Text
'
,g r
OPERATING DATA REPORT DOCKET NO. 50-302
}
DATE 12/2/82 COMPLETED BY D. Bogart.
TELEPHONE (9041 79s-6486 OPERATING STATUS Notes
\\
I. Unit Name:
Crv9 Pal River l'ni e #1
- 2. Reporting Period:
11/1/82 - 11/30/82
- 3. Licensed Thermal Power (MWt): 2544
- 4. Nameplate Rating (Gross MWe):
890
- 5. Design Electrical Rating (Net MWe):
825
- 6. Maximum Dependable Cr.pacity (Gross MWe):
845 ___
- 7. Maximum Dependable Cipacity (Net MWe):
806
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:
N/A meum
- 9. Power Level To Which Restricted. If Any (Net MWe):
2475 MW thermal
- 10. Reasons For Restrictions,1f Any:
Pump Power Monitors in bypass.
This Month Yr.-to-Date Cumulative I1. Hours In Reporting Period 720 8016 50136
- 12. Number Of Hours Reactor Was Critical 605.5 6506.5 31955.9
- 13. Reactor Reserie Shutdown Hours 0
71.1 1280.3
- 14. Hours Generstar On-Line 604.1 6411.5 31223.7
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gmss Therma (Energy Generated (MWH) 1446661 14596708 69963649 l
- 17. Gross Clectrical Energy Generated (M$)
501644 4972571 23772162
- 18. Net Electrical Energy Generated (MWH) 478612 4730358 22559656 I
- 19. Unit Service Factor 83.9%
80.0%
62.3%.
- 20. Unit Availability Factor 83.9%
80.0%
62.3%
- 21. Unit Capacity Factor (Using MDC Net) 82.57 73.27 57.3%
- 22. Unit Capacity Factor (Using DER Net) 80.6%
71.5%
54.5%
- 23. Unit Forced Outage Rate 16.1%
20.0%
25.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Rofuni nuence hecinnine 3/19/82.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
17 /16 /R7_
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved
. INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIA L OPERATION 3/13/77 8212140051 821209 (9/77)
PDR ADOCK 05000302 R
PDR l-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-107 UNIT FLCRP-3 DATE 12/2/82 COMPLETED BY D. Bogart TELEPHONF, (904) 795-6486 MON 7M Nnvomhor 14M DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1 79/4 17 855 2
835 gg 813 855 819 3
,9 4
776 20 824 5
722 822 23 485 839 6
7 695 23 826 8
827 791 24 831 723 9
3 10 830 26 74 ll 797 0
27 12 28 0
13 855 0
29 804 14 30 0
15 33 16 812 INSTRUCTIONS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE 12/2/82 COMPLETED BY MX cn1vor REPORT MONTH I1/82 TELEPHONE f904) 795-6486 E
c
.] g 3
j $5 Licensee h
{*3 Cause & Corrective No.
Date g
3 ij s
2ss Event gg Action to gU f5 5
j iji g Report 4t mV H
Present Recurrence g
d 82-29 821105 F
H N/A N/A CH PUMPXX Reduced power to investigate excessive vibration of MFWP "A".
Found a maintenance tool still in place from work done some previous outage.
Removed the tool and the excessive vibration ceased.
82-30 821125 F
A N/A No LER # yet.
PC HTEXCH Reduced power to investigate contam-See NCOR 82-ination levels. The letdown valve 322.
was leaking. This was corrected but Nuclear Services Closed Cycle Cooling contamination levels were still high.
Investigation revealed a letdown cool-er had failed.
82-31 821126 F
115.9 A
N/A No LER # yet.
PC HTEXCH Shutdown to replace both letdown See NCOR coolers.82-322 1
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event ReporI(LER) File (NUREG-D-Regulatory Restriction 4 Osher (Explain) 0161)
E-Operator Training & Ucense Examination F Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source (9/77) llother (Explain)
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/2/82 COMPLETED BY M.W. Culver TEIJJHONE (904) 795-6486 MONTH November 1982 SUMMAkY STATEMENT:
One shutdown and two power reductions occurred at the unit this taonth.