Proposed Tech Specs Table 6.2.1 Re Shift Crew Composition - Min Requirements
ML20070C419
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/27/1994
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20070C416 List:
References
NUDOCS 9407050258
Download: ML20070C419 (4)


Text

. _ . . _ __ . _ _ _ _- _ . . ._ .. . _ _ ~ _ _ _ .

1 Unit 2 .I I

PBAPS Table 6.2.1 Shift Crew Composition - Minimum Requirements One or Both Units Operating *: 1 Shift Manager (SRO) 1 Shift Supervisor (SR0)** l 3 Reactor Operators (RO) 5 Operators 1 Shift Technical Advisor ** l Both Units not Operating

  • 1 Shift Manager or shift Supervisor (SR0) 2 Reactor Operators (RO) 5 Operator.s 1

SR0 - NRC licensed senior reactor operator R0 - NRC licensed reactor operator

  • For the purpose of this table, a unit is considered not to be operating when it is in a Cold Condition with the reactor mode switch in shutdown or refuel.
    • When the STA position is filled by an on-shift SRO, provided the individual meets the 1985 NRC Policy Statement on Engineering Expertise on Shift, the shift crew composition must have a minimum of 3 SR0s.

'I J

i i

i

. l

! l l -245-9407050258 940627 l l PDR ADOCK 05000277  :

P PDR t

f, , , . . , , . . - , _ . . . . _ . , . _ _ . . . ~ _ _ . _ . . . _ . _ _ , , . . . . _ . _ . - ~ . , . . . _ _ _ . _ _ ... . . - .

l Unit 2 PBAPS

'6. 3 Facility Staff Oualifications 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1) Senior - Health Physicist (radiation protection manager) who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on l Shift. I l

i 6.4 Trainina 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Superintendent-Training 1 and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and  !

10 CFR 55, Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit 6.5.1 Plant Operations Review Committee (PCRC) 6.5.1.1 f. unction The Plant Operations Review Committee shall function to advise the Plant Manager on all matters related to nuclear safety.

i 6.5.1.2 Composition The Plant Operations Review Committee is composed of nine regular members from Peach Bottom Atomic Power Station staff. Members shall collectively have experience in the following areas:

Plant Operations Engineering Maintenance Instrumentation and Controls Planning Radiation Safety Chemistry Experience Assessment Members shall meet the requirements of ANSI N18.1-1971, Sections 4.2, 4.4, or 4.6 for applicable required experience and be appointed in writing by the Plant Manager. The Chairman and alternate Chairmen of the PORC shall be drawn from the PORC members and appointed in writing by the Plant Manager.

6.5.1.3 Alternates 1

Alternate members shall be appointed in writing by the PORC Chairman to l serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

-246-

Unit 3 PBAPS Table 6.2.1 Shift Crew Composition - Minimum Requirements One or Both Units Operating *: 1 Shift Manager (SRO) 1 Shift Supervisor (SRO)** I 3 Reactor Operators (RO) 5 Operators 1 Shift Technical Advisor ** l Both Units not Operating

  • 1 Shift Manager or Shift Supervisor (SRO) 2 Reactor Operators (RO) 5 Operators SR0 - NRC licensed senior reactor operator R0 - NRC licensed reactor operator
  • For the purpose of this table, a unit is considered not to be operating when it is in a Cold Condition with the reactor mode switch in shutdown or refuel.
    • When the STA position is filled by an on-shift SRO, provided the individual meets the 1985 NRC Policy Statement on Engineering Expertise on Shift, the shift crew composition must have a minimum of 3 SR0s.

-245-

..' Unit 3 PBAPS l 1

'6. 3 Facility Staff Oualifications l 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1) Senior - Health Physicist (radiation protection manager) who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift.

6.4 Trainina 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Superintendent-Training and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and 10 CFR 55, Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audil 6.5.1 Plant Operations Review Committee (PORC) 6.5.1.1 Function The Plant Operations Review Committee shall function to advise the Plant Manager on all matters related to nuclear safety.

6.5.1.2 [gmoosition The Plant Operations Review Committee is composed of nine regular members from Peach Bottom Atomic Power Station staff. Members shall collectively have experience in the following areas:

Plant Operations Engineering Maintenance Instrumentation and Controls l Planning l Radiation Safety l Chemistry l Experience Assessment ,

Members shall meet the requirements of ANSI N18.1-1971, Sections 4.2, 4.4, or 4.6 for applicable required experience and be appointed in l writing by the Plant Manager. The Chairman and alternate Chairmen of the l l PORC shall be drawn from the PORC members and appointed in writing by the l l Plant Manager. j i 1

, 6.5.1.3 Alternates i i  !

l Alternate members shall be appointed in writing by the PORC Chairman to i serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

-246-