OPERATING DATA REPORT DOCKET NO. 50-302

}

DATE 12/2/82 COMPLETED BY D. Bogart.

TELEPHONE (9041 79s-6486 OPERATING STATUS Notes

\\

I. Unit Name:

Crv9 Pal River l'ni e #1

2. Reporting Period:

11/1/82 - 11/30/82

3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Cr.pacity (Gross MWe):

845 ___

7. Maximum Dependable Cipacity (Net MWe):

806

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:

N/A meum

9. Power Level To Which Restricted. If Any (Net MWe):

2475 MW thermal

10. Reasons For Restrictions,1f Any:

Pump Power Monitors in bypass.

This Month Yr.-to-Date Cumulative I1. Hours In Reporting Period 720 8016 50136

12. Number Of Hours Reactor Was Critical 605.5 6506.5 31955.9
13. Reactor Reserie Shutdown Hours 0

71.1 1280.3

14. Hours Generstar On-Line 604.1 6411.5 31223.7
15. Unit Reserve Shutdown Hours 0

0 0

16. Gmss Therma (Energy Generated (MWH) 1446661 14596708 69963649 l
17. Gross Clectrical Energy Generated (M$)

501644 4972571 23772162

18. Net Electrical Energy Generated (MWH) 478612 4730358 22559656 I
19. Unit Service Factor 83.9%

80.0%

62.3%.

20. Unit Availability Factor 83.9%

80.0%

62.3%

21. Unit Capacity Factor (Using MDC Net) 82.57 73.27 57.3%
22. Unit Capacity Factor (Using DER Net) 80.6%

71.5%

54.5%

23. Unit Forced Outage Rate 16.1%

20.0%

25.3%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Rofuni nuence hecinnine 3/19/82.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

17 /16 /R7_

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved

. INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIA L OPERATION 3/13/77 8212140051 821209 (9/77)

PDR ADOCK 05000302 R

PDR l-

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-107 UNIT FLCRP-3 DATE 12/2/82 COMPLETED BY D. Bogart TELEPHONF, (904) 795-6486 MON 7M Nnvomhor 14M DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) 1 79/4 17 855 2

835 gg 813 855 819 3

,9 4

776 20 824 5

722 822 23 485 839 6

7 695 23 826 8

827 791 24 831 723 9

3 10 830 26 74 ll 797 0

27 12 28 0

13 855 0

29 804 14 30 0

15 33 16 812 INSTRUCTIONS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE 12/2/82 COMPLETED BY MX cn1vor REPORT MONTH I1/82 TELEPHONE f904) 795-6486 E

c

.] g 3

j $5 Licensee h

{*3 Cause & Corrective No.

Date g

3 ij s

2ss Event gg Action to gU f5 5

j iji g Report 4t mV H

Present Recurrence g

d 82-29 821105 F

H N/A N/A CH PUMPXX Reduced power to investigate excessive vibration of MFWP "A".

Found a maintenance tool still in place from work done some previous outage.

Removed the tool and the excessive vibration ceased.

82-30 821125 F

A N/A No LER # yet.

PC HTEXCH Reduced power to investigate contam-See NCOR 82-ination levels. The letdown valve 322.

was leaking. This was corrected but Nuclear Services Closed Cycle Cooling contamination levels were still high.

Investigation revealed a letdown cool-er had failed.

82-31 821126 F

115.9 A

N/A No LER # yet.

PC HTEXCH Shutdown to replace both letdown See NCOR coolers.82-322 1

1 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event ReporI(LER) File (NUREG-D-Regulatory Restriction 4 Osher (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative 5

G-Operational Error (Explain)

Exhibit 1 - Same Source (9/77) llother (Explain)

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/2/82 COMPLETED BY M.W. Culver TEIJJHONE (904) 795-6486 MONTH November 1982 SUMMAkY STATEMENT:

One shutdown and two power reductions occurred at the unit this taonth.