4 DOCKET 50-305 KEWAUNEE NUCLEAR POWER PLANT
SUMMARY
OF OPER ATING EXPERIENCE November, 1982 OPERATIONS:
On November 7, unit generation was reduced to 75%
"or the monthly Turbine Stop Yalve Test.
MAINTENANCE:
-Replaced defective solenoid valve coils in the screenhouse ventilation system.
Repaired some boric acid heat tracing control circu its.
~ Repaired a can follower on the inner containment airlock door.
Re pla ce'd the ball and seat in a service water valve for ~ a component cooling heat exchanger.-
Rebuilt ~a charging pump safety valve.
T,#
h DO R
-,--a
~ -
A VER AGE DA ILY UNIT PO W ER LEVEL DOCKET No-50-305 Ul!IT-KEWAUNEE COMPLETED BY-G.
H.
RUITER TELEPHONE-414-388-2560 X 225
)
REPORT MONTH NOVEMBER, 1982 l
AVERAGE DAILY DAY POWER LEVEL (MWE-NET) 1 499 2
512 3
512 4
512 5
512 6
512 7
487 8
512 9
512 10 512 11 512 12 512 13 516 14 512 15 512 16 512 17 516-18 512 19 516 20 512 21 516 22 504 23 516 24 516 25 512 26 495 27 516 28,
512 29 512 30 512 e
'L
^
s
-()
_ j f,.
q-4' *.,
-5 N IT SEDTD0W N5 AND F O.5 RR F E D 5 C T I O N'S b
DOCKET NO: 50-305 a
UNIT NAME: Kewammee; DATE: December 1,_1982 y-COMPLETED RY: G. M. Reiter TELEPHONE.414-388-2560 x225 y
' (,n c
L REPORT. MCNTH - NOVEMBER, 1982
~
g.
l NO. l D AT E - ITYPE}DUNATIONl REASON l METHOD lLER. NUMBER } SYS- } COPPONENT }
.CORRENTS.
.I I-L I
I I
I I
I I
I 1
1
, shutdowns or load redactions during I 1
I I
i i
i i
I I
I No I
I I
I I
I I
I I
I Novem ber.,
I-6 I
I i
1 I
I i
1 I
I I
I I
I I
I I
l-1 I
I I
I I
I I
I I
I I
i 1
I I
.y i
I I
I I
I I
I I
I
'l I
I I
I I
I I
I I
I 1
I I
I I
I I
I I
I I
y i
I I
I I
I I
I I
.I I
I I
i 1
I I
I I
I I
I I
1 I
I I
I I
I i
1 1
,. 'l g,
I I
I i
1 1
I I
I I
i I
I i
1 1
I I
I i
1 I
I I
I I
I I
I i
i 1
y i
I i
1 1
I I
I i
1 I
1 1
I I
I i
1 1
1 1
1
~
l i
I I
I I
I I
I I
i y
i I
I 1
I I
I I
i I
i 1
1 1
I I
i 1
I I
I I
I I
I I
I I
I I
I
'l-y i
I I
I I
I I
I I
i 1
I I
I I
I I
I I
I I
i 1
1 I
I I
I i
i 1.
I I
y i
I I
I I
I I
I I
I I
i 1.
I I
I 4
1 1
1 I
I I
I I
I I
I I
I I
I I
1 y
i I
I I
I I
I I
I I
1 1
I I
I I
I i
1 1
I
~
l i
I I
I.
1 I
I I
I I
v SYSTER S COMPONENT CODES y
TYPE EE AS ON METHOD F: Forced A-Equipment Failure (Explain) 1-Manual From NUREG-0161 S: Scheduled E-Maintenance or Test 2-Manual Scram y
C-Be f ueling 3-Automatic Scram C-Regulatory Restriction 4-Continuations E-Operator Training & License Examia.ttion 5-Load medactions y
F-Ad ministrative 9-Other G-Operational Error (Explain)
C H-Other IExplain)'
?g pp', Ypy M,ggigt
- Kfg,gj%:gP y y p'p.p pj Q y
- g*/L
.,$ *y,3ff,NPA38f.b p7.g)'
F.3: yl 2
f
y, y
- s, OPER ATING G A'T A REPGRT DOCKET NO-50-305
^
- s" COMPLETED BY-G.
H.
RUITER y
0PER ATING STATUS TELEPHONE, 414-388-2560 I225 1 UNIT N AME KESAUNEE y
2 REPORTING PERIOD NOV EM B ER, 1982
- NOTES L
3 LICENSED THERM AL POW ER (MBT) 1650
- As of the end of this reporting period,
- the unit has been continuously on line 4 N AMEPLATE RATING (GROSS MWE) 560
- for 190 corsecutive da ys.,
y 5 DESIGN ELECTRICAL RATING (N ET M B E) 535 y
6 MAXIMUM DEPENCABLE CAPACITY (GPOSS MWE) 538 7 MAXIMUM DEPENDABLE CAPACITY (NET MNE) 511 y
8 IF CHANGES OCCUR IN CAPACITY BATINGS (ITEFS NUMBER 3 THROUGH 7) SINCE LAST REPORT,' GIVE REASONS None y
9 POW ER LEVEL TO hBICH RESTRICTED, IF ANY (NET MBE) None y
10 RE%SCNS FOR RESTRICTIONS, IF ANY L
THIS EONTH YR-TO-DATE CU5ULATIY" y
11 HOURS IN REPORTING PERIOD 720 8016 74161 12 NUMBER OF HOURS REACTOR W AS CRITICAL 720.0 7016.4 63018.3 13 REACTOR RESERTE S HUTDOW N HOURS
- 0. 0
- 0. 0 2330.5
(
y 14 HOUPS GENER ATOR ON-LINE 720.0 6959.5 61766.3 15 UNIT RESERVE SUIDOWN HOURS 0.0
- 0. 0 10.0 16 GROSS THERM AL ENERGY GENERATED (M98) 1178287 11215596 96022530 y
17 GROSS ELECTRICAL ENERGY GENERATED (Men) 386200 3664400-316168J0 18 NET ELECTRICAL ENERGY GENERATED (MSH) 367723 3490809 30091066 19 UNIT SERTICE FACTOR 100.0 86.8 83.3 y
20 UNIT AYAILABILITY FACTOR 100.0
- 86. R 83.3 V
21 UNIT CAP ACITY FACTOR (USING MDC NET) 99.9 64.7 77.7 22 UNIT CAPACITY FACTOR (USING DER NET) 95.5 81.4 75.8 g
y 23 UNIT FORCED OUTAGE RATE 0.0 0.1 4.3 24 SHUT 00sNS SCUELULFD OV ER NEIT 6 MONTHS (TYP E, DATE, AND DUR ATION OF EACH)
Refueling shutdown of 8-week duration is scheduled to start March 20, 1983.,