Discusses Establishing Extension Allowance for General Employee Training & Radiation Worker Training.Util Intends to Implement 25% Extension of Retraining Period as Soon as Related Programs & Procedures Revised
ML20070L664
Person / Time
Site: Comanche Peak  
Issue date: 03/13/1991
From: William Cahill, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-91108, NUDOCS 9103200147
Download: ML20070L664 (2)


Text

- _ _ -

w I

l

==

Log # TXX-91108 L

File # 10010.

i

=

913.2 N

Ref. f.100FR50.9 l

filELECTRICJ l

1 1

wnuem J.comm.Jr.

Harch 13, 1991 Executive Vke Pres 6temt U.- S. Huclear Regulatory Commission Attn:

Document Control: Desk Washington, DC 20555 i

L SUBJECT COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

. DOCKET-NO 50 445 AND 50 446-ESTABLISHING:AN EXTENSION ALLOWANCE FOR' GENERAL EMPLOYEE TRAINING AND RADIATION WORKER TRAINING' REF: TV Electric (TUGCO) letter logged TXX 3327 from Billy R. Clements to Robert L. Tedesco.-dated June 3, 1981.

Gentlemen:

i in the referenced correspondence TV Electric: stated that-General Employee I

Training (GET) and Radiation Worker Training-(RWT) "...will be repeated...on an-annual basis."- In the past. TV Electric has-interpreted this-commitment to -

mean that an individual's' training expires _if not_ repeated on or before the anniversary date for the last time-he/she completed training. -

This interpretation of " annual":is placing an inordinate burden on personnel who--

work rotating shifts by causing these individuals to-take GET:or RWT or_both about every nine months to maintain their. " current" status.- Therefore -

TU Electric is modifying its commitmentiin this area to extend the annuali period by up to 25% (characterized by either.365 days x 1.25-or'12 months.x 1.25).

This extension of_ training requirements; parallels'the allowable extension permitted for surveillance requirements per paragraphi4.0,-2 of the CPSES Technical Specifications.

To further substantiate the acceptability of this extension, other plants have _

been polled and the following-documents have'been reviewed:

0 TV Electric correspondence.

O CPSES Fire Protection Repor_t.

O CPSES Final-Safety Analysis Report (FSAR).

0 CPSES Physical Security -Plan:(PSP),

0 10CFR19:and 10CFR50.__

0 INPD Guidance-87 004.

O ANSI Standards ANS-18.7 1976 and ANS-3.1-1983;

-0 Regulatory _ Guide.J1.8.

O NUMARC Guideline =89-01..

O I&E Manual.-procedure-41400._

0 Standaru Review Plan (SRP) - NUREG-0800, Section 13.-2.2.

O Regulatory Guide 1.70 9103200147 910313 P

~ B.si Dallas, Texas 1520s g

DR ADOCK0500g5

- 40e North otive street 1

.e:..<s.z. u.u

n P

TXX 91108 Page 2 of 2 Of these documents, only the referenced letter, the PSP, and the SRP refer to a periodicity for GET and RWT.

The letter refers to annual, the PSP to 12 months and the SRP to two (2) years.

The poll shows that TV Electric's modified commitment is consistent with current industry practices.

TV Electric intends to implement the 25% extension to the retraining period for General Employee Training and Radiation Worker Training as soon as related CPSES programs and procedures are revised.

If there are any questions, please contact Mr. Roger Walker, Nuclear Licensing, at 214-812 68G6.

Sincerely.

William J. Cahill, Jr.

By:

D. R. Woodlan Docket Licensing Manager GLB/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

Mr. J. W. Clifford, NRR l