ML20070C414
| ML20070C414 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/27/1994 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20070C416 | List: |
| References | |
| NUDOCS 9407050256 | |
| Download: ML20070C414 (3) | |
Text
Statfor, Support Dspartmerit 10 CFR 50.90 WIh PECO ENERGY
== i=;1_
965 ChesterbrocA Boulr*wd Wayne. PA 19087-5691 June 27,1994 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications Change Request 93-10
Reference:
Letter from G. A. Hunger, Jr. (PECO Energy) to U. S. Nuclear Regulatory Commission dated October 27,1993 Gentlemen:
In the above referenced letter, PECO Energy Company submitted, in accordance with 10CFR50.90, Technical Specifications Change Request (TSCR)
No. 93-10 which requested changes to Appendix A of the Peach Bottom Facility Operating Licenses.
PECO Energy hereby requests that our original submittal be revised, specifically, that the minimum requirements for shift crew composition be I
increased from a minimum of two SROs to three SROs when the STA position I
is filled by one of the on-shift SROs. A revised page 245 for each unit is enclosed. Page 246 was revised to reflect information in Section 6.5.1.2 changed by Amendments Nos.190 and 195 on April 26,1994, and is enclosed for each unit. We have concluded that the proposed revision does not affect the conclusions previously submitted in the referenced letter regarding a safety assessment, information supporting a finding of No Significant Hazards Consideration, and information supporting an Environmental Assessment.
[9lg 0
" ' ' ~
94o7050256 94o627 PDR ADOCK 0500o277 i
P PDR Q
i l
1 June 27,1994 l
Pags 2 1
J If you have any questions concerning this matter, please do not hesitate to contact us.
Very truly yours, G. A. Hunger, Jr., Director Ucensing l
JLP/eas i
Enclosures:
Affidavit, Proposed Page 245, Proposed Page 246 cc:
T. T. Martin, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania q
I i
i l
COMMONWEALTH OF PENNSYLVANIA ss.
COUNTY OF CHESTER i
W. H. Smith, Ill, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the request to revise Technical Specifications Change Request (Number 93-10) for Peach Bottom Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief, hl/ /
//
Vice Preside'nt Subscribed and sworn to before me this day of 1994.
/
-s
~
, Q
& /
Notary Public nxauseal Erbi A Santort retary Pubic My Comr
$xpresJuly 095 1
i
,