P TENNESSEE VALLEY ' AUTHORITY CH ATTA NOOGA, TENNESSEE 374of 400 Chestnut Street Tower II December 14, 1982 BLRD-50-438/82-20 BLRD-50-439/82-18
_>a U.S. Nuclear Regulatory Commission
- h, Region II o
_6 Attn:
Mr. James P. O'Reilly, Regional Administrator g
tla a e rg 3030 g
Dear Mr. O'Reilly:
BELLEFONTENUCLEiRPLANTUNITS1AND2-OMISSIONSTOAUXILIARYFEEDWbR PUMP DRAWINGS - BLRD-50-438/82-20, BLRD-50-439/82 FOURTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Celenjak on February 25, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8207. This was followed by our interim reports dated March 25, July 20, and September 7, 1982. Enclosed is our fourth interim report. We expect to submit our next report by April 9, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY i
L. M. Mills, Manager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
l OFFICIAL CUl3 8212210122 821214 g/ g-A /
f PDR ADOCK 05000438 S
PDR An Equal Opportunity Ernployer
.___________________._______________________J
+. s ~
+
ENCLOSURE
-BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 OMISSIONS TO AUXILIARY FEEDWATER PUMP DRAWINGS NCR BLN BLP 8207 BLRD-50-438/82-20, BLRD-50-439/82-18 10 CFR 50.55(e)
FOURTH INTERIM REPORT Description of Deficiency The auxiliary feedwater (AFW) pumps were purchased without vent, drain, and turbine bearing cooling water interconnecting piping.
Connections to the pumps and turbines were supplied by the respective manufacturer with the understanding that TVA would provide the necessary piping design drawings and materials to meet TVA's and the pump specifications. The vents, drains, and turbine bearing cooling water interconnecting piping were not designed.
Interim Progress The AFW pump vents, drains, and turbine cooling water interconnecting piping have been designed and incorporated on the Design Criteria Drawing (DCD) (3BWO618-CA-01) and the physical drawings (3BWo418-CA series). Turbine bearing cooling water piping is undergoing rigorous analysis. TVA will supply additional input on this nonconformance upon completion of the rigorous analysis.
I 6
.=