3 Gl NUREG-0580 Vol.11, No.11
__: _ = _= = = _: =
REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS 1; BLUE BOOK?
OCTOBER 16 - NOVEMBER 30,1982 l
l 1
- :- = = =-
UNITED STATES NUCLEAR REGULATORY COMMISSION i
f amc, o
f-ki s..'... e
Arlitable from N RC/GPO Sales Program Superintendent of Documents Government Printing Office Washington, D. C. 20402 A year's subscrintion consif.s of 12 issues for this publication.
Microfiche of single copies are available from NRC/GPO Sales Program Washington, D. C. 20555 l
l l
1 l
(
l
NUREG-0580 Vol.11, No.11 REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE 803K)
OCTOBER 16 - NOVEMBER 30,1982 Manuscript Completed: November 1982 Date Published: December 1982 Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION Prepared by: 0FFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C.-20555 5
0
h F0REW0RD r
THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS
SUMMARY
REP.2Ei, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CCHTROLLING THE PROGRESS OF REVIEW PROCESSES FJR CENTRAL STATION NUCLEAR REACTOR APPLICATI0HS.
IT UTILIZES DATA COLLECTED FROM THE OFFICE OF hUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION & ENFORCEMENT AND THE NATIONAL LABORATORIES, AND ANALYZED MY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.
SECTION I 0F THIS EDITION CONSISTS OF THE THREE
SUMMARY
OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.
SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A MON-POWER REACTOR
SUMMARY
EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
i
LICENSING 0F NUCLEAR REACT 0RS THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.
THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PL ANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.
THE HRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.
TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.
THE ST AFF'S ANALYSIS IS SUBMITTED TO THE NRC'S ST ATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE HRC AND MADE PUBLIC.
A PUBLIC HEARING IS HELD, USUALLY NEAR THE PROPOSED SITE, BY AN NRC APPOINTED ATOMIC SAFETY & LICENSING BOARD.
PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.
AFTER REVIEWING THE HEARING RECORD INCLUDING THE HRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.
THE BOARD'S DECISIDH IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT.
AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE HRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.
AS CONSTRUCTIDH PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE.
THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE HRC IH DECIDING WHETHER OR HOT TO ISSUE THE OPERATING LICENSE.
l IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTIDH PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SU3 JECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE COMMISSION.
TABLE OF C0NTENTS PRINTED IN THE ORDER LISTED SECTION I
SUMMARY
OF ACCOMPLISHMENTS OL
SUMMARY
OF ACCOMPLISHMENTS CP
SUMMARY
OF ACCOMPLISHMENTS COMBINED HUMERICAL
SUMMARY
OF ACCOMPLISHMENTS
. TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE HEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE HEXT FIVE YEARS HEW APPLICAsiuN FORECAST:
OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIDHS USED WITHIH THE PUBLICATION SECTION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGH REVIEWS OTHER REVIEWS HOH-POWER REACTORS SECTION III EXAMPLE REVIEW
7_._____._
f I
w Z
O ee O
L&J th
l lll 1
lll l1l lll CCC CC 222 22 L
888 88 A
///
/ /
U 629 22 11 T
012 C
///
//
11 A
010 111 11 D
E E
22222 2
T L
88888 8
A U
/////
/
D D
00622 2
1 0_
E 33012 H
/////
/
1 T
C 11010 S
11111 1
R A
E Y
S L
A T
C S
N I
2 F
E 8
W 2
D M
Y 1
3 T
2 E
N I
K
- e 1
L AI U
S I
EM8 3
A C
PR S
N I
A E1 D
N F
EF 1R S
1A L
H D O H
S CONRF I
RE P 2 NCACR EU 8
S E
AIL E
S E
S E
MQ 1
i M
9 N
MRDMT N
N MS 1
O R
ONIUA O
O S
UU 0
N CEMSW N
N SS R
E S
S C
0 3
E S
E E
L C
R S
S D
F O
A E
B M
E F V O
0 N F
O C
CC Y
2 22 S
L 8
88 R
A A
/
//
U 2
22 A
T 1
11 C
/
//
M A
1 11 1
11 M
U S
pg 222 2
t 888 8
U
///
/
L D
002 2
E 331 1
0 H
///
/
R C
111 1
E S
111 1
B M
E V
O N
2 8
2 D
Y 1
8 T
2 E
I K
1 L
AI U
I EM A
C PR S
N A
E N
F EF1 S
1A H
H S
COR I
RE R
NCE EU E
AIM S
E S
E MQ W
S E
N MRM N
N MS O
O O
S UU P
O R
ONU N
CES N
N SS R
E S
S L
L E
S E
E L
U F
5 S
D F
O W
t L
A U
T C
A D
E E
2 T
L 8
A U
/
D D
0 E
3 O
H
/
T C
1 S
1 R
A E
Y S
L A
T C
S N
I F
2 E
8 D
1 M
Y T
D E
H I
R L
O U
S I
F C
N S
I A
A F
H S
L
/
S T
I P 2 I
8 S
E G
S E
S E
E M
9 H
A M
N M
1 D
R K
O O
S O
0 N
S N
H H
R E
S S
C 0
3 E
S E
E P
C R
3 S
D F
C A
E B
M E
F V
O 0 N F
O Y
S L
R A
A U
A T
C M
A M
U S
D E
2 L
8 U
/
P D
0 E
3 C
H
/
R C
1 E
S 1
B M
E V
O N
2 8
1 D
Y T
D E
I R
L O
U I
F C
N S
A A
F H
S
/
S T
I I
G S
E S
E E
S E
N A
N N
N O
R K
O O
S O
N S
H N
N R
'E S
5 E
S E
E P
5 S
D F
C 4
l i!
l I,
iI i
l
!i li l2 d
l-
SUMMA RY 0F ACC0MPL ISHMENTS AS OF HOVEMBER 30, 1932 FISCAL YEAR TO DATE 2CftLEE4LLQ ACTUA(
NOVEMBER
(
SCHEDULED AQTUAL SER 'S( 0L )
0 0
SER'S( 0L )
0 0
$ER S( C* )
0 0
0 0
' SC OL )
S 3
' S( 0L )
3 1
SSER SSER 5SER S( CP )
1 0
SSER'S( CP )
1 0
' S( 0L )
0 0
DES'S( 0L) 0 0
DES DES'S( CP )
0 0
FES'S( 0L )
0 0
FES'S( 0L )
0 0
' S( CP 3 0
0 FES'S( CP )
0 0
FES 0L ' S ISSUEDe 1
2 0L 'S ISSUEDu 1
2 CP ' S ISSUED 0
0 CP'S ISSUED 3
0 W FULL POWER
(
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF: 11/30/83 (INCLUDES SCHEDULES FCR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1982-1983)
(LISTED IN CRDER OF FACILITY NAME)
SFR SSER EST.
STAFF TECH STAFF TECH ASLB COMMW APPL.
DELAY ISSUE INPUT ISSUE ACR$
ISSUE INPUT ISSUE START INITIAL DEC.
CONST.
PIANT
([PNTHS)
Dr%
T0_DL SEE MTG FES TO DL SSER OF HRG DECISION DATE COMPL.
BYRnN 0
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 12/82 03/33 07/83 08/83 08/83 CLINTON 1 0
12/81C 12/CIC 02/82C 03/82C 05/82C 06/82C 07/82C 04/83 09/83 12/83 01/84 00:UNCHE PEAK 1 0
05/81C 07/81C 07/ SIC 1 1/ 81 C 09/81C 11/82 06/83 12/81C 01/83 05/83 06/83 LIABLO CANYCN 1 0
12/72C 01/75C 10/74C 07/76C 05/76C 01/83 02/83 12/76C 07/81C CIABLO CANYCN 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 01/83 N/S 12/76C 07/81C ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 09/81C 11/82 11/82 03/82C 10/82C 05/85 08/83 i
G 7 M. D GULF 1 0
05/81C cs/8tC 09/81C 10/81C 10/81C 11/82 12/82 N/A N/A 02/83 06/82C L A S A L t r. 2 0
C3/78C 02/81C 03/81C 04/81C 11/78C 12/82 01/83 N/A N/A 03/83 04/83 MCol'INE 2 0
10/75C 01/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 l
MIDLAND 1 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/83 07/83 11/83 12/83 l
MIDLAND 2 0
02/82C 04/82C 05/82C 06/82C 07/82C 03/82C 10/82C 11/82C 07/83 08/83 07/83 PALO VERDE 1 0
10/81C 10/81C 11/81C 12/81C 03/22C 08/82C 09/82C 04/82C 12/82 07/83 08/83 PE21Y I O
02/82C 05/82C 05/82C 07/82C 08/82C 11/82 12/82 02/83 08/83 10/83 11/83 EAN ONSTRE 3 0
01/S I C 01/31C 02/81C 02/81C 04/81C 12/82 12/82 06/81C 05/82C 02/83 11/82C S H O P. E U M1 0
03/77C 03/81C 04/81C 10/81C 10/77C N/S 12/82 05/82C 05/83 06/83 03/83 ST LUCIE 2 0
10/81C 09/81C 10/81C 11/81C 04/82C 11/82 12/82 N/A N/A 01/83 01/83 SUT:ER 1 0
06/79C 12/3 0 C 02/81C 03/81C 05/81C 11/82C 06/81C 08/82C 11/82C 08/82C SUS?uCHANNA 1 0
03/81C 03/31C 04/81C CS/81C 07/81C 07/82C 07/82C 10/81C 34/82C 11/82C 07/82C SUS dEHANNA 2 0
03/51C 03/81C 04/81C 08/81C 07/81C 07/82C 03/83 10/81C 04/82C 12/83 01/84 UASHINGTON t:UCLEAR 2 0
07/81C 05/32C 03/82C 10/82C 12/81C 11/82 12/82 N/A N/A 08/83 09/83 i
!! A T ER F 01D 3 0
05/81C 05/81C 07/81C 08/81C 09/81C 09/S2C 10/82C 03/82C 11/82C 04/83 05/83 UATIS BAR 1 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 09/82C N/A N/A 07/83 08/83 ZIMMER 1 0
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C 06/82C 08/83 09/83
- LICENSING SCHEDULES AND DECISICN DATES DO NOT REFLECT POTENTIAL DELAY FROM Et1ERGENCY PREPAREDNESS REVIEW.
_,_____m LICENSING SCHEEULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1933 IS$dE APPL. CONST.
l PLANT SSER COMPLETE I
I BELLEFONTE 1 09/84 05'85 BELLEFONTE 2 N/S 05/86 i
BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 BYRON 2 N/S 04/84 I
CALLAWAY 1 12/82 04/84 CATAWBA 1 04/83 11/84 CATAWBA 2 N/S 03/87 CLINTON 2 N/S CDMANCHE PEAK 2 11/83 12/84 FERMI 2 (FSAR RESUB)
GRAND GULF 2 N/S N/S I
HARRIS 1 04/84 06/85-NARRI5 2 N/S N/$
1 LIMERICK 1 10/83 10/84 LIMERICK 2 N/S r
MILLSTONE 3 01/85 12/85 PALO VERDE 2 10/83 08/84 PALO VERDE 3 N/S 11/85 i
PERRY 2 N/S 05/87 l
RIVER BEND 1 05/84 04/85 i
RIVER BEND 2 N/S SEABROOK 1 03/83 05/84 SEABROOK 2 02/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 f
WASHINGTON NUCLEAR 1 N/S N/S WASHINGTON NUCLEAR 3 12/84 12/85 WATTS BAR 2 06/84 08/84 l
WOLF CREEK 1 08/82C 10/84 I
f r
1 i
i f
r i
i 1
r-
2 LfCENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPSRT AS OF8 11/30/82 (LISTED IN ORDER OF FACILITY NAME)
SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT pf_)
TO D(
if_g 11TQ f_E.1 TO DL 11ER OF HRG DECISION R&li (SP)FNP 1-8 (MANUF.)
07/74C 08/75C 09/75C 04/76C 10/75C 03/76C 09/81C 06/76C 06/82C 11/82 CLINCH RIVER 02/76C 01/83 03/83 05/83 02/77C 06/83 07/83 08/82C 04/84 64/84 PEBBLE SPRINGS 1 82 01/75C 12/75C 01/76C 02/76C-04/75C 12/77C N/S N/S N/$
N/$
SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 01/83 12/82 11/82C 11/82 07/75C 04/83 07/83 l
I I
J i
i h
I i
NEW APPLICA TION F 0 R E C A S T --- 0 P E R A T ING LICEN5E OEV IEWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING:
11/30/82 LICENSING APPL.
APPL.
1ST UNIT DOCKET PROJECT SUBNITS SUBMITS CONST.
FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL FV83 MILLSTONE 3 050-00423 NORTHEAST N3 CLEAR ENERGY
. UNASSIGNED 10/29/82C 10/29/82C 12/00/85 M.ROTHSCHILD MAR 5LE HILL 1 82 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/01/82 12/01/82 06/00/86 R.LESSY BEAVER VALLEY 2 050-00412 DUQUESNE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/31/85 J.GUTEIRREZ HINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER D. LYNCH 01/00/83 Of/03/83 03/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS
. UNASSIGNED 03/00/83 03/00/83 06/00/86 R. BLACK V0GTLE 1 4 2 0424 0425 GEORGIA POWER E.DOOLITTLE 07/00/83 09/00/83 09/00/86 B.BORDENICK FY86l NORTH ANNA 3 050 00404 VIRGINIA ELECTRIC 8 POWER
. UNASSIGNED 04/00/86 04/00/86 04/00/89 M.WILCOVER l
HEW APPLICATION F 0 R E C A S T -- C O N S T R U C T I O N P E R M I T 'S AS 0F WEEK ENDING:
11/30/82
= = = - - - - - -
HAME UTILITY HUMBER MANAGER SUB. DATE SUB. DATE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - = - - - - _ _
e---------es
_--en----_
____y l CARROLL 1 &2 COMMONWEALTH EDIS0N 559 J. WILSON 10/OS/84 15/08/84 l
__=. __ ____
i n
d 1
t t
i 1
C0MM0N ABBREV IATIONS U$ED WITHIN THE PUBLICATION ACRS: ADVISORY COMMITTEE ON REACTGR SAFEGUARDS L.A.:
LICENSING ASSISTANT AE ARCHITECT / ENGINEER LESR8 LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)
AEB ACCIDENT EVALUATION BRANCH LGRE LICENSING GUIDANCE BRANCH ASB AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOMIC SAFETY LICENSING BOARD LQB LICENSEE QUALIFICATIONS BRANCH 88R8 BURNS 8 RDE MEB MECHANICAL ENGINEERING BRANCH B4V:
BLACK 8 VEACH MPA:
MANAGEMENT AND PROGRAM ANALYSIS 88W:
BABCOCK 8 WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT MWT MEGAWATTS THERMAL BWR BOILING WATER REACTOR HSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CEB:
CHEMICAL ENGINEERING BRANCH OL:
OPERATING LICENSE COMB COMBUSTION ENGINEERING OLB OPERATOR LICENSING BRANCH CP:
CONSTRUCTION PERMIT OPS:
OFFSHORE POWER SYSTEMS CPB:
CORE PERFORMANCE BRANCH CSB CONTAINMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISON PDA:
PRELIMINARY DESIGN APPROVAL PG8E PACIFIC GAS & ELECTRIC DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISIDH PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:
ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGENCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:
ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCll ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSES!MEHT BRANCH F.R.:
FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCi FDA:
FINAL DESIGN APPROVAL FES:
FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT 58L:
SARGENT 8 LUNDY 58W:
STONE & WEBSTER SAB:
SITING ANALYSIS BRANCH G8H GIBBS 8 HILL SAR SAFETY ANALYSIS REPORT GHDRs GIBBS 8 HILL SDA STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB GEOSCIENCES BRANCH SER:
SAFETY EVALUATION REPORT SIB:
SYSTEMS INTERACTION BRANCH SP:
SPECIAL PROJECT HGB:
HYDROLOGIC AND GE0 TECHNICAL BRANCH SSC:
SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA:
TENNESSEE VALLEY AUTHORITY ICB INSTRUMENTATION AND CONTROL BRANCH UEC:
UNITED ENG. 8 CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST WESTINGHO*JSE
i l
M M
Z O
M
>=
0 uJ th
i PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS l
2-1 BELLEFONTE 1 8 2 2-35 CLINCH RIVER 2-38 (BOP)BOPSSAR/BSAR-205 2-48 (SP)FNP 1-8 (MANUF.)
2-2 BR AI C'400D 1 42 2-36 PEBBLE SPRINGS 1 82 2-39 (PGP)ESSAR/BSAR-205 2- ' 9 CARROLL SITE 2-3 BYRON 1 8 2 2-37 SKAGIT/HANFORD 182 2-40 (BOP)ESSAR/CESSAR-80 2-4 CALLAWAY 1 2-41 (BOP)ESSAR/RESAR-414 2-5 CATAWBA 1 82 2-42 (BOP)GAISSAR 2-6 CLINTON l 3 2 2-43 (BOP)GISBSSAR (W) 2-7 COMANCHE PEAK 1 82 2-44 (BOP)$WESSAR/BSAR-205 2-8 DIABLO-CANYDH 1 82 2-45 (NSS)CESSAR SYSTEM 80 2-9 ENRICO FERMI 2 2-46 (NSS)GESSAR SEVERE ACC 2-to FERMI 2 (FSAR RESUB) 2-47 (NSS)GESSAR-238 NI 2-11 GRAND GULF 1 &2 2-12 HARRIS 1 82 2-13 LASALLE 2 2-14 LIf1ERICK 1 &2 2-15 MCGUIRE 2 2-16 MIDLAN? 1 8 2 2-17 MILLST0t!' 3 2-13 PALO VERDE 1,2,3 2-19 PERRY 1 8 2 2-23 RIVER BEND 1 &2 2-21 SAN ONOFRE 3 2-22 SEABROCK 1 42 2-23 SHOREHAM 2-24 SOUTH TEXAS I 82 2-25 ST LUCIE 2 l
2-26 SUMMER 1 l
2-27 SUSQUEHANNA 1 82 2-28 WASHINGTON NUCLEAR t 2-29 WASHINGTON NUCLEAR 2 2-30 WASHINGTON NUCLEAR 3 2-31 WATERFORD 3 2-32 WATTS BAR 1 82 2-33 WOLF CREEK f 2-34 ZIMMER 1
~
HRR L2 CENSING SYSTEM PACE NO: 2-1 BELLEFGHTE 1 82 0L CURRENT STATUS REPORT REPORT AS OF 11/30/82 l
PLAHT CHARACTERI5TICSt KEY PERS0NNEL DOCKET NO 043880439 LIC. PM:
D. SCALETTI ASLB CHAIR: N/A APPLICANT:
TENHESSEE VALLEY AUTHORITY LIC. BC:
E. A DENS Af1 MEMBER 1:
N/A LOCATION:
6 MI NE OF SCOTTSBORD, ALA LIC. LA.:
M.
DUNCAN MEM3ER 22 N/A REGION:
2 AE TVA COUNSEL:
B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR NS$$
B8W ANTITRUST J. RUTBERG RESID. INSP J. WILCOX DESIGN PWR: 3760 MWT/123S MWE CONST: TVA RM ANALYST:
M. KING l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the review schedule has been,alayed.
The applicant has ER DOCKETED:
06/12/78 06/12/78C announced a delay in loading fuel to 05/8S.
The ER SITE VISIT COMPLETE:
02/20/82 06/17/82C ttaff is currently evaluating the iwpacts of this INPUT TO DES TO PM:
12/31/82 delay on the safety review schedule.
ISSUE DES:
01/15/83 RESPONSE TO COMMENTS ON DES:
05/22/83 ISSUE FES:
06/20/83 CURRENT ENV. STATUS:
As a rwsult of applicant's construction delay, the review schedule was delayed, and !s being re-evaluated.
SAFETY / HEARING MILESTONES:
The environmental site visit was completed on 6/17/82.
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED:
06/12/78C SAR Q'S RECEIVED BY PM:
11/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 02/28/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM 05/15/83 No hearing is anticipated.
ISSUE DRAFT SER:
12/01/83 INPUT TO SER:
03/15/84 ISSUE SER:
05/15/84 ACRS FULL COMMITTEE MEETING:
07/08/84 INPUTS TO SE SUPPLEMENT 1 07/29/84 ISSUE SE SUPPLEMENT 12 09/15/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Pending determination HEARING STARTED:
9/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A l
TECH SPECS COMPLETED:
03/00/85 C0K!!ISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/85 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
On 07/06/82 TVA revised fuel load date to 5/85.
Staff is CONSTRUCTION COMPLETION - APPL.:
05/00/85 07/06/82 evaluating impact on safety and environmental review schedules.
_m
NRR LICEN5 ING SYSTEM PAGE N0* 2-2 BRAIDWOOD 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 11/30/82 PL ANT CHARACTERIST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
045620457 LIC. PM:
L. OLSHAN ASLB CHAIR:
M. MILLER
/PPLICANT:
C 0":10t:WE ALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1:
R.
COLE LOCATION:
24 MI SSW OF JOLIET, ILL LIC. LA.:
M. RUSHBROOK MEMBER 2:
D. CALLIHAN REGIDH:
3 AE:
S8L COUNSEL:
D. HASSELL CONST. INSP J. NEISLER REAC. TYPE: PWR HSSS: WEST ANTITRUST B.
V0GLER RESID. INSP L. MCGREGOR DESIGN PUR 3425 MWT/1120 MWE CONST: CWE PM ANALYST:
M. KING 2
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Soveral portions are under contract review.
ER DOCKETED:
11/30/78C EP. SITE VISIT COMPLETE:
04/15/83 INPUT TO DES TO PM:
11/01/83 ISSUE DES:
01/00/84 RESPONSE TO COMMENTS ON DES:
04/01/84 ISSUE FES:
06/00/84 CURRENT ENV. STATUS:
Inactive.
SAFETY / HEARING MILESTONES:
I APPLTCATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/09/78 1?/30/78C SAR Q'S RECEIVED BY PM:
12/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/01/83 There will be a contested hearing.
ISSUE DRAFT SER 09/20/83 INPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETING:
01/00/84 INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 13 05/08/84 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Applicant has submitted antitrust information pursuant to HEARING STARTED:
10/00/84 s
Req. Guide 9.3.
ASLB INITIAL DECISION:
03/00/85 ASLB FINAL DECISION:
04/00/85 TECH SPECS COMPLETED:
04/00/85 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 FSAR Amendment No. 38 SCHED. DATE RECEIPT DATE l
NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/00/85 04/14/82 l
i 3 2
-lll+
i
- I 8
E
/
E T
0 T
CCCCCC CCCC C C. CC A
2 3 A
811122 881 1
1 2. 22 D 2
/
D 788888 7788 8 8~
88 8
1 M
//////
//// /
e/ //
T
/
O 1
A L
015515 6055 7
77 00 P
4 N
H Y A
33d000 2311 0
00 12 I
1 H
I E
U //////
//// / // //
E
/
E F TELGN T
158t34 6180 t
12 38 C
7 G O ILLNR C
100t00 0101 f
00 00 E
0 C
MOAIO A
R
- S SCCRF A
E E
T IRDMW T
T R
A 91122 8818 8
22 222 33333 3 A 3 O
D 88888 7788 8 88 888 88888 8 D 8 P
PP
/////
//// / // ///
///// /
/
E R
SS 15515 6055 7
77 000 00000 0
1 R
Ia NN D
31000 2011 0
00 121 00030 0
D 3 Al2II E
/////
//// / // ///
///// /
E
/
H H
58134 6180 1
12 382 37868 8 H 8
CRR..
C 00100 0101 1
00 001 00000 0
C 0
EETD S
S BBBSI LMMNS D
SEEOE E
N AMMCR V
O I
I:
E TD L
C CN P
E IE P
D S
R RM A
OK E
8 TA OOG D
S 2
S a
LOR M
EE L NBRER N
- q P
T RS N
AGBBE E
O S
M N
N O
E HNHDLG S
T E
PO O
- E2:
N RE I
T SUSLGN E
E S
N D T
T DM D O: D EC T
N LOUO0I N
L:
T O E Y
EETE INEHWI E
R OYRGVK O
PM N T
R BE R VLNV SOTDOL L
N T
MP E S E S
E IPEI IIEIP P
M 0 S
O M
E D DN S:
EPME
- CSLS R
M O LJMSBM E
CO M L
N EO R
CUEC DEIPIHE O
E P L
T O I
S I
T C
M T IS FS:
R PR T
EOEIO T E M
- IS DEE A R
EP RLDCDWP N
R T
DSE O G NECR RTE RSUR AA O
S R TS L
EID: T:
N OTE DFS:
E SE TILSH
.L I
E
- :.: SY A TV S S I
IER A
R TO T
STACDCL T
Y MCALUL T
E OEEE R TK L
OROE TTET INEIIU C
P PBLERA N KETDSF A ACSP TDTS E SE GNIPSLF U
S S
.STN E
CT N
E CO P LS L
NIFSS R
I D 'Q A NIA M
OITEOE H
TETE TE I
IEE T
U CCCUT N DSUUPU
/
L UUUU SUUA RBBHMUU S
Y IIIONM O
PSSS Y PRRR PSPS RPSM ALLCMSS N
G T LLLCAR R RRNSES T
PAAA NSNS CNSE ESSEOSS O
E I
EEIIRI E ASSS IIII AIIF HAATCII C
N A V
F K
N A
I T
E S
5 S N
E T C N t
I E
na L
R
)
u 8
s R
4 r
e 8
u R U lb 0
n p
a i
R C T
ro G
n LSE et E
e o
N 8EW v
R c
i 5WC en U
n t
L Si N
e a
a
(
m m
0
- T m
m r
5 L
.e S
o o
L SN dr E
c f
C IESO e
F n
,AHC us o
i I
se d
t D
su n
t T
NR is a
d s
OO s
e u
S SF E
ni d
l r
IK W
e e
u t
I DC M
ey.
t d
i EO brg e
e t
R R
0 on l
h n
H 2
eti p
c a
E TF 1
vas m.
s LO 1
amn o2 d
T 5A
/
hre c8 g
e 5EW T
ic 9
n t
C 4WS W
Ifi w1 i
t 0N M
nl e
r i
8 A
8OI to il a
m.
3 4MM 5
- nco vi
- e b3 R 5M R2 Se t
Ser SH u
t3 4O7 W4 Umd Urp U
r s9 n
A 0C13P3 Tenr T
A T
T
- et Al ao Al A.
Sse Tmn:
H Tp Tan Ty Uad NdeS i
Spgr Sti Sr.
Rhi EnmE C : :
ER unp n
.e3 T
u MedT OT:
PW
.Si
.ed v8 ItG DmnO NNN YP F dd Vme Go9 Tn.
NAeN 2
AO: T Adne N nh Rc1 Na E
m/
T TCIN N
Snav Eos Hs Acg M
AS 8
EITO
.G atl ri ih ie A
P N
KLAICI T
so Til Tdc TlR RI 1
CPCGAS NRts Nvb N
r Np TA L
A OPOEEE EEue Enu Ena Epo SSRS N
DALRRD RSor rep RIM rat EFE O
L R
R R
R T
W R
U U
U U
A E
Y P
C C
C C
L N
B l
l
NRR LICEN$ING
$YSTEM PAGE NO2 2-CALLAWAY 1 0L CURRENT STATUS REPORT REPORT AS OF 11/30/82 PLANT CHARACTERI$ TICS K EY PERS0NNEL8 DOCKET NO:
05000483 LIC PM:
G. EDISDN ASLB CHAIR J. GLEASON APPLICANT
- UNION ELECTRIC LIC. BC:
- 8. YOUNGBLOOD MEMBER 1 G. BRIGHT LOCATION:
10 MI SE OF FULTON, M0 LIC. LA.:
M. RUSHBROOK MEMBER 2:
J. K lit 4 E REGION:
3 AEt BECH COUNSEL R. LESSY CONST. INSP8 J. KONKLIN REAC. TYPE PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: J. HEISLER DESIGN PWRt 3425 MWT/1188 MWE CONST2 DANIEL RM ANALYST *
- 5. HEDLUND l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by HRC on 10/07/81 and the SER Supplement No. 1 was issued or ER DOCKETED:
12/12/80 12/12/80C 01/15/82.
SSER 2 is schedoled for 12/82.
ER SITE VISIT COMPLETE:
12/00/81 12/00/81C INPUT TO DES TO PM:
08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:
12/01/81 12/01/81C i
i ISSUE FES:
01/29/82 01/29/82C
{
l CURRENT ENV. STATUS:
ER was docketed 12/12/80.
THe DES was issued by NRC on 09/29/81 and the FES was issued on 01/29/82.
SAFETY / HEARING MILESTONES:
1 APPLICATION TENDERED:
10/25/79 10/25/79C SAR 00CKETED:
08/08/80 08/08/80C SAR Q'S RECEIVED BY PMt 12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/8tc CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hearings were held on limited issues during November 1981.
ISSUE DRAFT SER N/A The hearing on the one remaining contention, emergency INPUT TO SER8 09/11/88 09/tt/8tc preparedness, is scheduled for May, 1983.
ISSUE SER*
10/07/81 10/07/81C ACRS LETTER RECEIVED:
11/19/81 11/19/81C INPUTS TO SE SUPPLEMENT 28 01/01/82 Ot/01/82C ISSUE SE SUPPLEMENT 2 12/00/82 FEMA LETTER RECEIVED:
10/31/82 CURRENT ANTITRUST:
OL review ts in progress.
HEARING STARTED:
11/17/81 11/17/8tC ASLB INITIAL DECISION 10/00/83 ASLB FINAL DECISION:
11/00/83 TECH SPECS COMPLETED:
N/S COMMISSION DECISION:
03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 SCHED. DATE RECEIPT DATE,
NEW SLIPS / NOTES:
The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL.:
04/00/84 08/23/82 progress in order to make a new construction completion schedule estimate. An April 1984 estimate is based on the acolicant's recentiv revised fuel load date.
NRR LICENS ING SYSTEM PAGE NO: 2-5 CATAWBA 1 82 0L CURRENT STATUS REP 0RT REPORT A5 0F 11/30/82 PLANT CHARACTERI5 TIC 5:
KEY P E R S 0 N N E La DOCKET HO:
041380414 LIC PM:
K. JABBOUR ASLB CHAIR:
J. KELLEY APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
D. CALLINAN LOCATION:
6 MI HHW OF ROCK HILL, SC LIC. LA.:
M. DUNCAN MEMBER 2:
R.
FOSTER REGION:
2 AE:
DUKE COUNSEL:
G. JOHHSON CONST. INSc P. VAND00RN REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP K. VAN DOORN DESIGN PWR 3582 MWT/1145 MWE CONST: DUKE RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER is scheduled to be completed 02/06/83.
ER DOCKETED:
06/11/81 06/11/81C ER SITE VISIT COMPLETE:
10/15/81 10/15/81C INPUT TO DES TO PM:
06/25/82 07/29/82C ISSUE DES:
08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:
11/30/82 ISSUE FES:
01/05/83 CURRENT ENV. STATUS:
DES was issued on 08/11/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/07/81 04/07/81C SAR DOCKETED:
06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:
12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/19/82 CURRENT HRG. STATUS:
4WPUT TO DRAFT SER TO PM 12/01/82 Combined hearing anticipated to start 09/83.
ISSUE DRAFT SER:
11/30/82 INPUT TO SER:
01/09/83 ISSUE SER:
02/06/83 ACRS FULL COMMITTEE MEETING:
03/10/83 INPUTS TO SE SUPPLEMENT 18 04/12/83 ISSUE SE SUPPLEMENT 1:
04/30/83 FEMA LETTER RECEIVED:
03/30/83 CURRENT ANTITRUST:
i HEARING STARTED:
09/28/83 Complete.
ASLB INITIAL DECISION:
03/00/84 l
ASLB FINAL DECISION:
04/00/84 l
TECH SPECS COMPLETED:
COMt1ISSION DECISION:
09/00/84 ISSUE LIC. WITH. POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CP Amend. issued 12/23/80 indicating change in ownership.
CONS 1RUCTION COMPLETION - APPL.:
11/00/84 05/00/82 Staff is reassessing standard assumptions for projecting hoaring schedules for plants with const. completion dates bevond '82.
This re-assess. may result in a new schedule.
NRR LICEN$ING SYSTEM PAGE NO: 2-6 CLINTON 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 11/30/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
046180462 LIC. PM:
H. WILLIAMS ASLB CHAIR:
H. CLARK APPLICANT:
ILLINOIS POWER LIC. BC:
C. THOMAS MEMBER 1 G.
FERGUSON LOCATION:
6 MI E OF CLINTON, ILL LIC. LA.:
P. ANDERSON MEMBER 28
- 0. PARIS REGION:
3 AE S8L COUNSEL:
R. GODDARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR HSSS: GE ANTITRUST:
B. V0GLER RESID. INSP: H. LIVERMORE DESIGN PWR 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80.
SER was issued 02/17/82.
I Supplement No. 1 was issued 07/22/82.
ER DOCKETED:
03/01/81 09/08/80C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
12/08/81 12/08/81C ISSUE DES:
12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C l
ISSUE FES:
05/20/82 05/20/82C CURRENT ENV. STATUS:
The draft environmental statement was completed December 1981 The FES was completed May 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DOCKETED:
09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TG Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Two petitions for leave to intervene were filed.
The ISSUE DRAFT SER:
State of Illinois filed under 10 CFR 2.715(c;.
INPUT TO SER:
12/05/81 12/05/81C A prehearing was held on 04/14/81 A second ISSUE SER:
01/05/82 02/17/82C l
prehearing was held 05/04/82.
ACRS LETTER RECEIVED:
02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 18 06/30/82 06/30/82C ISSUE SE SUPPLEMENT 18 06/30/82 07/22/82C FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
l Operating license antitrust review completed HEARING STARTED:
04/08/83 f
March 18, 1982 (SECY-82-120).
ASLB INITIAL DECISION:
09/00/83 ASLB FINAL DECISION:
10/00/83 TECH SPECS COMPLETED:
COMMISSION DECISIONA 12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 FSAR Amendment 818, 09/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
IPC announced fuel load date of 1/84 by letter dated CONSTRUCTION COMPLETION - APPL.:
01/00/84 04/21/82 04/21/82. Stop work orders associated with construction QA may impact fuel load date.
= _. -
PAGE 540 2-7 NRR LICENSING SYSTEM l
COMANCHE PEAK 1 82 0L CURRENT STA TUS REPORT REPORT AS OF 11/30/82 KEY P E R S 0 N N E La PLANT C H A R A C T E R I S T I C 5:
LIC. PM:
S. BURWELL ASLB CHAIR:
M. MILLER DOCKET NO:
044580446 APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
B. YOUNGBLCOD MEMBER 1 R. COLE LOCATION:
4 MI N OF GLEN ROSE, TEX LIC. LA.:
M. RUSHBROOK MEMBER 2 K. MCCOLL0M REGION:
4 AE:
CSN COUNSEL:
M. ROTHSCHILD CONST. INSP R. TAYLOR REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP D. KELLY DESIGN PWR: 3411 MWT/1150 MWE CONST: BRRT RM ANALYST:
M. KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
The SER was issued 07/14/81 The staff deferred scheduling 01/19/79 01/19/79C the Comanche Peak review by the ACRS until sufficient ER DOCKETED:
information was provided to resolve a large number of open ER SITE VISIT COM.PLETE:
06/20/80 08/07/80C issues.
SSER 81 was issued 10/16/81.
Application was INPUT TO DES TO PM:
08/15/80 04/27/81C reviewed by the ACRS on 11/13/81.
SSER 82 responding to ISSUE DES:
04/30/81 05/22/81C the ACRS was issued on 01/20/82.
SSER 83 is scheduled RESPONSE TO COMMENTS ON DES:
07/19/81 08/28/61C ISSUE FES:
09/18/81 09/24/81C to be issued 11/30/32.
CURRENT ENV. STATUS:
The DES was issued on 05/22/81.
The EPA Federal Register Notice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:
ended 07/13/81.
The FES was issued on 09/24/81.
APPLICATION TENDERED:
03/01/78 03/01/78C SAR DOCKETED:
05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:
12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C CURRENT HRG. STATUS:
The first hearing session was held 12/02/81 in Fort Worth.
ISSUE DRAFT SER:
03/31/81 03/31/81C INPUT TO SER:
05/22/81 07/08/81C Issues heard were financial qualifications and the operating QA program.
A second and third hearing session ISSUE SER:
07/14/81 07/14/81C on QA/QC during construction were held 06/07-11/82 and ACRS LETTER RECEIVED:
11/17/81 11/17/81C 07/26-30/82.
A fourth hearing session will be held on QA/QC during construction. The fifth hearing session is INPUTS TO SE SUPPLEMENT 3:
11/15/82 ISSUE SE SUPPLEMENT 3 11/30/82 expected to completa the remaining contention, emergency FEMA LETTER RECEIVED:
06/00/83 plans, and is unscheduled.
CURRENT ANTITRUST:
ALJ appointed on 02/23/82 to replace ASLB.
Prehearing HEARING STARTED:
12/02/81 12/02/81C conference hnid 04/13/82 to determine status of parties.
ASLB INITIAL DECISION:
01/00/83 Briefs filed 05/04/82 request immediate imposition of ASLB FINAL DECISION:
05/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:
05/00/83 approving settlement agrertents 8 proposed license COMMISSION DECISIDH:
05/00/83 conditions 8 di smi ssing proceedings was i ssued 05/06/82.
ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:
06/00/83 LATEST AMENDMENT:
34 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
SSER #3 has been delayed an additional four weeks due to CONSTRUCTION COMPLETION - APPL.:
06/00/83 10/29/81 staff resources.
The delay will not impact the hearing schedule.
NRR LICENSING SYSTEM PAGE NO: 2-8 DIABLO-CANYON 1 8 2 0L CURRENT STATUS REPQRT REPORT AS OF 11/30/82 PL A NT CHA R.A C T E R I S T I C S:
KEY PERS0NNEL DOCKET NO:
027580323 LIC. PM:
B. BUCKLEY ASLB CHAIR:
J. WOLF APPLICANT:
PACIFIC GAS 8 ELECTRIC LIC. BC:
G.
KNIGHTON MEMBER 1 J. KLINE LOCATION:
12 MI WSW OF SAN LUIS OBISPD LIC. LA.:
J. LEE MEMBER 2:
G. BRIGHT REGIDH:
5 AE:
PC8E COUNSEL:
B JONES CONST. INSP D. KIRSCH REAC. TYPE: PWR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP J. CARLSON DESIGN PWR 3338 MWT/1084 MWE CONST: PG8E RM ANALYST B. ST MARY CURRENT dAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER 15 (Equip. Qualification) was issued on 10-02-81.
SSER 16 is estimated for 02/07/83 (indicated as SSER9 ER DOCKETED:
11/09/71 11/09/71C on schedule).
Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:
full pcwer license was issued on August 31, 1982.
Low INPUT TO DES TO PM 10/09/72 10/09/72C Power license w.3 issued on 09-22-81 and suspended on ISSUE DES:
12/12/72 12/12/72C November 19, 1981.
RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C ISSUE FES:
09/15/75 05/28/76C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY FM:
01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/Of/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/24/75 01/24/75C LP hearings were held 05-19-81 through 05-22-81.
A ISSUE DRAFT SER:
favorable PID on low oower operation was issued July INPUT TO SER:
01/24/75 Ot/24/75C 17, 1981 A full power hearing was completed on January ISSUE SER:
10/04/74 10/16/74C i
26, 1982.
In August an Initial Decision was issued l
authorizing issuance of a full power operating license.
ACRS LETTER RECEIVED:
05/00/78 07/18/78C INPUTS TO SE SUPPLEMENT 98 01/25/83 ISSUE:SE SUPPLEMENT 9 02/07/83 FEMA LETTER RECEIVED 11/15/82 CURRENT ANTITRUST:
Not required HEARING STARTED:
10/29/75 12/07/76C ASLB INITIAL DECISION:
07/17/81 07/17/8tC ASLB FINAL DECISION:
09/00/82 08/31/82C TECH SPECS COMPLETED:
09/15/81 09/15/81C COMr1ISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION: 09/22/81 09/22/81C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S l
NEW SLIPS / NOTES:
Est. of dates frem end of LP hrq to lic. complete CONSTRUCTION COMPLETION - APPL.:
dependent upon dev./ approval of State and local Emergency Plans.
Ongoing Design Verif. Program likely to identify olant modifications.
Const. comnletion denendent on mods.
NRR L ICEN$ING
$YSTEM PAGE NO: 2 -- 9 ENRICO FERMI 2 0L CURRENT
$TATUS REP 0RT REPORT AS OF ff/30/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
05000341 LIC. PM:
L. KINTHER ASLB CHAIR G. MILLHOLLIN APPLICANT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSNBROOK MEMBER 2:
D. SCHINK REGION:
3 AE:
58L COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:
A.
HODGDON RESID. INSP B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST DANIEL RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81.
(See second page for milestone ER DOCKETED:
04/04/75 04/04/75C summary.)
SSER No. I was issued 09-25-81.
SSER No. 2 was ER SITE VISIT COMPLETE:
09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.
INPUT TO DES TO PM:
07/31/81 04/24/81C SSER No. 3 is scheduled for issuance on 11-30-82.
ISSUE DES:
05/01/81 04/30/81C RESPONSE TO COMMENTS ON DES:
07/31/81 06/29/8tc ISSUE FES:
08/31/81 09/04/8tC CURRENT ENt'. STATUS:
1 Addendum No. 1 to the FES uas issued 03-03-82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:
06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76 C INPUT TO DRAFT SER TO PM:
10/24/75 03/08/76C CURRENT HRG. STATUS:
A hearing on two issues began on 03-31-82 and a,ded on ISSUE DRAFT SER:
04-02-82.
The two contentions were: (t) QA/QC during INPUT TO SER:
03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:
08/01/77 09/29/77C the local community. Proposed findings completed by by applicant and staff. Monroe County, Michigan ACRS LETTER RECEIVED:
08/20/81 08/11/81C petitioned for leave to reopen hearings on the INPUTS TO SE SUPPLEMENT 38 11/30/82 evacuation issue.
ASLB issued initial decision on ISSUE SE SUPPLEMENT 3:
11/30/82 10/29/82 authorizing operating license issuance.
FEMA LETTER RECEIVED:
05/01/83 CURRENT ANTITRUST:
HEARING STARTED:
12/02/81 03/31/820 An ASLB decision on antitrust matters was issued on ASLB INITIAL DECISION:
10/00/82 10/29/82C 04-25-78.
ASLB FINAL DECISION:
11/00/82 TECH SPECS COMPLETED:
04/01/83 COMMISSION DECISIDH:
05/01/83 ISSUE LIC. WITH POWER RESTRICTION: N/A ISSUE FULL POWER LICENSE AMEND:
08/01/83 LATEST AMENDMENT:
The latest final Safety Analysis Report Amendment is number SCHED. DATE RECEIPT DATE 43.
NEW SLIPS / NOTES:
Issuance of SE Supplement 3 slipped 2 months due to later CONSTRUCTION COMPLETION - APPL.:
08/01/83 10/01/82 responses from applicant and later SE input.
There is no impact on OL issuance.
I
HRR LECEN3IHG SYSTEM PAGE NO 2-10 FERMI 2 (FSAR RESUB)
OL CURREH T STATUS REPORT REPORT AS OF 11/30/82 PLANT CHARACTERI5TICSt KEY PERS0NNEL DOCKET NO:
00007341 LIC. PM:
L. KINTHER ASLB CHAIR:
G. MILLHOLLIN APPLICANT:
DETROIT EDISDN LIC. BC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUHA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 2 D. SCHINK REGION:
3 AE:
58L COUNSEL:
C. WOODHEAD CONST. INSP: P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST A. HODGDON RESID. INSP B. LITTLE DESIGH PWR 3292 MWT/1093 MWE C0HST: DANIEL RM AHALYST:
S. HEDLUND CURRENT SAF. STATUS:
SCHED. DATE ACTUAL DATE All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.
Summar/ of later milestones is on previous page.
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:
07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
09/08/78 03/27/8tC ISSUE DRAFT SER:
INPUT TO SER:
06/10/81 06/23/3tc ISSUE SER:
06/30/81 07/10/81C
+
j i
l CURRENT ANTITRUST LATEST AMENDMENT:
MEW SLIPS /HOTES:
All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI cause.
HRR LICENSING SYSTEM PAGE NO: 2 -11 f
GRAND GULF 1 8 2 LIC CURRENT STATUS REP 0RT REPORT AS OF 11/30/82 PLANT C H A R A C T E R I 5 T I C S:
KEY PERS0NNEL DOCKET NO:
041680417 LIC. PM:
D. HOUSTON ASLB CHAIR J. LAURENSON APPLICANT:
MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC A.
SCHWENCER MEMBER 1 G.
BRIGHT LOCATION:
25 MI $ OF VICKSBURG, MISS LIC. LA.:
E. HYLTON MEMBER 28 J. HARBOUR REGION:
2 AE BECH COUNSEL:
M.
WAGNER CONST. INSP R. VANDORN I
REAC. TYPE: BWR NSS$8 GE ANTITRUST:
B. V0GLER RESID. INSP A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST: BECH RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIR0hMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.
An initial ACRS meeting was held Oct. 15, 1981.
SSERs were issued in ER DOCKETED:
06/05/78 06/30/78C December 1981 and in June and July 1982.
A second ACRS ER SITE VISIT COMPLETE:
12/14/79C meeting was held on August 12, 1982 on Hydrogen, HCU INPUT TO DES TO PM:
04/30/81 04/30/81C floor loads, and management staffing and capability.
ISSUE DES:
05/31/81 05/31/81C The ACRS report on full power operation was issued RESPONSE TO COMMENTS ON DES:
08/15/81 08/15s01C August 18, 1982.
ISSUE FES:
09/15/81 10/09/81C J
CURRENT ENV. STATUS:
FES was issued October 9, 1981.
DES was issued in May 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/28/78 04/28/78C SAR DOCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:
04/24/79'.
SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S No hearing. Petition was filed by the State ISSUE DRAFT SER:
09/18/81C of Louisiana on basis of Court of Appeals, District of INPUT TO SER:
04/01/81 08/14/81C Columbia, opinion on S-3 Table issue.
Board denied petition ISSUE SER:
06/00/81 09/10/81C for intervention on October 20, 1982.
The State of Louisiana has filed an appeal to the Board's denial.
ACRS LETTER RECEIVED:
07/00/81 08/18/82C INPUTS TO SE SUPPLEMENT 4 11/20/82 ISSUE SE SUPPLEMENT 4:
12/01/82 FEMA LETTER RECEIVED:
11/17/82 CURRENT ANTITRUST:
OL review is in progress. No significant changes have HEARING STARTED:
N/A occurred since the CP.
ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
TECH SPECS COMPLETED:
09/01/81 06/16/82C COMMISSION DECISION:
02/00/83 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/31/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Unit 1 OL authorizinq fuel load up to 5% power was issued CONSTRUCTION COMPLETION - APPL.:
06/16/82C 06/16/82. Full power date delayed due to licensee's desire to complete number of outstanding items and accomolish mainter,ance 8 mods for first refuelino outaae.
g I
i
\\
_o
NRR L ICEN5IHC SYSTEM PACE HO 2-12 HARRIS 1 &2 0L CURRENT
$TA TUS REPQRT REPORT AS OF: If/30/82 PLAHT CHARACTER ISTICS:
KEY PERS0NNEL DOCKET NO:
0400-0401 LIC. PM:
P. KADAMBI ASLB CHAIR:
J. KELLEY APPLICANT:
CAROLINA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
G. BRIGHT LOCATION:
20 MI SW OF RALEIGH, HC LIC. LA.
J. LEE MEMBER 28 J. CARPENTER REGIDH:
2 AE:
EBASCO COUNSEL:
C. BARTH CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. IHSP: G. MAXWELL DESIGH PWR: 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST:
M. KING l
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
FSAR was docketed on 12/22/81.
Review has started.
Questions were sent to tha applicant between 4/26/82 ER DOCKETED:
12/22/81 12/22/81C and 7/30/82. Mosi of applicant's rasponses were ER SITE VISIT COMPLETE:
04/08/82 04/08/82C INPUT TO DES TO PM:
01/14/83 received by 08/31/82.
ISSUE DES:
02/21/83 RESPONSE TO COMMENTS ON DES:
06/10/83 ISSUE FES:
08/15/83 CURRENT ENV. STATUS:
l' ER was docketed on 12/22/81.
The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:
04/28/82. Most of the applicant's responses were received APPLICATION TENDERED:
06/26/80 06/26/80C by August 17, 1982.
SAR DOCKETED:
12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:
10/15/82 CURRENT HRG. STATUS:
Hotice for Opportunity for Hearing was published in the ISSUE DRAFT SER:
01/03/83 Federal Register on January 27, 1982.
Several petitions INPUT TO SER:
09/01/*3 were filed.
Prehearing conference on petitions was held ISSUE SER:
11/01/83 on July 13-14, 1982.
ACRS FULL COMMITTEE MEETING:
01/02/84 INPUTS TO SE SUPPLEMENT 1:
03/01/84 ISSUE SE SUPPLEMENT 18 04/02/84 FEMA LETTER RECEIVED:
04/00/84 CURRENT ANTITRUST:
HEARING STARTED:
09/03/84 Status to be determined.
ASLB INITIAL DECISIDH 05/01/85 ASLB FINAL DECISIGHz 05/00/85 TECH SPECS COMPLETED:
11/01/84 l
COMMISSION DECISION:
05/00/85 l
ISSUE LIC. WITH POWER RESTRICTION:
12/01/84 ISSUE FULL POWER LICENSE AMEND:
06/03/85 LATEST AMENDMENT:
FSAR Ho. 4 ER Ho. 4 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
CONSTRUCTION COMPLETION - APPL.:
06/03/85 10/06/82 Staff slipped schedule, resulting in fuel load date slipping six months to 06/03/85.
i NRR L ICEHSIHG SYSTEM PAGE NO: 2-13 LASALLE 2 0L CURREHT STATUS REPORT REPORT AS OF 11/30/82 PLANT CHARACTERIST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000374 LIC. PM:
A.
BOURNIA ASLB CHAIR M. MILLER APPLICANT:
COMM0HWEALTH EDISON LIC. BC A.
SCHWEBCER MEMBER 1:
F.
SHON l
LOCATIDH:
11 MI SE OF OTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 28 0.
PARIS REGION:
3 AE:
58L COUNSEL:
C. WOODHEAD CONST. INSP:
H.
WESCOTT l
REAC. TYPE: BWR HSSS: GE ANTITRUST B.
V0GLER RESID. INSP W. GULDEMOND DESIGN PWR: 3293 MWT/1078 MWE CONST: CWE RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 was issued in February 1982.
SSER-3 was issued on April 16, 1982.
ER DOCKETED:
01/17/77 05/12/77C SSER-4 was issued on July 14, 1982.
SSER-5 is scheduled ER SITE VISIT COMPLETE:
for 11/83.
INPUT TO DES TO PM:
02/17/78 02/17/78C ISSUE DES:
03/22/78 03/29/78C RESPONSE TO COMMENTS OH DES:
07'14/78 07/14/78C ISSUE FES:
09/22/78 11/03/78C CURRENT EHV, STATUS:
Envircnmental Protection Plan has been issued with Unit 1 license.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/01/76 09/01/76C SAR DOCKETED:
04/05/77 05/12/77C SAR Q'S RECEIVED EY PM:
07/22/77 07/27/77C i
SAR APPL. RESPONSE TO Q'S RECEIVED: 12/15/77 08/18/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/06/71 11/08/78C No hearing.
ISSUE DRAFT SER:
IHPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/80 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 5:
12/00/82 ISSUE SE SUPPLEMENT 5 01/00/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Complete.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISI0H N/A TECH SPECS C0t1PLETED:
04/12/82 04/12/82C COM:1ISSION DECISIGH z 03/00/83 ISSUE LIC. IIITH POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL ?OWER LICENSE AMEND:
04/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
Lasalle Unit 1 criticality was achieved on June 21, 1982.
CONSTRUCTION COMPLETION - APPL.:
04/00/83 07/10/82
NRR LICEHSING SYSTEM PAGE NO: 2-14 LIMERICK 1 3 2 0L CURRENT STATUS REP 0RT REPORT AS GF: 11/30/82 PLAN T CHAL ACTERISTICSt KEY PERS0HHEL COCKET NO:
03S2803S3 LIC. PM:
H. ABELSON ASLB CHAIR:
L. BRENNER APPLICANT:
PHILADELPHIA ELECTRIC LIC. BC:
A.
SCHWEHCER MEMBER 1:
R. COLE LOCATION:
3S MI NW OF PHILADELPHIA, PA LIC. LA.:
E. HYLTON MEMBER 2:
P. MORRIS REGIGH:
1 AE:
BECH COUNSEL:
A.
HODGDON CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP: S. CHAUDHARY DESIGN PWR: 3440 MWT/1065 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981.
SAR was docketed on 07/27/81 ER DOCKETED:
07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; draft ER SITE VISIT COMPLETE:
08/20/82 08/20/82C NUREG/CR on PRA scheduled for issuance 10/15/82.
INPUT TO DES TO PM:
03/25/83 ISSUE DES:
05/06/83 RESPONSE TO COMMENTS ON DES:
09/06/83 ISSUE FES:
10/31/83 CURRENT ENV. STATUS:
ER uas tendered with the FSAR on March 17, 1981 and was docketed on 07/27/81 ER site visit was completed SAFETY / HEARING MILESTONES:
on 8/20/82.
APPLICATION TENDERED:
01/00/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TC Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM 01/07/83 Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:
02/04/83 Federal Register on August 21, 1981.
Pre-hearing INPUT T3 SER:
07/01/83 conference held January 6-8, 1982.
A special pre-hearing ISSUE SER:
08/08/83 conference order was issued on June 1,
1982.
Early hearings on three contentions related to Point Pleasant diversion ACRS FULL COMMITTEE MEETING:
09/08/83 were held the week of October 4, 1982, and continued during IHPUTS TO SE SUPPLEMENT 13 10/07/83 the week of October 18, 1982.
ISSUE SE SUPPLEMENT in 10/30/83 FEMA LETTER RECEIVED:
10/07/83 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
04/00/84 ASLB INITIAL DECISION:
09/00/84 ASLB FINAL DECISION:
10/00/84 TECH SPECS COMPLETED:
N/S COMMISSION DECISI04:
10/00/84 ISSUE LIC. WITH POWER RESTRICTION:
10/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S
- ev.
6.
September 28, 1982 (ER OL) av.
10, September 28, 1982 (FSAR)
SCHED. DATE RECEIPT DATE HL. SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
10/00/84 04/27/82 i
NRR LICEN5ING SYSTEM PAGE NO: 2-15 MCGUIRE 2 CURRENT STATUS REP 0RT REPORT AS OF 11/30/82-l PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
0500037C LIC. PM:
R.
BIRKEL ASLB CHAIR:
R. LAZO APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1 X.
HAND LOCATION:
17 MI N 0.5 CHARLOTTE, NC LIC. LA.:
M. DUNCAN MEMBER 2:
E.
LUEBKE REGION:
2 AE DUKE COUNSEL:
J. CUTCHIN CONST. INSP: M. HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP P. BEMIS DESIGN PWR 3411 MWT/1180 MWE CONST DUKE RM ANALYST B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82, with issuance of the supplement scheduled ER DOCKETED:
05/31/74 05/31/74C for 01/01/83.
ER SITE VISIT COMPLETE:
01/30/75 01/30/75C INPUT TO DES TO PM:
08/29/75 08/29/75C I
ISSUE DES:
11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:
ISSUE FES:
05/07/76 04/20/76C CURRENT ENV. STATUS:
Complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/05/74 04/05/74C I
SAR DOCKETED:
04/29/75 05/05/75C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
Complete.
ISSUE DRAFT SER:
INPUT TO SER:
06/01/77 01/16/78C ISSUE SER:
02/21/78 03/01/78C
+
ACRS LETTER RECEIVED:
04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6 12/01/82 ISSUE SE SUPPLEMENT 63 01/01/83 FEMA LETTER RECEIVED:
CUR ENT ITRUST:
o El HEARING STARTED:
03/15/77 03/28/77C ASLB INITIAL DECISION:
06/00/81 06/08/81C ASLB FINAL DECISION:
03/30/82 03/30/82C TECH SPECS COMPLETED:
12/08/82 COMf1ISSION DECISION:
03/01/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/01/83 No. 69 (October 1,
1982)
SCHED. DAT,E RECEIPT DATE HEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/01/83 05/20/82
W HRR LTCEN5ING SVSYEM PAGE NO: 2-96 MEDLAND 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF: 11/30/82 PLANT CHARACTERI5 TIC 5:
KEY PERS0NNEL:
DOCKET NO:
033080329 LIC. PM:
D. HOOD ASLB CHAIR:
C.
BECHHOEFER APPLICANT:
CONSUMERS POWER LIC. BC:
E. ADENSAM MEMBER 1:
F. COWAN LOCATION:
SW BOUNDARY OF MIDLAND, MICH.
LIC. LA.:
M. DUNCAN MEMBER 2:
J. HARBOUR REGION:
3 AE BECH COUNSEL:
W. PATON CONST. INSP: R.
LANDSMAN REAC. TYPE: PWR NSSS: B8W AHTITRUST:
B.
V0GLER RESID. INSP R. COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH RM AHALYST B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other scencies to complete some review areas is currently ER DOCKETED:
04/01/78 0 4/14/ 78 C in progress.
CP extension was issued 12/28/81.
ACRS ER SITE VISIT COMPLETE:
09/08/78 09/08/78C Full Committee Meeting was held 06/04/82. SSER #1 IHPUT TO DES TO PM:
02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82.
SSER #2 ISSUE DES:
02/05/82
'02/05/82C-on soils settlement problems was issued 10/06/82.
RESPONSE TO COMMENTS ON DES:
07/08/82 07/08/82C-i ISSUE FES:
07/30/82 07/30/82C CURRENT ENV. STATUS:
The DES was issued 02/05/82. The FES was issued on July 30, 1982.
SAFETY / HEARING MILEST0HES:
APPLICATION TENDERED:
08/31/77 08/31/77C SAR DOCKETED:
09/30/77 11/18/77C SAR Q'S RECEIVED BY PM:
03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C t
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C l
Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:
N/A l
separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/82C settlement began July 7, 1981 and is continuing. Combined ISSUE SER:
05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.
ACRS LETTER RECEIVED:
06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 2:
08/16/82 08/16/82C ISSUE SE SUPPLEMENT 22 10/06/82 10/06/82C
. FEMA LETTER RECEIVED:
11/01/82 CURRENT ANTITRUST:
Proceeding completed. License was amended 10/20/80.
HEARING STARTED:
11/15/82 11/15/82C ASLB INITIAL DECISION:
07/00/83 ASLB FINAL DECISI0H:
08/00/83 TECH SPECS COMPLETED:
05/00/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/83 109 SCHED. DATE RECEIPT DATE I
NEW SLIPS / NOTES:
l Applicant announced on 11/16/32 that July 1983 completion CONSTRUCTION COMPLETION - APPL.:
07/00/83 03/31/82 date has slipped by "some months".
Applicant will develop revised schidule in first calendar quarter of 1983.
2
~--
~.._~_ ~. - _ -
-w
_. -.. ~..
NRQ LiCEHSING SYSTEM PAGE NO: 2-17 MILLSTONE 3 0L CURRENT STATUS REP 0RT REPORT AS OF: ff/30/82 PLA NT CHARACTER IST I C 5:
KEY PERS0NNEL DOCKET NO:
05000423 LIC. PM:
UNASSIGHED ASLB CHAIR APPLICANT:
NORTHEAST NUCLEAR ENERGY LIC. BC:
B. YOUNGBLOOD MEMBER 1 LOCATION:
5 MI SW OF HEW LONDON, COHK LIC. LA.:
M. RUSHBROOK MEMBER 2:
REGION:
1 iE 58W COUNSEL:
M. ROTHSCHILD CONST. INSP A. TOTH REAC. TYPE: PWR HSSS: WEST ANTITRUST:
M. BLUME RESID. INSP DESIGN PWR: 3565 MWT/1159 MWE CONST: 58W RM ANALYST:
L. LANIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Application was tendered on 10/29/82, and will be docketed ER DOCKETED:
02/01/83 4
in February, 1983.
ER SITE VISIT COMPLETE:
I INPUT TO DES TO PM:
ISSUE DES:
10/01/83 RESPONSE TO COMMENTS CH DES:
4 ISSUE FES:
04/01/84, i
CURRENT ENV. STATUS:
i ER to be docketed in February. 1983.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/01/82 10/29/82C' SAR DOCKETED:
02/01/83 SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
IHPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
Hotice of Opportunity for Hearing will be pubIlshed in the ISSUE DRAFT SER:
01/01/84 INPUT TO SER:
Federal Reqister.
ISSUE SER:
09/01/84 ACRS FULL COMMITTEE MEETING:
10/01/84 INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 18 01/01/85 FEMA LETTER RECEIVED:
CURRENT' ANTITRUST:
HEARING STARIED:
06/01/85 ASLB INITIAL DECISION:
12/01/85 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSIDH DECISI0H:
12/00/85 ISSUE LIC. WITH POWER RESTRICTIDH ISSUE FULL POWER LICENSE AMEND:
tATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
12/00/85 12/31/81 l
4 4
N 1
I N RR L ICENSING SYSTEM PAGE NC: 2-18 PALO VERDE 1,2,3 0L CURRENT STA TUS REPQRT REPORT AS OF 11/30/82 P L A ti T HA RA CT ERI5T I C 5:
KEY PERS0NNEL I
DCCKET NO:
0528-0530 LIC. PM:
E.
LICITRA ASLB CHAIR:
R.
LAZO ArrLICANT:
ARIZONA PUBLIC SERVICE LIC. BC:
G. KNIGHTON MEMBER 1:
R. COLE LOCATICH:
35 MI W OF PHOENIX, AZ LIC. LA.:
J.
LEE MEMBER 2:
D.
CALLINAN REGION:
5 AE:
BECH COUNSEL:
L. DEWEY CONST. INSP:
L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP:
G.
FIORELLI DESIGN FWP: 3817 MWT/1304 MWE CONST: BECH KM ANALYST S.
HEDLUND ENVIRONMENIAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAr. STATUS:
Several "Independant Design Review" meetings have been completed.
The SER s.as issued on November 11, 1988 SER ER DOCKETED:
07/01/80 06/20/80C supplement Hos.
1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:
01/30/81 01/30/8sc and May 17, 1982, and Sepicmber 23, 1982 respectively.
INPUT TO DES TO PM:
10/05/81 10/05/81C ISSUE DES:
10/26/81 10/26/81C RESPONSE TO COMMENTS ON DESr 02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C CURRENT ENV. STATUS:
The ER (CL) review is complete.
A site visit was completed on January 30, 1981 The DES was issued on SAFETY / NEARING MILESTOHES:
October 26, 1981 and the FES was issued on March 11, APPLICATION TENDERED:
10/05/79 10/05/79C 1982.
SAR DOCKETED:
06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
Five contentions were initially admitted. Two contentions ISSUE DRAFT SER:
l uero drerped by tha intervonor and two others were sunmarily INPUT TO SER:
10/30/81 10/30/81C i
disposed of by the Board.
The remaining contention deals ISSUE SER:
11/11/81 11/11/81C with water availability.
The hearing started 4/27-30, 1982, recured on 5/25-23 and again on 6-22.
Hearing record was ACRS LETTER RECEIVED:
12/18/81 12/18/81C closed on 6-25-82.
Findings by all parties have been filed.
INPUTS TO SE SUPPLEMENT 3 08/02/82 08/02/82C A late peti ti on, dated 10-13-82 dealing with salt drift on ISSUE SE SUPPLEMENT 3:
09/23/82 09/23/82C farm crops, was filed by W. Valley Agri. Protaction Council.
FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
HEARING STARTED:
04/27/82 04/27/82C Antitrust OL review is in progress.
ASLB INITIAL DECISION:
12/00/82 ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
08/01/83 COMMISSION DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 ISSUE FULL POWER LICENSE AMEND:
08/20/83 LATEST AMENDMENT:
FSAR Amendment No. 9 SCHED. DATE RECEIPT DATE ER Supplement No. 4 NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.
08/00/83 07/13/82 l
NRR L ICENSING SYSTEM PAGE NO: 2-19 PERRY I 82 0L CURRENT STA TUS REPORT REPORT AS OF 11/30/82 PLANT CHARACTERIST I C St KEY PERS0NNELe DOCKET NO:
044080441 LIC. PM:
J. STEFAN0 ASLB CHAIR P. BLOCH APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. BC:
A.
SCHWENCER MEMBER 1:
J. KLINE LOCATION:
7 MI NE OF PAINESVILLE, OHIO LIC. LA.:
E. HYLTON NEMBER 2 F.
SHON REGION:
3 AE:
GIL COUNSEL:
B. V0GLER CONST. INSP P.
PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST:
J.
CUTCHIN RESID. INSP: M. GILDNER DESIGN PWR: 3759 MWT/120S MWE CONST: KAISER RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l The Safety Evaluation Report was issued in May 1982.
l The ACRS Report was i ssued on July 16, 1982.
SSER Ho. 1 ER DOCKETED:
06/26/81 06/19/81C was issued on August 9, 1982.
SSER No. 2 to be issued ER SITE VISIT COMPLETE:
prior to start of ASLB hearings.
INPUT TO DES TO PM:
01/01/82 01/ 01/8 2C ISSUE DES:
02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:
06/30/82 06/30/82C ISSUE FES:
08/13/82 08/13/82C CURRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981 The ER was docketed June 19, 1981.
FES SAFETY / HEARING MILESTONES:
issued on August 13, 1982.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C Board Order dated September 16, 1982, targets start ISSUE DRAFT SER:
02/26/82 02/26/82C of hearing on February 15, 1983.
INPUT TO SER:
04/10/82 05/10/82C ISSUE SER:
05/10/82 05/24/82C ACRS LETTER RECEIVED:
07/16/82 07/16/82C INPUTS TO SE SUPPLEf1ENT 2:
11/20/82 I
ISSUE SE SUPPLEMENT 2:
12/15/82 FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
CP antitrust review has been completed. OL antitrust HEARING STARTED:
02/15.5) status is under review.
ASLB INITIAL DECISION 08/00/83 ASLB FINAL DECISION:
09/00/83 TECH SPECS C0f1PLETED:
06/00/83 C0f1f1ISSION DECISION:
10/C0/83 ISSUE LIC. WITH PCWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:
11/00/83 LATEST AMENDMENT:
Number 8 (8-25-82).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Start of hearing has slipped to February 1983.
CONSTRUCTION COMPLETION - APPL.:
11/00/83 02/22/82 FEMA letter has slipped to April 1983 due to incompleto offsite plans.
(
NRR L TCEN$ING SYS TEM PAGE NO:
2-20 RIVER EEND 1 &2 0L CURR NT STATUS REPORT REPORT AS OF: 11/30/82 i
PL 4NT CHA RA C T ER IST I C S:
KEY PERS0HH E L:
DOCKFT NO-045810459 LIC. PM:
. UNASSIGHED ASLB CHAIR:
B.
COTTER APPLICANT:
GULF STATES UTILITIES LIC. BC:
A.
SCHWENCER MEMBER 12 G.
LINEMBERGER LOCATION:
24 MI NNW OF BATON ROUGE, LA LIC. LA.
E. HYLTON MEMBER 2:
R.
COLE REGION:
4 AE:
58W COUNSEL:
L.
DEMEY CONST. INSP:
UNASSIGHED REAC. TYPE: BWR NSSS: GE ANTITRUST:
B.
V0GLER RESID. IHSP:
R.
BROW 4 DESIGH PWR: 3015 MWTfo934 MWE CONST: S&W FM ANALYST:
M.
KING EHVIRONMENTAL MILEST0HES:
SCHED. DATE ACTUAL DATE I CURRENT SAF. STATUS:
Applicant tendered FSAR for docketing on 04/24/81.
FSAR was docketed on 08/25/81.
Draft SER targeted for ER DOCKETED:
08/25/81 08/25/8tC 03/83.
Construction permit extension requested ER SITE VISIT COMPLETE:
01/22/82 Ot/22/82C from 03/83 to 12/85.
INPUT TO DES TO PM:
12/09/83 ISSUE DES:
01/09/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
06/08/84 l
I CURRENT ENV. STATUS:
l Applicant tendered ER for docketing on 04/24/81.
ER was docketed on 08/25/81.
DES targeted for 01/09/84.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/24/81 04/24/81C SAR DOCKETED:
08/25/81 08/25/81C l
SAR Q'S RECEIVED BY PM:
12/07/81 12/15/82C I
SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/82 INPUT TO DRAFT SER TO PM:
03/04/83 CURRENT HRG. STATUS:
Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
03/00/83 Federal Register on 09/04/81 Prehearing conference INPUT TO SER:
11/04/83 scheduled for 02/08/83.
ISSUE SER:
12/02/83 ACRS FULL COMMITTEE MEETING:
01/13/84 INPUTS TO SE SUPPLEMENT 12 04/00/84 ISSUE SE SUPPLEMENT 1:
05/00/84 FEMA LETTER RECEIVED:
05/01/84 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
10/00/84 ASLB IHITIAL DECISIGH:
03/00/85 ASLB FINAL DECISIGH:
04/00/85 TECH SPECS COMPLETED:
10/00/84 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 LATEST AMENDMENT:
Number 5.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
NRR/0L revised the priority of the review on this case due CONSTRUCTION COMPLETION - APPL.'
04/00/85 04/15/82 to 18-month slip in construction schedule.
/
HRR L ICENSI N G SYSTEM PAGE NO:
2-21 SAN ONOFRE 3 0L CURR ENT S TA T US REPOR T REPORT AS OF 11/30/82 P L A N T CH A RA CT ER I S T I C S:
KEY P ERS0NN E L:
DOCKET NO:
05000362 LIC. PM:
H.
ROOD ASLS CHAIR J. KELLEY APPLICANT:
SCUTHERN CALIF 0PHIA EDISCH LIC. BC:
G.
KNIGHTON MEMBER f C.
HAND LOCATION:
, MI 5 0F SAM CLEMENTE. CA LIC. LA.
J.
LEE MEMBER 2:
E.
JOHMSDN RECION:
5 AE2 BECH COUNSEL:
L.
CHANDLER CONST. INSP:
D.
KIRSCH REAC. TYPE' PWR NSSS: COMB ANTITRUST:
J.
GOLDBERG RESID. INSP A.
CHAFFEE DESIGN PWR 34to MWT/1100 MWE CONST: BECH RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER on oeological and seismological matters was issued on 12/31/83.
ACRS subco-mittee meetings were held 01/30/81 and ER DOCKETED:
03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:
05/20/77 05/20/77C 13/12/81 SER (Non-TMI matters), was issued on 02/06/81.
INPUT TO DES TO PM:
10/01/77 12/01/80C SER supple-ent on TMI issues nas issued on 02/25/81 SER ISSUE DES:
01/27/78 01/20/81C cupple-ent No.
2, 3,
4, 5,
and 6 addressing open items were RESPONSE TO COMMENTS ON DES:
istund 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.
ISSUE FES:
04/00/81 04/29/81C ASl3 PID was rendered on 01/11/82.
Supplement No. 7 is scheduled for 12/15/82.
CURRENT ENV. STATUS:
DLS adJressing class 9 accidents was issued 01-20-81, FES was issued 04-29-81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/29/76C SAR DOCKETED:
03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:
08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C CURRENT HRG. ST,'US:
INPUT TO DRAFT SER TO PM:
02/10/78 0 8 /11/ 78 C ry disposition were granted by ASLB.
ISSUE DRAFT SER:
01/15/81 01/15/81C Motions for s Nearing startto 06/22/81 and ended 09/31/31.
INPUT TO SER:
06/23/78 01/15/81C ISSUE SER:
08/01/80 02/06/81C ACRS LETTER RECEIVED:
03/17/81 03/17/81C l
INPUTS TO SE SUPPLEMENT 7:
12/00/82 ISSUE SE SUPPLEMENT 7:
12/15/82 F Ell A LETTER RECEIVED:
12/01/81 12/ 01/ 81 C CURRENT ANTITRUST:
The Staff is reviewing the OL antitrust information.
HEARING STARTED:
06/22/81 06/22/81C ASLB INITIAL DECISIDH:
05/14/82 05/14/82C ASLB FINAL DECISION:
02/01/83 TECH SPECS COMPLETED:
11/15/82 11/15/82C COMMISSION DECISION:
02/00/83 ISSUE LIC. WITH POWER RESTRICTION:
11/15/82 11/15/82C LATLST AMENCMENT:
ISSUE FULL PCUER LICENSE AMEND:
03/01/83 SCHED. DATE RECEIPT DATE i NE'W SLIPS / NOTES:
l CONSTRUCTION COMPLETI0H - APPL.
11/15/82C 09/27/82 l
1 I
NRR L ICENS ING SYSTEM PAGE NO: 2-22 SEABRC0K 1 3 2 0L CURR ENT STATUS REP 0RT REPORT AS OF 11/30/82 P LA N T CHA RA CT ERIS T I C S:
KEY P E R S 0 N N E L:
DOLVET NO:
044310444 LIC. PM:
L. WHEELER ASLB CHAIR:
H.
H0YT APFLICANT:
PUBLIC SERVICE OF HEW HAMPSHIRE LIC. BC:
G. KNIGHTON MEMBER 1:
E. LUEBKE LOCATION:
10 MI S OF PORT 5 MOUTH, NH LIC. LA.
J.
LEE MEMBER 2 J. HARBOUR REGION:
1 AE:
UEC COUNSEL:
R.
LESSY CONST. INSP:
A.
TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP:
A.
CERNE DESIGN PWR: 3411 MWT/1195 MWE COMST: UEC RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981 The F3t.R was docketed October 5, 1981.
Applicant has ER DOCKETED:
10/05/81 10/05/81C responded to round 1 Q's.
SER issuance has moved from ER SITE VISIT COMPLETE:
12/02/81 12/02/81C 11/08/87 to 01/12/83.
Partial draft SER has been issued.
INPUT TO DES TO PM:
03/01/82 03/01/82C ISSUE DES:
- - 14/82 05/14/82C RESPONSE TO COMMENTS ON DES
08/18/82 09/15/82C ISSUE FES:
12/08/82 CURRENT ENV. STATUS:
ER uas tendered June 1981 ER acceptance review was completed September 1951 The ER was docketed SAFETY / HEARING MILESTONES:
October 5.
1981 DES was issued May, 1982.
Comments are being evaluated.
FES publication has been moved from APPLICATION TENDERED:
06/29/81 06/29/81C 10/05/82 to 12/08/82.
SAR DOCKETED:
10/05/81 10/OS/81C SAR Q'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/07/82 10/08/82C Notico for Opportunity for Hearing was published in ISSUE DRAFT SER:
07/30/82 08/13/82C the Federal Register on October 19, 1981 First prehearing INPUT TO SER:
11/30/82 conference was held May 6-7, 1982.
Second prehearing ISSUE SER:
01/12/83 conference was held July 15-16, 1982.
ASLB Order idantifying parties, cententions and prehearing schedule ACRS FULL COMMITTEE MEETING:
02/10/83 was issued September 13, 1982.
Discovery is in progress.
INPUTS TO SE SUPPLEMENT 12 02/10/83 ISSUE SE SUPPLEMENT 18 03/07/83 FEMA LETTER RECEIVED:
12/20/82 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
08/00/83 ASLB INITIAL DECISION:
06/00/84 ASLB FINAL DECISION:
07/00/84 TECH SPECS COMPLETED:
COMMISSION DECISION:
07/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
05/31/84 06/23/82
NRR LICENSING
$YSTEM PAGE NO: 2-23 SHOREHAM 0L CURRENT STATUS REPORT REPORT AS OF 11/30/82 PLANT CHARACTERI5 TIC 58 KEY P E R S 0 N N E L:
DOCKET NO:
05000322 LIC. PM:
R. GILBERT ASLB CHAIR L. BRENNER APPLICANT' LONG ISLAND LIGHTING CD.
LIC. BC:
A. SCHWENCER MEMBER 1:
P. MORRIS LOCATION:
BROOKHAVEN, NY (LI)
LIC. LA.:
E. HYtTON MEMBER 28 J. CARPENTER REGION:
1 AE:
$3!I COUNSEL:
B. BORDENICK CONST. INSP: L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:
J. RUI. ERG RESID. INSP: J. HIGGINS DESIGN PWR: 2436 MWT/0820 MWE CONST: $8W RM ANALYST L.
LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.
SER Supplement 2 was issued in March 1982.
An additional ER DOCKETED:
01/26/76 01/26/76C SER Supplement is scheduled for Dec. 1982 to address ER SITE VISIT COMPLETE:
08/06/76 08/03/76C resolution of additional outstanding matters.
INPUT TO DES TO PM:
11/22/76 11/29/76C ISSUE DES:
03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:
07/22/77 07/22/77C ISSUE FES:
10/21/77 10/18/77C CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/00/75 09/04/75C SAR DOCKETED:
12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/15/77 08/01/77C After a brief recess, hearings resumed in Bethesda on ISSUE DRAFT SER:
October 12, 1982.
They will remain in Bethesda until INPUT TO SER:
03/10/81 03/10/81C i
the end of the year.
ISSUE SER:
04/10/81 04/10/81C ACRS LETTER RECEIVED:
09/18/81 10/19/81C 1
INPUTS TO SE SUPPLEMENT 3 N/S l
ISSUE SE SUPPLEMENT 38 12/15/82 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Not required.
HEARING STARTED:
05/04/82 05/04/82C ASLB INITIAL DECISION:
05/00/83 ASLP FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
06/00/83 ISSUE LIC. WITH POWER RESTRICTION: 03/30/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/00/83 FSAR Amendment 27 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETION - APPL.:
03/00/83 04/30/82 on all matters except offsite emergency planning is the end of April, 1983.
A complete initial decision may not be available orlor to Mav. 1983.
l
-__~
NRR L ICEN $ING SYST EM PAGE ND: 2-24 SOUTH TEXAS 1 8 2 0L CURRENT STA TUS REPQRT REPORT AS OF: 11/30/82 PLANT CHA R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
049880499 LIC. PM:
H.
SCHIERLING ASLB CHAIR:
C.
BECHHOEFER APPLICANT:
HOUSTON LIGHTING 3 POWER COMPANY LIC. BC:
G.
KNIGHTON MEMBER 1:
J.
LAMB LOCATION:
12 MI SSW OF BAY CITY, TEX LIC. LA.
J.
LEE MEMBER 2:
E. HILL REGION:
4 AE:
BECH COUNSEL:
J.
GUTIERREZ CONST. INSP:
l RLAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: W. HILL I
DESIGN PWR: 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Limited work being performed due to higher priorities.
BRRT has been replaced by Bechtel as the A/E.
BRRT ER DOCKETED:
07/17/78C has been replaced by Ebasco as the constructor.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C Non safety related construction restarted on June 15, 1932.
INPUT TO DES TO PM:
08/00/85 j
Safety related construction restarted on August 15, 1982.
ISSUE DES:
09/00/85 i
Current FLD is 12/86.
Milestones now reflect a 12/86 FLD.
RESPONSE TO COMMENTS ON DES:
01/00/86 l
ISSUE FES:
02/00/86 1
l CURRENT ENV. STATUS:
Schedule revised to reflect new 12/86 FLD.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C SAR Q'S RECEIVED BY PM:
01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/00/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:
03/00/85 expedited hearing on QA programs and management was INPUT TO SER:
11/00/85 held.
The record of this phase of the hearing ISSUE SER:
I?/00/85 was closed on June 17, 1982, Phase II of hearing will consider all aspects of Quadrex Report.
ACRS FULL COMMITTEE MEETING:
01/00/86 Phase II is expected to begin in late '82 or early '83.
INPUTS TO SE SUPPLEMENT 1:
01/00/86 ISSUE SE SUPPLEMENT 12 01/00/86 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:
06/00/86 proposed license conditions and dismissing proceeding.
ASLB INITIAL DECISION:
11/00/86 ASLB FINAL DECISI0H:
12/00/86 TECH SPECS COMPLETED:
01/00/86 COMMISSION DECISION:
12/00/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/86 FSAR amendment 825 was issued 03/15/82.
ER amendment 85 was issued 08/31/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
All schedules now reflect new official FLD of 12/86.
CONSTRUCTION COMPLETION - APPL.:
12/00/86 03/00/82
NRR LYCENSING SV$ TEM PAGE NO: 2-25 ST LUCIE 2 0L CURREN T STATUS REP 0RT REPORT AS OF: 11/30/82 PLANT CHA R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET No:
05000339 LIC. PM:
V. NERSES ASLB CHAIR E. BOWERS APPLICANT:
FLORIDA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
P. MORRIS LOCATION:
12 MI SE OF FT. PIERCE, FLA LIC. LA.:
J.
LEE MEMBER 2:
D. PARIS REGIDH:
2 AE:
EBASCO COUNSEL:
W.
PATTON CONST. INSP: R. WRIGHT RFAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP: S. ELROD DESIGN PWR: 2700 MWT/0842 MWE CONST: EBASCO RM ANALYST:
S. NEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Status of Q-1 and Q-2 review is complete.
The SER was issued on 10/09/81.
SE Supplement No. I was issued ER DOCKETED:
02/17/81C on 12/30/81 SE Supplement No. 2 was issued on 09/30/82.
ER SITE VISIT COMPLETE:
02/18/81 02/18/81C INPUT TO DES TO PM 08/07/81 08/07/81C ISSUE DES:
10/16/81 10/16/81C RESPONSE TO COMMENTS ON DES:
02/08/82 02/08/82C t
ISSUE FES:
04/23/82 04/23/82C CURRENT ENV. STATUS:
The DES was issued on 10/16/81 and the FR Hotice was published 10/30/81. The FES was issued cn 04/23/82.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 0 3/ 31/80 C SAR DOCKETED:
02/17/81C SAR Q'S RECEIVED BY PM:
06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:
INPUT TO DRAFT SER TO PM:
08/03/81 08/03/81C CURRENT PRG. STATUS:
There have been no petitioners on matters dealing with ISSUE DRAFT SER:
08/10/81 08/10/81C INPUT TO SER:
09/11/81 09/11/81C health, safety and environment.
ISSUE SER:
10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING:
11/12/81 11/12/81C INPUTS TO SE SUPPLEMENT 3:
11/30/82 ISSUE SE SUPPLEMENT 3:
12/10/82 FEMA LETTER RECEIVED:
08/20/82 08/20/82C CURRENT ANTITRUST:
Set t lemen t a.mong the Department o f Justi ce, the NRC Staff HEARING STARTED:
N/A and the licensen has been agreed upon.
Case dismissed ASLB INITIAL DECISION:
N/A 3/82 following summary disposition and settlement agreement.
ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
11/30/82 COMf11SSION DECISION:
01/00/83 ISSUE LIC. WIT 11 POWER RESTRICTION: N/A ISSUE FULL POWER LICENSE AMEND:
12/17/82 LATEST AMENDMENT:
No.
12 (TSAR); No. 5 (ER)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Caseload Forecast Panel estimates 08/83 core Ioad date.
CONSTRUCTION COMPLETION - APPL.:
01/00/83 Applicant, in mceting with NRC on 09/30/82, estimates 01/83 core load date.
I
NRR LICEN SING SYSTEM PAGE NO: 2-26 SUMMER 1 L IC CURRENT STATUS REPQRT REPORT AS OF: 11/30/82 PL A N T CHA RA CTER IST I C 5:
K EY P E R S 0 N N E L:
C0CKET NO:
05000395 LIC. PM:
W.
KANE ASLB CHAIR:
H. GROSSMAN APPLICANT:
SCUTH CAROLINA ELECTRIC & GAS CO.
LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G.
LINENBERGER LOCATION:
26 MI NW OF CO UMBIA, SC LIC. LA.r M.
RUSHBROOK MEMBER 2:
F. HOOPER REGION:
2 AE:
GIL C9' INS EL :
REAC. TYPE: PWR NSSS: WEST AhsITRUST:
B.
V0GLER RESID. INSP: J. SK0LDS DESIGN PWR: 2735 MMT/0900 MWE CONST: DANIEL RM ANALYST:
S.
HEDLUND ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER Supplerent No. I was is!ued 04/25/81.
Supplement 01/21/77 02/24/77C No. 2 to the SER was issued on 05/28/81.
Suppicment No.
ER DOCKETED:
3 was issued in January 1982.
Supplement No. 4 was ER SITE VISIT COMPLETE:
06/30/78 06/07/78C issued on August 6.
1952.
SSER S was issued 11/12/82.
INPUT TO DES TO PM:
09/21/78 05/29/79C An operating license with a S P. power restriction was ISSUE DES:
10/30/78 06/22/79C issued on August 6, 1982.
Four amendments have been RESPONSE TO COMMENTS ON DES:
07/01/80 07/24/80C issued, each involving changes to the Technical ISSUE FES:
05/15/81 05/21/81C Specifications.
CURRENT ENV. STATUS:
DES supple-ent on Class 9 accidents was issued in November 1980.
The FES was issued in May, 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/10/76 12/10/76C SAR DOCKETED:
01/21/77 02/24/77C SAR Q'S RECEIVED BY PM:
02/03/78 03/08/78C S AR APPL. RESPONSE TC Q'S RECEIVED: 04/21/78 09/18/78C INPUT TO DRAFT SER TO PM:
06/16/78 02/21/79C l
CURRENT HRG. STATUS:
The contested hearing began 06/81 and was completed in ISSUE DRAFT SER:
N/A 01/82. PID on soismic issues was issued on 07/20/82. The INPUT TO SER:
06/02/80 12/15/80C remainder of the decision was i ssued on 08/04/52. The ISSUE SER:
08/01/80 02/06/81C intervenor requested the ASLB to stay its decision and recpen the hearings because of cadweld allegations. The ACRS LETTER RECEIVED:
03/18/81 03/18/81C ASLB denied both requests after reviewing affidavits from INPUTS TO SE SUPPLEMENT 5:
ISSUE SE SUPPLEMENT 5:
11/12/82 11/12/82C the staf f and licensee.
FEMA LETTER RECEIVED:
11/13/81 11/13/81C CURRENT ANTITRUST:
The Attorney General sent his advice on significant HEARING STARTED:
06/22/81 06/22/81C chances to the Ccmmission on 10/10/80. The Commission ASLB INITIAL DECISION:
07/00/82 08/04/82C on 06/26/31 denied Central Electric Power Coop., Inc.
ASLB FINAL DECISION:
11/01/82 11/31/82C TECH SPECS COMPLETED:
07/00/82 08/06/82C petition for antitrust review.
COMMISSION DECISION:
11/12/82 11/12/820 ISSUE LIC. WITH POWER RESTRICTION: 07/00/82 08/06/82C ISSUE FULL POWER LICENSE AMEND:
11/12/82 11/12/82C LATEST AMENDMENT:
Humber 33.
SCHED. DATE RECEIPT DATE NEW SLIPS /NDTES:
CONSTRUCTION COMPLETION - APPL.:
08/10/82C l
g
l i
l NRR LICENSING SY3 TEM PAGE NO: 3-27 SUSQUEHANNA 182 LIC CURRENT STATUS REPORT REPORT AS OF: 11/30/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
038780388 LIC. PM:
R. PERCH ASLB CHAIR:
J. GLEASON~
I APPLICANT:
PENNSYLVANIA POWER 8 LIGHT LIC. BO A. SCHWENCER MEMBER 1:
G. BRIGHT LOCATION:
7 MI NE OF BERWICK, PA LIC. LA.:
E. HYLTON MEMBER 2:
P. PURDOM REGION:
1 AE:
BECH COUNSEL:
J. CUTCHIN CONST. INSP L. MARROW REAC. TYPE: BWR NSSS: GE ANTITRUST A. HODGDON RESID. INSP G. RHOADS DESIGN PWR 3440 MWT/1052 MWE CONST: BECH RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
SER was issued 04/06/81.
SSER 91 was issued 07/07/81.
Post ACRS SSER 82 was issued 09/10/81 SSER 83 was ER DOCKETED:
06/10/78C issued 07/17/82.
Full power license with a fuel load ER SITE VISIT COMPLETE:
10/20/78 10/20/78C-and low power testing restriction was issued on 07/17/82.
INPUT TO DES TO PM:
03/30/81 03/30/81C Full power amendment was issued on 11/12/82.
ISSUE DES:
03/30/81-03/30/81C RESPONSE TO COMMENTS ON DES:
05/21/81 05/21/81C ISSUE FES:
06/15/81-07/02/81C i
CURRENT ENV. STATUS:
DES was issued on 03-30-88.
FES was issued 07-02-81.
1 SAFETY / HEARING MILESTONES:
I
?
APPLICATION TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:
11/17/78 05/15/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S i
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:
04-12-82.
INPUT TO SER:
03/23/81 03/23/81C ISSUE SER:
04/06/81 04/06/81C ACRS LETTER RECEIVED:
08/15/81C INPUTS TO SE SUPPLEMENT 38 07/16/82 07/16/82C ISSUE SE SUPPLEMENT 38 07/00/82 07/17/82C i
l FEMA LETTER RECEIVED:
06/00/82 06/00/82C CURRENT ANTITRUST:
Complete.
HEARING STARTED:
10/06/81 10/06/81C ASLB INITIAL DECISION:
04/12/82 04/12/82C ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
09/00/82 11/12/82C 1
1 ISSUE LIC. WITH POWER RESTRICTION: 07/01/82 07/17/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
09/00/82 11/12/82C FSAR:
No. 30; ER:
No. 5 SCHED. DATE RECEIPT DATE ;
CONSTRUCTION COMPLETION - APPL.:
07/17/82C 05/11/82 i
i
NRR L I'C E N $ I N G SYSTEM PAGE NO: 2-28 WASHINGTON NUCLEAR 1 0L CURRENT STATUS REP 0RT REPORT AS OF 11/30/82 PLANT CHARACTERISTICS:
KEY PERS0NNELa DOCKET NO 05000460 LIC. PM:
M.
THADANI ASLB CHAIR H. CROSSMAN APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC E. ADENSAM MEMBER 1:
G.
BRIGHT LOCATION:
10 MI N OF RICHLAND, WA LIC. LA.:
M. DUNCAN MEMBER 28 J. HARBOUR REGION:
5 AE UEC COUNSEL:
M. YOUNG CONST. INSP J. OLIN REAC. TYPE: PWR HSSS: B8W ANTITRUST:
RESID. INSP: A.
TOTH DESIGN PWR*
3760 MWT/1266 MWE CONST BECH RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81.
This schedule is being reconsidered in light of a notice of deferral from ER DOCKETED:
07/00/82 07/16/82C the applicant. A review schedule will be established ER SITE VISIT COMPLETE:
following construction resumption. Application was INPUT TO DES TO PM:
docketed on July 16, 1982.
ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES:
ISSUE FES:
N/S i
CURRENT ENV. STATUS:
DES issuance will be scheduled following resumption of construction.
SAFETY, HEARING MILESTONES:
APPLICATION TENDERED:
11/25/81 ff/25/81C SAR DOCKETED:
07/00/82 07/16/82C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO FM:
Notice of Opportunity for Hearing was published ISSUE DRAFT SER:
in the Federal Register on August 16, 1982.
INPUT TO SER:
A petiticn to intervene has been received from ISSUE SER:
N/S the Coalition for Safe Power.
Planning for a prehearing conference is in progress.
ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 18 N/S g
FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
N/S ASLB INITIAL DECISIGHz N/S ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISIDH:
ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S Amendment 1,
dated October 18, 1982 received in document Control System Nov.
1, 1982.
SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.:
N/S 04/29/82 on 4/29/82.
I
NRR LICEN5ING SYSTEM PAGE NO: 2-29 WASHINGTON HUCLEAR 2 0L CURRENT STATUS REPQRT REPORT AS OF 11/30/82 PLANT CHARA CTERI$ TICS:
KEY PERS0NNEL DOCKET NO:
05000397 LIC. PM:
R. AULUCK ASLB CHAIR:
E. BOWERS APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
A.
SCHWENCER MEMBER 1 R. COLE LOCATION:
30 MI NW OF RICHLAND, WASH LIC.
LA..
E. HYLTON MEMBER 2:
E. HILL REGION:
5 AE:
B4R CDUNSEL:
W. PATON CONST. INSP A.
TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP R. FEIL DESIGN PWR: 3323 MWT/1103 MWE CONST: BECH RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE' j
SER was i ssued 3/31/82.
Geology / Seismology reviews were i
included in SSER Ho. 1 issued August 11, 1982.
ACRS ER DOCKETED:
02/28/77 04/20/77C
{
meeting was neld on October 7, 1982.
ER SITE VISIT COMPLETE:
07/13/77 07/14/77C l
INPUT TO DES TO PM:
06/30/81 06/30/81C j
ISSUE DES:
07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:
09/28/81 09/28/81C ISSUE FES:
12/31/81 12/31/81C CURRENT ENV. STATUS:
i FES was issued 12-31-81.
l SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/30/76C SAR DOCKETED:
04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/12/81 10/12/81C Not required ISSUE DRAFT SER:
11/17/81 11/17/81C INPUT TO SER:
05/30/82 05/30/82C ISSUE SER:
03/31/82 03/31/82C l
ACR$ LETTER RECEIVED:
11/13/82 11/13/82C INPUTS TO SE SUPPLEMENT 2 11/22/82 I
ISSUE SE SUPPLEMENT 2:
12/15/82 FEMA LEITER RECEIVED:
05/01/83 CURRENT-ANTITRUST:
Not required HEARING STARTED:
N/A ASLB INITIAL DECISIGHz N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
07/00/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE, FULL POWER LICENSE AMEND:
09/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
09/00/83 05/07/82
NRR LICENSING SYSTEM PAGE NO: 2-30 WASHINGTON NUCLEAR 3 0L CURRENT STATUS REPORT REPORT AS OF: 11/30/82 PLANT CHARACTERI$TICSt KEY P E R S 0 N N E La DOCKET NO:
05000508 LIC. PM:
A. VIETTI ASLB CHAIR:
R. LAZO APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
G. KNIGHTON MEMBER 1 E. LUEBKE LOCATION:
26 MI W OF OLYMPIA, WA LIC. LA.:
J. LEE MEMBER 2:
D. SCHINK REGION:
5 AE2 EBASCO COUNSEL:
D. SWANSON CONST. INSP D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP: W. ALBERT DESIGN PWR: 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and was docketed on 08/27/82.
ER DOCKETED:
08/27/82 08/27/82C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
07/08/83 ISSUE DES:
09/07/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
04/06/84 CURRENT ENV. STATUS:
Application was tendered on June 2, 1982, and was docketed on 08/27/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/02/82 06/02/82C SAR DOCKETED:
08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:
04/05/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/13/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/28/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/83 Federal Register on 09/15/82.
INPUT TO SER:
06/05/84 ISSUE SER:
08/09/84 ACRS FULL COMMITTEE MEETING:
09/00/84 INPUTS TO SE SUPPLEMENT 13 11/06/84 ISSUE SE SUPPLEMENT 1:
12/13/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Notice of Opportunity for hearing was published in the HEARING STARTED:
05/00/85 Federal register on October 15, 1982.
ASLB INITIAL DECISION:
11/00/85 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISI0H:
12/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Detailed review schedule has been approved.
CONSTRUCTION COMPLETION - APPL.:
12/00/85 10/01/82 i
MRR LICENSING SYSTEM PAGE NO: 2-31 WATERFORD 3 0L CURRENT STATUS REPORT REFORT AS OF: 11/30/82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL DOCKET NO:
05000382 LIC. PM:
J. WILSON ASLB CHAIR:
S. WOLFE APPLICANT:
LOUISIANA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
W. JORDAN LOCATION:
20 MI W OF NEW ORLEANS, LA LIC. LA.:
J. LEE MEMBER 2:
H.
FOREMAN REGION:
4 AE:
EBASCO COUNSEL:
S. TURK CONST. INSP
. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE I
The safety review was expedited. The SER was issued July 9, 1981.
Fuel load date delayed untlI 05/83 by ER DOCKETED:
12/00/78 12/00/78C appilcant.
ER SITE VISIT COMPLETE:
12/05/80 12/05/80C INPUT TO DES TO PM:
04/06/81 04/06/81C ISSUE DES:
05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:
07/24/81 08/19/81C ISSUE FES:
09/30/81 09/30/81C CURRENT ENV. STATUS:
The DES was completed in May 1981.
FES was completed September 1981.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
09/28/78 09/28/78C SAR DOCKETED:
12/18/78C SAR Q'S RECEIVED BY PM:
N/S j
SAR APPL. RES"0NSE TO Q'S RECEIVED: 08/08/80 12/15/80C j
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/03/80 05/15/81C Contested hearing started 03/82.
Discovery among the ISSUE DRAFT SER:
parties has been held.
Partial initial decision issued INPUT TO SER:
05/08/81 05/15/81C 11/03/82.
ISSUE SER:
07/09/81 07/09/81C ACRS LETTER RECEIVED:
08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 48 09/15/82C ISSUE SE SUPPLEMENT 4:
10/22/82 10/29/82C FEMA LETTER RECEIVED:
11/30/82 CURRENT ANTITRUST:
Staff is reviewing OL Antitrust information.
HEARING STARTED:
03/00/82 03/23/82C ASLB INITIAL DECISIDH:
10/00/82 11/03/82C l
ASLB FINAL DECISION:
03/00/83 i
TECH SPECS COMPLETED:
02/28/83 j
COMMISSION DECISION:
04/30/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/83 ER 83 - 8/81 SCHED. DATE RECEIPT DATE '
FSAR 829 - 10/82.
NEW SLIPS / NOTES:
To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:
05/00/83 08/24/82 l
I i
l
NRR LICENSING SYSTEM PAGE NO: 2-32 WATTS BAR 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 11/30/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
039080391 LIC. PM:
T.
KENYON ASLB CHAIR N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 1:
N/A LOCATION:
10 MI S OF SPRING CITY, TENN LIC. LA.:
M.
DUNCAN MEMBER 2:
N/A REGION:
2 AE:
TVA COUNSEL:
T1. YOUNG CONST. INSP: R. CRLENJAK REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J.
RUTBERG RESID. INSP:
T. NEATHERLY DESIGN PWR 3411 MWT/1165 MWE CONST: TVA RM ANALYST:
M.
KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 cerpletion date at 08/83.
SER published 07/82.
ACRS subcemmittee meetings held ER DOCKETED:
01/0S/77 11/23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:
03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82. Supplement INPUT TO DES TO PM:
07/06/77 08/18/77C 81 to SER published 09/22/82.
ISSUE DES:
11/29/77 06/02/78C RESPONSE TO COMMENTS ON DES:
N/A IS3UE FES:
11/24/78 12/29/78C CURRENT ENV. STATUS:
Complete except for environme,ntal tech specs.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/30/76 06/30/76C SAR DOCKETED:
10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:
12/15/76 05/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED- 03/23/77 02/10/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
06/18/80 12/18/81C Ho hearings are assumed.
ISSUE CRAFT SER:
12/30/81 12/30/81C INPUT TO SER:
06/04/82 06/04/82C I,SSUE SER:
07/01/82 07/01/82C ACRS LETTER RECEIVED:
09/00/82 08/16/82C INPUTS TO SE SUPPLEMENT 1:
08/27/82 09/03/82C ISSUE SE SUPPLEMENT 1:
09/17/82 09/22/82C FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
Complete HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
11/00/82 COMMISSION DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRIC1IDH:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/00/83 FSAR No. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/00/83 04/09/82
NRR LICENSING SYSTEM PAGE NO: 2-33 WOLF CRSEK 1 0L CURRENT STATUS REPORT REPORT AS OF 11/30/82 PLANT C H A R A C T E R I 5 T I C 5:
KEY PERS0NNEL DOCKET NO:
05000482 LIC. PM:
J. HOPF. INS ASLB CHAIR:
J. GLEASON APPLICANT:
KANSAS GAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G. ANDERSON LOCATION:
3.5 MI NE OF BURLINGTON, KAN LIC. LA.:
M. RUSHBROOK MEMBER 2 H. PAXTON REGION:
4 AE BECH COUNSEL:
M. KARMAN CONST. INSP REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP T. VANDEL DESIGN PWR 3425 MWT/1150 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE' The SER was issued in April 1982.
SSER-1 was issued in August 1982.
ER DOCKETED:
11/25/80 11/25/ SOC ER SITE VISIT COMPLETE:
07/28/81 04/21/a1C INPUT TO DES TO PM:
10/01/81 10/01/81C ISSUE DES:
01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES:
06/11/82 06/11/82C CURRENT ENV. STATUS:
The DES was issued in January 1982.
The FES was issued in June 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/21/80 C2/21/80C SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 4'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C Notice of Opportunity for Hearing was oublished in the ISSUE DRAFT SER:
Federal Register on 12/18/80.
Two petitions-for INPUT TO SER:
03/19/82 03/19/82C leave to intervene were filed. A rpecial combined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 9/15/81.
ACRS LETTER RECEIVED:
05/11/82 05/11/82C INPUTS TO SE SUPPLEMENT 1:
08/10/82 08/10/82C ISSUE SE SUPPLEMENT 18 08/26/82 08/26/82C FEMA LETTER RECEIVED:
04/01/83 l
CURRENT ANTI 7 RUST:
OL antitrust review is in progress.
HEARING STARTED:
06/00/83 ASLB INITIAL DECISION:
11/00/83 ASLB FINAL DECISION:
12/00/83 TECH SPECS COMPLETED:
N/S COMMISSION DECISION:
09/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENCMENT:
ISSUE FULL POWER LICENSE AMEND:
10/00/84 SNUPPS FSAR - No. 10; Wolf Creek Site Addendum - No. 9; ER - No.
3.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION CCMPLETION - APPL.:
10/00/84 08/24/82 L
n NRR LICEN5ING SYSTEM PAGE NO: 2-34 ZIMMER 1 0L CUkRENT STA TUS REPQRT REPORT AS OF: 11/30/82 PL ANT CHA R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000358 LIC. PM:
L. KINTNER ASLB CHAIR:
J.
FRYE APPLICANY:
CINCItiNATI GAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
F. HOOPER LOCATION:
24 MI SE OF CINCINHATI, OH LIC.
LA..
M. RUSHBROOK MLMBER 2:
M.
LIVINGSTON REGION:
3 AE:
58L COUNSEL:
C. BARTH CONST. INSP:
D.
1:UN T ER REAC. TYPE; BWR NSSS: CE ANTITRUSe:
S.
LEWIS RESID. INSP: F. CHRISTIANSON DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER RM ANALYST:
- 2. ST MARY ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SE Supplament was issued on 06/04/81.
SE Supplement s2 was issued 10/81 SE Supplement #3 was issued on 08/23/82.
ER DOCKETED:
09/10/75 09/10/75C ER SITE VISIT COMPLETE:
10/09/75 10/09/75C INPUT TO DES TO PM:
08/20/76 08/19/76C ISSUE DES:
10/15/76 10/15/76C RESPONSE TO COMMENTS ON DES:
03/25/77 54/01/77C ISSUE FES:
06/10/77 06/10/77C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/i C SAR Q'S RECEIVED BY PM:
10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C INPUT TO CRAFT SER TO PM:
01/28/77 08/11/77C CURRENT HRG. STATUS:
Hear-ing was completed March 5, 1982.
Boa H aecision was ISSUE DRAFT SER:
N/A rendered in June, 1982.
The Board exerr' its sua INPUT TO SER:
05/20/77 12/07/77C sponte authority to admit as Board issit ght new ISSUE SER:
07/29/77 01/31/ 7 9C contentions. Tha Commission reviewed t'-
. tion and directed the Board to issue an appropria, order ACRS LETTER RECEIVED:
09/16/77 O!/13/79C dismissing the eight contentions from the proceeding.
INPUTS TO SE SUPPLEMENT 3:
06/17/82 08/02/82C ISSUE SE SUPPLEMENT 33 08/23/82 08/23/82C CURRENT ANTITRUST:
Antitrust review is now closed.
Federal Register Notice HEARING STARTED:
02/26/82 02/26/82C ASLB INITIAL DECISIOM:
06/21/82 06/21/82C was published 04/09/82.
ASLB FINAL DECISICH:
11/20/82 TECH SPECS COMPLETED:
05/00/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
09/00/83 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Applicant by letter of 09/24/82 has revised the construction CONSTRUCTION COMPLETION - APPL.
09/00/83 09/24/82 completion target date to the third quarter of 1983.
l
NRR LICEN$ING SYSTEM PAGE CO: 2-35 CLINCH RIVER CP CURRENT STATUS REPORT REPORT AS OF 11/30/82 i
PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET ND:
05000537 LIC. PM:
. STARK LEECH ASLB CHAIR:
M. MILLER APPLICANT PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:
P. CHECK men 8ER 1 G. LINENBERGER LOCATION:
25 MI W OF KNOXVILLE, TN LIC. LA.:
P. SHUTTLEWORTH MEMBER 2:
C. HAND REGION:
2 AE BIR COUNSEL:
S. TREBY CONST. INSP REAC. TYPE: LMFBR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP DESIGN PWR: 0975 MWT/0350 MWE CONST: Saw RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981 A revision to the Site Sultability Report was issued June 11, 1982.
ER DOCKETED:
04/11/75 04/11/75C On August 17, 1982. NRC issued an order granting Clinch ER SITE VISIT COMPLETE:
River's request to begin site preparation activities.
INPUT TO DES TO PM:
The Site Suitability R6 port hearing sessions were held ISSUE DES:
02/12/76C in Oak Ridge during the week of August 23, 1982.
RESPONSE TO COMMENTS ON DES:
ISSUE T ES:
02/07/77 02/07/77C CURRENT ENV. STATUS:
The FES was issued in February 1977.
A draft supplement to the FES was issued on July 19, 1982.
A final supplement SAFETY / HEARING MILESTONES:
was i ssued on October 29, 1982.
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:
04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
57/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27, ISSUE DRAFT SER:
09/27/82 09/27/82C 1982.
The FES hearings were held November 15-19, 1982.
A INPUT TO SER:
-01/14/83 second week of hearings is scheduled for the week of ISSUE SER:
03/04/83 December 13, 1982.
ACRS FULL COMMITTEE MEETING:
05/06/83 INPUTS TO SE SUPPLEMENT 18 06/10/83 ISSUE SE SUPPLEMENT 1 07/01/83 CURRENT ANTITRUST:
HEARING STARTED:
08/23/82 08/23/82C ASLB INITIAL DECISION 04/01/84
[
ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
06/81/84 CP ISSUED:
06/On/84 LATEST AMENDMENT:
NEW SLIPS / NOTES:
_.i 1
NRR L ICEN5 ING SYSTEM PAGE NO: 2-36 PEBBLE SPRINGS 1 3 2 CP CURRENT STA TUS REPQRT REPORT AS OF: 11/30/82 PL 4N T CHARACTER IST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
051430515 LIC. PM:
D.
SCALETTI ASLB CHAIR:
I. SMITH APPLICANT:
PORTLAND GENERAL ELECTRIC LIC. BC:
E. ADENSAM MEMBER 1:
O. PARIS LOCATION:
3 MI NW OF ARLINGTON, CRE LIC.
LA.*
M.
DUNCAN MEMBER 2:
W. JORDAN REGION:
5 AE:
BECH COUNSEL:
B.
BORDENICK CONST. INSP:
REAC. TYPE: PWR hSSS: B4W ANTITRUST:
B. V0GLER RESID. INSP:
DESIGN PWR: 3760 MWT/1260 MWE CONST: BECH RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Amendment 13 to the PSAR in response to 10CFR50.34(f)
(CP/ML rule) was filed 1/29/82.
The staff's review of ER DOCKETED:
08/06/74 08/06/74C the TMI-2 i ssues i s presently in a hold status awaiting ER SITE VISIT COMPLETE:
a decision by PGE whether or not to continue their INPUT TO DES TO PM:
10/11/74 12/11/74C application at a different site (see Environmental Status).
ISSUE DES:
11/15/74 01/06/75C PCE has indicated a desire to cancel.
RESPONSE TO COMMENTS ON DES:
03/07/75 03/22/75C ISSUE FES:
04/07/75 0 4/16 / 75C CURRENT ENV. STATUS:
On 4/9/82, PGE withdrew their application, before the Oregon Energy facility siting council, for the Pebble SAFETY / HEARING MILESTONES:
Springs site.
The alternative sites hearing before the ASLB scheduled for 4/20.'82 was cancelled.
APPLICATION TENDERED:
06/07/74 06/07/74C SAR DOCKETED:
10/18/74 10/18/74C SAR Q'S RECEIVED BY PM:
12/13/74 01/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/11/75 05/23/75C A prehearing conference on alternative sites was held ISSUE DRAFT SER:
on December 1,
1981 INPUT TO SER:
09/01/75 12/08/75C ISSUE SER:
01/05/76 01/12/76C ACRS LETTER RECEIVED:
11/12/76 02/12/76C INPUTS TO SE SUPPLEMENT 68 09/09/76 12/14/77C ISSUE SE SUPPLEMENT 6:
N/S CURRENT ANTITRUST:
Antitrust review is complete.
HEARING STARTED:
ASLB INITIAL DECISION:
N/S ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISIDH:
N/S CP ISSUED:
N/S LATEST AMENDMENT:
Amendment 13 to the PSAR in response to 10CFR50.34(f).
NEW SLIPS / NOTES:
NRR LICEN5ING SYSTEM PAGE NO: 2-37 SKAGIT/NANFORD 132 CP CURRENT STATUS REP 0RT REPORT AS OF: 11/30/82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL DOCKET NO:
052280523 LIC. PM:
C. MOON ASLB CHAIR:
J. WOLF APPLICANT:
PUGET SOUND POWER 8 LIGHT LIC. BC:
E. ADENSAM MEMBER 1 F. N00PER LOCATION:
30 MI. NW OF RICHLAND, WA.
LIC. LA.:
M.
DUNCAN MEMBER 2 G. LINENBERGER REGION:
5 AE:
BECH COUNSEL:
R. 3 LACK CONST. INSP:
REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP DESIGN PWR: 3833 MWT/1277 MWE CCNST: BECH RM ANALYST:
- 5. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI-related action items.
Site relocation ER amendment and PSAR ER DOCKETED:
09/30/74 09/30/74C i
amendment were submitted on 12/31/81.
The applicant is ER SITE VISIT COMPLETE:
02/05/82 02/05/82C relocating the site to the Hanford Reservation.
INPUT TO DES TO PM:
04/09/82 04/09/82C On 7/16/82, the staff requested additional geological ISSUE DES:
05/04/82 05/04/82C field data.
Submittal and review of this data will RESPONSE TO COMMENTS ON DES:
08/06/82 09/30/82C require a delay in issuance of supplement No. 3 to ISSUE FES:
12/00/82 SER to 11/82.
CURRENT ENV. STATUS:
Site relocation (to Nanford) DES was issued on May 4, 1982.
The FES was expected to be issued 12/82.
SAFETY / NEARING MILESTONES:
A delay to 02/83 is now expected in order that FES issuance follow issuance of the draft report on need APPLICATION TENDERED:
08/06/74 08/06/74C for pcwer by the Regional Power Council in 01/83.
SAR DOCKETED:
01/15/75 01/15 /75C SAR Q'S RECEIVED BY PM:
02/10/82 02/10/82C SAR APPL. RESPONSE TO q'S RECEIVED: 10/01/82 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
A special prehearing conference was held on May 5, 1982.
ISSUE DRAFT SER:
Safety hearings are expected to begin in 02/83.
INPUT TO SER:
07/11/77 07/11/77C Environmental hearings, except for need-for power, are ISSUE SER:
08/31/77 08/31/770 expected to begin in 04/83.
Need-for power hearing is expected to begin in 05/83 after the Regional Power ACRS FULL COMMITTEE MEETING:
01/00/83 Council publishes a regional conservation and electric INPUTS TO SE SUPPLEMENT 3:
11/30/32 11/30/82C power plan in 04/83.
ISSUE SE SUPPLEMENT 3 11/30/82 CURRENT' ANTITRUST:
Complete NEARING STARTED:
07/15/75 07/15/75C l
ASLB INITIAL DECISION:
04/00/83 ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
N/A COMMISSION DECISION 07/00/83 CP ISSUED:
07/00/83 LATEST AMENDMENT:
NEW SLIPS /NCTES:
1
NRR L ICENSING SYSTEM PAGE NO: 2-30 (BOP)BOPSSAR/BSAR-20S PDA CURRENT STA TUS REP 0RT REPORT AS OF: 11/30/82 PL AN T CHARA CT ERIST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000560 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
FLUOR POWER SERVICES LIC. BC:
C. THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
1 AE:
FLUOR COUNSEL:
N/A CONST. INSP REAC. TYPE: BCP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
RM.%NALYST:
S. HEDLUND ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Review in abeyance pending the future of standardization.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
10/31/77 10/31/77C SAR DOCKETED:
10/31/77 10/31/77C SAR Q'S RECEIVED BY PM:
04/14/78 06/20/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/02/78 07/31/ 78 C INPUT TO DRAFT SER TO PM:
0S/25/78 07/07/78C CURRENT NRG. STATUS:
ISSUE DRAFT SER:
INPUT TO SER:
08/21/78 10/17/78C ISSUE SER:
10/02/78 12/29/78C ACRS LETTER RECEIVED:
11/17/78 02/16/79C INPUTS TO SE SUPPLEMENT 1:
12/08/78 03/21/79C ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:
NEARING STARTED:
f ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
l l
NRR LICEN$ING SYSTEM PAGE NO: 2-39 (90P)ESSAR/BSAR-205 PDA CURRENT STATUS REPORT REPORT AS OF 11/30/82 PLANT C H A R A C T E R I S T I C 5:
KET P E R S 0 N N E L:
DOCKET NO:
00002591 LIC. PM:
UNASSIGNED ASLB CHAIR:
APPLICANT:
EBASCO SERVICES LIC. BC:
C.
THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE2 EBASCO COUNSEL:
UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/73C SAR Q'S RECEIVED BY PM:
N/S SAR AP?L. RESFONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 12 N/S ISSUE SE SUPPLEMENT 1:
MeS C'JRRENT ANTITRUST:
l HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISIGH:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
a NRR L ICEN5ING SYSTEM PAGE NO: 2-40 (50P)ESSAR/CESSAR-80 PDA CURRENT STATUS REPORT REPORT AS OF: 11/30/82 i
PLAN T CHARACTERIST I C 5:
KEY PERS0NN E L:
APPLICANT:
EBASCO SERVICES LIC. BC:
C..
UNASSIGNED ASLB CHAIR:
DOCKET NO:
05000591 LIC. PM:
THOMAS MEMBER 1:
LOCATION:
N/A LIC.
LA.'
P. ANDERSON MEMBER 2:
REGION:
0 AE:
EBASCO COUNSEL:
. UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 3800 MWT/0000 MWE CONST:
RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO C0FMENTS ON DES:
ISSUE FES:
i CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
t SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
Q <-
- o _; /..*
y /c ;v /;; - ;. ;._ ; v..;c-r. v _. 3 '. ; -.
_., :k ' '. : : ; ^
.c
-.. ;,_ ;.; _. c ;.
A. '.
-l
~;
..., n
,r
,g, y
'+>y.
'..5.
- ~'
- \\, j =.. :l.
_N-
, : j..
s ', ?
.,ea
+. ' '-
e <....
e 4
'e
- 'g n.
. An '
'4
^-.
g' A.
Ny j
,a mn n-
NRR LICENSING SYSTEM PAGE NO
'2-41 (BOP)ESSAR/RESAR-414 PDA CURRENT STATUS REP 0RT REPORT AS OF 11/30/82 PLAN T CNARACTEP I S T I C 5:
KEY PERS0NNEL DOCKET NO:
00007S91 LIC. PM:
. UNASSIGNED ASLB CNAIR:
APPLICANT:
EBASCO SERVICES LIC. BC:
C.
THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 REGION:
0 AE:
EBASCO COUNSEL:
UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
RM ANALYST:
M. KING CURRENT SAF. ST A T'JS :
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DJCKETED:
ER SITE VISIT COMPLETE:
l INPUT TO DES TO PM:
1 ISSUE DES:
l RESP 0dSE TO COMMENTS ON DES:
ISSUE FES:
l CURRENT ENV. STATUS:
I r o. u
~ 'a t r.
LhDERED:
11/23/77 11/23/77C
/". d c D :
02/02/78 02/02/78C
' d'S RECEIVED BY PM:
N/S i
5AR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
CCMMISSIDH DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
M.l
HRR L ICENSING SYSTEM PAGE NO 2-42 (BOP)GAISSAR PDA CURRENT STATUS REPORT REPORT AS OF 11/30/82 PLANT CHARACT E R I 5 T I C S:
KEY P E R S 0 N N E L!
DOCKET NO:
05000595 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
GILBERT COMMONWEALTH LIC. BC:
C. THOMAS MEMBER 1:
I LOCATION:
N/A LIC. LA.:
P.
ANDERSON NEMBER 2 1
REGION:
4 AE:
WEST COUNSEL:
M. KARMAN CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
RM ANALYST:
- 5. ST MARY j
l CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
l Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
l ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
l l
l CURREMT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/24/78 02/24/78C SAR DOCKETED:
08/21/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
N/S INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
HRR LICENSING SYSTEM PAGE NO: 2-43 I
(BOP)GIBBSSAR (W)
PDA CURRENT STATUS REP 0RT REPORT AS OF 11/30/62 PLANT CHARACTERISTICSt KEY P E R S 0 N N E Le DOCKET NO:
05000584 LIC. PM
. UNASSIGNED ASLB CHAIR APPLICANT:
GIBBS & NILL LIC. BC:
C.
THOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE:
GHDR COUNSEL:
M. WAGNER CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/15/76 10/15/76C SAR DOCKETED:
04/08/77 05/10/77C SAR Q'S RECEIVED BY PM:
02/03/78 03/16/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S i
ISSUE DRAFT SER:
1 INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISIDH:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATFST AMENDMENT:
NEW SLIPS / NOTES:
I I
l gb
^ -
4%
^
J
NRR LICENSING SYSTEM PAGE NO: 2- 04 (20P)$WESSAR/BSAR-205 PDA CURRENT STA TUS REPORT REPORT AS Olv: 11/30/82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:
00000595 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
STONE 8 WEBSTER LIC. BC:
C.
THOMAS MEMBER 1:
LOCATION:
N/A LIC.
LA.'
P. ANDERSON NEMBER 2:
REGION:
O AE:
58W COUNSEL:
UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT,0000 MWE CONST: N/A RM ANALYST:
M. KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
N/A ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
12.15/75 12/22/75C l
SAR DOCKETED:
12/22/75 12/22/75C SAR Q'S RECEIVED BY PM:
11/12/76 04/04/77C l
SAR APPL. RESPONSE TO Q'S RECEIVED: 01/14/77 05/20/77C 1
INPUT TO DRAFT SER TO PM:
N/S CURRENT HRG. STATUS:
ISSUE DRAFT SER INPUT TO SER:
09/09/77 10/13/77C ISSUE SER:
10/19/77 12/02/77C ACRS LETTER RECEIVED:
01/15/78 01/13/78C l
INPUTS TO SE SUPPLEMENT 1 N/S l
ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR LICEN5ING SYSTEN PAGE NO 2-43 (NSS)CESSAR SYSTEM 80 FDA CURRENT STA TUS REP 0RT REPORT AS OF 11/30/82 PLAN T CHA R A C T E R I 5 T I C S:
KEY PERS0NNEL DOCKET NO:
05000470 LIC. PM:
C. GRIMES ASLB CHAIR APPLICANT
- COMBUSTION ENGINEERING LIC. BC:
C.
THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P.
ANDERSON MEMBER 2:
REGION:
0 AE:
COUNSEL:
M. WAGNER CONST. INSP REAC. TYPE: PWR NSSS: COMB ANTITRUST:
RESID. INSP DESIGN PWR: 3500 MWT/1295 MWE CONST:
RM ANALYSTr M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81.
Awaiting documentation to resolve ACRS, open, and confirmatery issues.
ER DOCKETED:
ER SITE VISIT COMPLETE:
i 1
INPUT TO DES TO PM:
l ISSUE DES:
RESPONSE TO COMMENTS ON DES:
i ISSUE FES:
I CURRENT ENV. STATUS:
N/A.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C INPUT TO DRAFT SER TO PM:
N/S CURRENT HRG. STATUS:
ISSUE DRAFT SER:
N/S N/A.
INPUT TO SER:
11/01/81 11/13/81C ISSUE SER:
05/01/82 11/10/81C ACRS LETTER RECEIVED:
06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 1:
02/28/83 ISSUE SE SUPPLEMENT 1:
03/30/83 CURRENT ANTITRUST:
NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISION:
07/00/83 SPECIAL PROJECT COMPLETE:
07/29/83 LATEST AMENDMENT:
NEW SLIPS /HDTES:
I
m HRR LICEHSIHG SYSTEM PAGE HO: 2-46 (NSS)GESSAR SEVERE ACC FDA CURREHT STATUL REP 0RT REPORT AS OF 11/30/82 PLAHT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
00007447 LIC. PM:
D. LYNCH ASLB CMA!R: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C. THOMAS MEMBER 1:
N/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
N/A REGION:
0 AE BRAUN COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: BWR HSSS: GE ANTITRUST:
RESID. INSP DESIGN PWR: 3579 MWT/1220 MWE CONST:
RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.
Dates shown reflect review for the severe accident ER DOCKETED:
design.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION T ENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
10/15/82 SAR APPL. RESPONSE TO Q'S RECEIVED. _'/01/83 j
I CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
l INPUT TO SER:
02/01/84 i
ISSUE SER:
03/01/84 l
ALRS FULL COMMITTEE MEETING:
04/P6/84 INPUTS TO SE SUPPLEMENT 1 04/21/84 ISSUE SE SUPPLEMENT 18 05/25/84 CURRENT ANTITPUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A l
COMMISSION DECISION:
05/00/84
(
SPECIAL PROJECT COMPLETE:
05/00/84 LATEST.*ENDMENT:
FDA Amendment No. 9 was received in November, 1982.
NEW SLIPS / NOTES:
l l
l r. n.,,..,
-. ',i I
q,." - .
~'t 4
t
^,. t.,:
.t
~T,, T;
/_ ;
s',
~. _ ; l1 ^li q
r$.
...y 4 \\.e:
- ,a q 9 ;- [. l. ;. '. '..y '.e.'. -'..
L m.../' ?._
b, 4
s-4
- r+
g.-
la.
..,; '.. y
,y z
l,. '. :_
{-
~
,r'
. l k..
NQR LICENSING SYSTEM PAGE NO: 2-47 (NSS)GESSAR-238 NI FDA CURRENT STATUS REPORT REPORT AS OF 11/30/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E Le DOCKET NO:
05000447 LIC. PM:
D. LYNCH ASLB CHAIR N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C. THOMAS MEMBER 18 N/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 28 N/A REGION:
0 AE2 BRAUN COUNSEL:
B. BORDENICK CONST. INSPs REAC. TYPE: BWR NSSS GE ANTITRUST:
RESID. INSP DESIGN PWR 3579 MWT/1220 MWE CONST:
RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82.
The foundation analysis issue will require special attention. PRA for severe ER DOCKETED:
accident design was submitted 4/82.
Severe accident ER SITE VISIT COMPLETE:
design modifications were submitted 6/82 in Amendment INPUT TO DES TO PM:
No.
4.
GE has requested the EDO to accelorate the ISSUE DES:
PRA review schedule to coincide with the FDA.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERCO:
03/31/80 03/31/80C g
SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
10/15/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 12/30/82 j
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
l INPUT TO SER:
02/01/83 ISSUE SER:
33/02/83 ACRS FULL COMMITTEE MEETING:
04/08/83 I
INPUTS TO SE SUPPLEMENT 18 04/15/83 ISSUE SE SUPPLEMENT 1:
05/12/83 CURREN[ ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISION:
05/08/83 SPECIAL PROJECT COMPLETE:
05/00/83 LATEST AMENDMENT:
FDA Amendment No. 9 was received in November, 1982.
HEW SLIPS / NOTES:
l NRR L ICENSING SYSTEM PAGE NO:
SPC CURRENT STA TUS REPORT REPORT AS OF: 11/30/82 PL ANT CHA R A CTERI ST I C 5:
KEY PERS0NN E L:
DCCKET NO:
05000437 LIC. PM:
C. MOON ASLB CHAIR:
- 5. WOLFE AFPLICANT:
OFFSHCRE PCWER SYSTEMS LIC. BC:
E. ADENSAM MEMBER 1:
D. SCHINK LOCATION:
JACKSONVILLE, FLA.
LIC.
LA.'
N.
DUNCAN MEMBER 2:
G. 3RIGHT REGION:
2 AE:
OPS COUNSEL:
D. GODDARD CONST. INSP REAC. TYPE: PWR NS$$: WEST ANTITRUST:
J. RUTBERG RESID. INSP:
DESIGN PUR: 3411 MWT/1150 MWE CONST: OPS RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE ML matters have been addressed by applicant. SSER 4, covering TMI requirements and other previous unresolved ER DOCKETED:
07/05/73 07/05/73C issues, was istued 09-29-81.
An ACRS subcommittee ER SITE VISIT COMPLETE:
08/16/73 08/16/73C meeting was held on 10-15-81 The ACRS sent a favorable INPUT TO DES TO PM:
07/01/74C lotter on 10-19-81.
Comnission Decision is projected ISSUE DES:
04/12/74 07/24/74C for 11/82.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
10/06/75 10/06/75C CURRENT ENV. STATUS:
All environmental statements have been issued.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
05/07/73 05/07/73C SAR DOCKETED:
07/05/73 07/05/73C SAR Q'S RECEIVED BY PM:
02/15/74 02/15/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/08/74 04/08/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/25/75 07/25/75C Suppl. 4 to the SER was entered into the record on 12-4-81.
ISSUE DRAFT SER:
Hearing reopened and closed on 12-4-81.
Licensing Board INPUT TO SER:
08/22/75 08/22/75C issued an Initial Decision on 6-30-82, authorizing the ISSUE SER:
09/30/75 09/30/75C Director of HRR to issue a manufacturing license, subject to a condition, to OPS for the manufacturing by the end ACRS LETTER RECEIVED:
10/19/81 10/19/81C of 1999 of eight standardized floating nuclear plants at INPUTS TO SE SUPPLEMENT 42 02/20/76 03/05/76C Blount Island, Jacksonville, Florida.
ISSUE SE SUPPLEMENT 4:
09/00/81 09/29/81C CURRENT ANTITRUST:
HEARING STARTED:
06/17/76 06/15/76C ASLB INITIAL DECISION:
06/30/82 06/30/82C COMMISSIDH DECISION:
11/00/82 i
l SPECIAL PROJECT COMPLETE:
11/00/82 LATEST AMENDMENT:
NEW SLIPS / NOTES:
l 4
9
p NRR LICENSING SYSTEM PAGE NO: 2-49 CARROLL SITE ESR CURRENT STATUS REP 0RT REPORT AS OF 11/30/82 PL AN T CHARACTER I STICS:
KEY PERS0NNEL:
DOCKET NO:
05000599 LIC. PM:
J. WILSON ASLB CHAIR:
J. WOLF APPLICANT:
COM:10NWEALTH EDISON LIC. BC:
C.
THOMAS MEMBER 1:
G.
BRIGHT LOCATION:
CARROLL COUNTY, IL.
LIC. LA.:
P. ANDERSON MEMBER 2:
R. HOLTON REGION:
3 AE:
COUNSEL:
R. LESSY CONST. INSP REAC. TYPE:
HSSS: WEST ANTITRUST:
A. HDDGDON RESID. INSP:
DESIGN PWR: 0000 MWT/1120 MWE CONST:
RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The commercial operation date has been postponed until 1999 - 2000.
This license ER DOCKETED:
04/07/79 04/07/79C is not under active review.
ER SITE VISIT COMPLETE:
N/S INPUT TO DES TO PM:
N/S ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES:
N/S ISSUE FES:
N/S i
CURRENT ENV. STATUS:
Portions of the alternate site study are under review SAFETY / HEARING MILESTONES:
by DOE.
APPLICATION TENDERED:
12/20/78 12/20/78C SAR DOCKETED:
SAR APPL. RESPONSE TO Q'S RECEIVED:
INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
l Five intervenors have been admitted.
ISSUE DRAFT SER:
INPUT TO SER:
l ISSUE SER:
ACRS FULL COMMITTEE MEETING:
INPUTS TO SE SUPPLEMENT l
ISSUE SE SUPPLEMENT CURRENT ANTITRUST:
Awaiting updated antitrust information from applicant.
HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
HEW SLIPS / NOTES:
NRR LICENSING SYSTEM AS OF 11/30/82 NON-POWER REACTDRS INPUT ISSUE EARLIEST ISSUEW TER ISSUE FES OR START ISSUE NON-POWER FACILITY DOCKET Dil TO PM Ifg E1A HEARING EL COMMENTS AFRRI. TRIGA 1000.0000W TANK ESTIMATED DATE: 10/89 N/A 09/81C 01/82 N/S 06/83 N/S CONTESTED CASE ACTUAL DATE:
10/80C 01/82C CORNELL tl.,
TRIGA 100.0000W POOL ESTIMATED DATE: 05/80 N/A 12/82 04/83 04/83 N/A 04/83 ACTUAL DATE:
05/80C CORNELL U.,
ZPR 1000W POOL ESTIMATED DATE: 10/78 N/A 12/82 04/83 04/83 N/A 04/83 ACTUAL DATE:
10/78C IOWA STATE, UTR-10 i
10.0000W ESTIMATED DATE: 09/79 N/A 10/83 02/84 02/84 N/A 02/84 l
ACTUAL DATE:
09/79C MANHATTAN COLLEGE
.0001W POOL ESTIMATED DATE: 08/83 N/A 08/84 10/84 10/84 N/A 10/84 ACTUAL DATE:
MICH. STAT'., TRIGA MARK 25u 0000W PROTO ESTIMATED DATE: 09/77 N/A 09/83 11/83 11/83 N/A 11/83 ACTUAL DATE:
09/77C NBSR I
10.0000W T ESTIMATED DATE: 12/80 02/82 09/82C 11/82 09/82 N/A 01/83 POWER INCREASE TO 20 MW l
ACTUAL DATE:
12/80C 02/82C 09/82C INCLUDED IN RENEWAL 1
RENSSELAER I
.0000W CP.ITI ESTIMATED DATE: 05/79 N/A 37/83 10/83 10/80 N/A 10/83 l
ACTUAL DATE:
05/79C STATE U OF NY PULSTAR 2000.0000W POOL ESTIMATED DATE: 06/79 N/A 12/82 03/83 03/85 N/A 03/83 ACTUAL DATE:
06/79C TEXAS AEM, TRIGA 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 07/82C 10/82 12/82 N/A 12/82 ACTUAL DATE:
07/79C 10/82C U.
C'.J NS AS 250.0000W POOL ESTIMATED DATE: 03/80 N/A 06/83 09/83 09/80 N/A 09/83 ACTUAL DATE:
03/80C U. OF MD.,
TRIGA 250.0000W TRIGA ESTIMATED DATE: 05/79 N/A 02/83 06/83 06/83 N/A 06/83 ACTUAL DATE:
05/79C l
i
NRR LICEN$ING SYSTEM AS OF:11/30/82 NON-POWER REACT 0RS INPUT ISSUE EARLIEST ISSUEW TER ISSUE FES OR START ISSUE HON-POWER FACILITY DOCKET RES TO PM IER EIA NEARING gi COMMENTS U. OF MO.,
ROLLA 200.0000W POOL ESTIMATED DATE: 10/79 N/A 11/83 03/84 03/84 N/A 03/84 ACTUAL DATE:
10/79C U. OF OKLA.. AGN-211 to
.0150W HOMOG ESTIMATED DATE: 10/75 N/A 04/83 06/83 03/83 N/A 05/83 ACTUAL DATE:
10/18C U. OF TEXAS. TRIGA 250.0000W U-ZR ESTIMATED DATE: 05/80 N/4 05/83 08/83 07/80 N/A 07/83 ACTUAL DATE:
05/80C U. OF UTAH. TRIGA MARK 100.0000W R ESTIMATED CATE: 03/83 N/A 02/84 04/84 04/84 N/A 04/84 ACTUAL DATE:
l U. OF VA.,
.1000W R ESTIMATED DATE: 06/84 N/A 07/84 09/84 09/84 N/A 09/84 l
l ACTUAL DATE:
l UNION CARBIDE 5000.0000W POOL ESTIMATED DATE: 05/80 N/A 10/82C 03/83 03/83 N/A 03/83 ACTUAL DATE:
05/80C VA HOSP., TRIGA 18.0000W 42150 ESTIMATED DATE: 01/80 N/A 04/83 07/83 07/83 N/A 07/83 ACTUAL DATE:
01/80C l
VA. POLY. INST., UTR-10 100.0000W GRAPH ESTIMATED DATE: 10/79 N/A 04/84 07/84 07/84 N/A 07/84 ACTUAL DATE:
10/79C WEST., TRAINING REACTOR 10.0000W R ESTIMATED DATE: 12/81 N/A 02/84 04/84 04/84 N/A 04/84 ACTUAL DATE:
12/81C WORCESTER POLY TECH 10.0000W ESTIMATED DATE: 07/79 N/A N/A 11/82 N/S N/A 12/82 ACTUAL DATE:
07/79C
- FOR TEST REACTORS ONLY
M M
M Z
O M
O W
th
NRR L ICENS ING SYSTEM PAGE NO: 2-0L CURRENT STATUS REPORT REPORT AS OF:
PL ANT CHA RACT E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
Docket No. or Project No.,if not docketed LIC. PM:
Licensing Project Mansger ASL B CH AIR: ASLB Chairman
~
APPLICANT:
Utility LIC. BC:
Licensing Branch Chief MEMBER 1:
on panel LOCATION:
Miles and direction from nearest major town LIC. LA.
Licensing Assistant MEMBER 2 on panet REGIDH:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONS T. I NSP : Construction inspector REAC. TYPE: PWR BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST:
Antitrust Attorney RESID. INSP: Resident inspector DESIGN PWR: Megawatts electric & thermal CONST: Constructor MPA ANALYST: MPA analyst assigned to track project CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplish nents and schedule ER DOCKETED:
Environmental Report changes occurring since the last issue of Blue Book. Outstanding issues and late input from 0
ETE:
review branches should be indicated, along with indication of the critical path.
P O
T ISSUE DES:
Draft Environrnental Statement RESPONSE TO COMMENTS ON DES:
ISSUE FES:
Final Environmental Statement CURRENT ENV. STATUS:
Environmental status for this reporting period only. It consists of accomplishments and schedule changes o-curring since the last issue of Blue Book. Outstandmg issues and late SAFETY / HEARING MILESTONES:
input from review branches should be indicated.
APPLICATION TENDERED:
SAR DOCKETED:
Safety Analysis Report SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
Safety Evaluation Report Changes in the hearing tiates since the last issue of Blue Book. Changes in intervention and INPUT TO SER:
contentions should be indicated.
ISSUE SER:
ACRS LETTER RECCIVED:
Advisory Committee INPUTS TO SE SUPPLEMENT 3:
on Reactor Safeguards ISSUE SE SUPPLEMENT 3:
CURRENT ANTITRUST:
HEARING STARTED:
Changes in the antitrust stztus since the last issue of Blue Book.
ASLB INITIAL DECISION:
Atomic Safety & Licensing Board ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
_ ISSUE FULL POWER LICENSE:
The latest amendment submitted by the applicant.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
- icant, 9o cof Date en Slips or potential problems that should be brought to management's attention.
m, ng, construction an construction completion completion l
- 1. Hi PORT f,uMat H eassera b, port fJHC
- one 335 U S NUCL E. AH HtGUL AT OHY COYMISSION
,7 y y BIBLIOGRAPillC DATA SHEET NUREG-0580 Vol. 11 No. 11 2 (L eser ble,al 4 1l1Li AND SUB181L E (And Votame No, of appnevaret Regulatory Licensing Status Suainary Report 3 HE CIP4 N T'S ACCITSION NO.
(Bluebook)
$ DATE HL POHT COMPL E 1E D 7 AU T HOH tSI
) YL AH M ON T H November 1982 DAIL HE POHT ISSuf D 9 PE Hi OHMING OHG AN1/ AllON N AME ANO f.9 AILING ADDHE SS (Inc'ude 2,p Conel
!"^"_
Office of Resource Management December 1982 Management Information Branch 6 " " *
U. S. Nuclear Regulatory Coninission Washington, D.C.
20555 8 (L eaer ble,hl 12 SPON50HING OHG AN1/ A flON N AVL AND f.? Alt LNG ADDHL SS (loclude lep Codel P OJL C1 T ASK/WOHK UNIT NO Office of Resource Management II, CON T H ACI NO Management Infonnation Branch U. S. Nuclear Regulatory Coninission Washington, D.C.
20555 s t Hion co,vt HE D I/ncius or deres/
13 T YPE OF AL POHI October 16, 1982 - November 30, 1982 14 Iled" d"Al 15 SUPPL L MF N T AHY NOf f S
'6 AHS1 H AC T (100 w ords or lesst Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.
17a Dl hC HIP I OHS 17 A t Y won DS AND DOCUMl fg T AN AL YSIS
- ~ ~ ~ ~ ~ ^ ~ '
/b 4 DE N 1 s t 1[ HS Ol'l N L N DF 011 HMS
.. - ~.. - -... - -... _ - -. _ _. - - - - - -
~- -~~
^~
S M CUHs i Y Cl A% e Ta i,,poni 21 NO Of PAM S AV AIL AB I L I T V SI A T E f.*t N T Unclassified Unlimited 20 u cI,assi fiedHitv,n,.sstr ic.
2.' enici Unc i
UNITED STATES
,.s, ciass man 5 + 0 l
NUCLEAR REGULATORY COMMISSION
'05' '6' 8 ' "c csna e
WASHINGTON, D.C. 20%5 eas a c reavite. hit j
e 06 FICI AL BUSINESS B
P[N ALTY FOR PRIVATE USE. $YU
{
5 1
5 II I
e I
e l
l l
i l
l t
l e
9 h