dudley NRC Scalor Roaldent Isspector P.O.-Bc 1149 Scabrook, NH 03874 1
1 1 .
l<
f
02,27/1991 10833 tNY Rf314TDRf SEMCES 1 (43 674 9531 c413 P,04 4
$Y $0kh I h- $$kl$
Febretty 16.19h ENCLOSURE 1 TO NYN 91079
.m _ . _ _ . - _ _ _ _ _ _ _ __ __ _ . _ . _ _ _ . _ _ _ _ - _ _ - . _ _ _ _ _ _ _ - _ _ _
82/2W1991 10:33 tHf RE0J.A70RY SEINICEg i EC3 474 9521 d413 P.05 i
, Renest Ngul
. Tbt outr.ber of Pullman.Higgles wcld radlegraphs retrieved from the flies tecidset to post-construction follow.up on neld adequacy questices, and the number of Pelless.Higgles weld tsdlographs wbleb were mot rettlesable during tble effort.
A11Ms11 A. There have beco 1174 occasions whers P.H weld redlugraphlt film pechages bass been rettlend from the N}IY storage vault lecident to post. construction follow.sp on wcld adequacy questions. Slocs certeln pattests weic estrieved on multiple occaslots, it has ocesi determloed that at 15:st 920 separate and distir.ct radiographic packages heve been tetrieved and subsequcelly serlfled as a result of this effort.
These numbers were determloed as follows:
NUREO 1425 (locludes Wampler log). 276 Correctise actions perfctmed as described la NHY CAR 91001. 137 .
Congresslocal lequiries (estlmsted to be 300) requestleg Weld Process sheets and Radiographic f aspe ctiert Reports through the NRC.
76 ($ss Note 1)
Addllleeslly, NHY bas orbitrarlly selected, from P.H ' Records Receivlog Check Lists',
a somber of weld receeds for tbs yests 1981 through 1984. These were the years of most laterest to the congressional loquiries as these years
- sts prior to YAEC formally specifying their 100%
!!!m review in a written procedurs. As of 2/22/91.
Ibc weld redlographs for these pipe welds were verifled to os lo the NHY records vault with proper evidence of YAEC review. .1Q1 ,
Total 1174 (Su Note 2)
Note: 1.
Tbc sombar 300 wu not used in tbla calculation because - set all documceted congres letal Inquirles are avstlable to NHY, and a number of thest requists were redundant. NHY bs!! aves that 76 c.caservatively understates abs actual number.
Note: 2. Tbc number of redlograph packego rettlesals (1174),laclude many duplicate resitws of the umc prekages. NHY bas further cross checked the weld numbers locluded la tbli set of 1174 and has determined that there are at least 920 separate -
and distinct sadlographic potkages within tbls population of 1174 racilographic film set verifications.
- 5. One (1) la the n'urober of Pullman.Higgins Tleic! weld radiograph sets not found to t' be retricssble during these efforts. P.H redlegraphs for P.H weld number CS 328 02.P0204 were not located during the document research phase of an on.golag l congresalocal lequiry. NHY wrots CAR 91001 to document and resolve this occurrence. CAR 91001 was enclosed In Rsistsace (c).
1
_____ __ _ - _ . . _ ~ _ _ . - _ _ _ _ _ _ - . . _ . _ _ - . . _ _ . _
02/27/1991 10:34 tN t' RE3.LATORY !4WICES 1 603 474 9531 d413 P.06 C. Also not leeluded in these numbers sie entensive NRC ladependernt vertflentloa Inspections soeb att Construction Appeelsel Team Report (CAT) 32 00 *bleb rey!ewed
. 29 F H s5lds, CAT 34 07 wkleh railswed 180 P.H welds, and VAN g$.19 which revlewsd 79 Pell wclds.
The abovs sad meriy othcr NRC laspeettons were cet ' post. construction' rettissels and therefore were not lacluded la out tabulation.
LtMLst No -_2-The numbet of Pullmon.Higgins weld redlographs which should be on file.
P e teenne The total number of radiograph sets whleh should be un fils la the number of NHY records la the vault (4177), plus the ces missing radiogespb sat for C 32102 F0204, plus any additional redlegraph sets wbleb should be to the file but an not. NHY believen that the number of radlegraph sets In this latter category is sero bassd on the gestric implications tsview discussed in the rssponsa to Rogusst No. 3 below.
It is believed that the number of radicaraph sets abould be 4178 to order to acct the oppilcible A5ME Code and P.H contractual commitments for Seabrook Station. Thle number cac also be derived from the Icforttation which was ptrylosely provided to tbc NRC and then subsequently summtilted in tbc table on page 14 2 to the NRC's NUREG 1425
(*Weldleg and Noodestructive Examinatico issues at $ctbrook Nuclear Station').
An empirit ,1 verificetion of thl number would requits a retlew of all as bullt Isometric drawings si record. NHY believes that this type of verification would be both time consumit g sod sanecessary based on the results of the extecalve ladependent verifications conducts J to date.
Atnut M The technical ba:Is for your conclusion that the missing radiograph for Fictd Weld C3 328 02 F020416 en laulated occurreccc with no discatanble generic impliestions (reference your Isitor NYN 91023 to NRC (010) dated February 6,1991).
Reneense NHY la confidtet that the slagle known instance of a missing radiograph set, fut C$.325
' 02 P0204, is an isolated occurrence with no discernable seastic implications based on the generle Irnplicatloon review described la CAR 91001 [caclosed in Reference (c)] and the telque circumstances favolved with this one redtograph set.
. As part of the CAR 91001 generic Impilc4tions review, NRY checked radlographs for an additler.sl 157 piptog wolds. These welds wert selected for revlow because they eahibited ecoditlocs potentially similar to C5 328 02.F0204, i.e., NCRs wars written and/or repalt was needed. The selectica of these welds was based on a scarch of computer data base NCR 2
03 47/1991 80:34 t+ft REO.A.ATORY SEGVICEQ 1 6C3 474 952a G483 P.07 information and a rav!aw of th6 P.H Weld Repair Order (WRC) log (a non.QA plannlag and scheduling control dottment), In partlsular, thest welds were selected !! tbty had NCRs with 3 or most repatra noted la the comptier data base or the P.H WRO log Identified these welds as having 3 or more satries or 3 or more repalf cycles.
For cach of these 1$7 lastances NHY vertfled that a radlograph set was available la the NHY vault and that the set had been rerlowed by YAEC.
NHY believes that tbc circurnstauces involved le the processing of the radiograph for CE.
328 02.F0204 have no discerneble generic implications based on the following:
- 1. The Wtld F0204 was incorree.tly marked as F0209 cm the piplag Isometric drawing after F0204 was tsdiographed.
- 2. F0204 was incorrectly deleted fiorn the pfples Isomett!c subsequent to the radiographic examlestion belas pertoimed and accepted (as F0204). As e result, a F.H examloer might have determined that the radiograph was ao longer needed and that there ws: to ased to ased tha radiograph to YAEC foi review and subsequent littelion In the records Vault.
- 3. F0204 was re established en the piples isomettlo appionlmatel) 2 years after the nedlegraphic examination for F0204 was perfo med. In particular, the piping Isoroctric drawing was revised to delete F0209 and re establish P0204 probably in response to N.5 data report picparation. At that time, a review of the weld history package would have ludicated that the ws!d jolet was cornpleted and accepted because a P.
H Radiographic lespection Report (RIR) was available in the package. Thus, documentatico to prove that the redlegraphic examlantion was performed was available then as it is now.
The inferrestion provided above describss a unique act of citetustances. As a result of this inforrostico, NHY considsta this occurrence to be an isolated one with no discernable generic Implications.
3 TOT?t. P,07
, je neg~
ATTACHMENT 8 2
[M e 4 U NIT 8 0 6fAft4 D NUCLEAR MEQULATORY CCMMISSN>N MtoloN 1
- , 08 ALLaNDAL ROAD KINO oF Phy0BIA. PaNN8YLVANIA 1HM Docket: 50-443 GAR 0 5 981 Public Service Company of New Hampshirs ATTN: Mr. Ted C Felgenbaum President and Chief Executive Officer New Hampshire Yankee (NHY) Division Post Office Box 300 Seabrook, New Hampshire 03874 Gentlemen:
Subject:
Request for AdditionalInformation on Welds Based on NRC redew of your February 26,1991 response (NYN 91029) to our February 2; 99. request for information, we request that New Hampshire Yankee (NHY) 4 provide, by March 11,1991, the following additional written information on weld radiographs, o The basis for NHY confidence that required radiographs were made for (Pullman-Higgins) field welds, with satisfactory results and radiograph retention as required.
- Clarincation of the number of(Pullman Higgins) radiographs audited / examined incident to responses to post construction inquiries concerning weld adequacy.
The basis for this request is the NYN 91029 assertion that e 6me consuming review of all as-built Isometric drawings of record would be required to verify the Pullman Higgins radiographs which should be on file. That raises a question of whether NHY (and their agents Pullman Higgins, the authorized nuclear inspector, and Yankee Atomic Electric Company) ever determined that all required radiographs were made, found acceptable during constmetion, and were present in the vault. Clarification of the numbers of radiographs retrieved in response to post construction questions is being requested because it is still not j clear to us which sample sets retrieved involved re examination of the same radlography.
Thank you for your attention to this matter.
' Slocerely,
\m4I.% h (/
9 les W. Hehl, Director Divisico of Reactor Projects 1 . - .
.geann
. - . ._ _ - . - - - --