Text

'

,g r

. OPERATING DATA REPORT DOCKET NO. 50-302

} DATE 12/2/82 COMPLETED BY D. Bogart.

TELEPHONE (9041 79s-6486 OPERATING STATUS Notes

\ I. Unit Name: Crv9 Pal River l'ni e #1

2. Reporting Period: 11/1/82 - 11/30/82
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Cr.pacity (Gross MWe): 845 ___
7. Maximum Dependable Cipacity (Net MWe): 806
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:

N/A meum -

9. Power Level To Which Restricted. If Any (Net MWe): 2475 MW thermal
10. Reasons For Restrictions,1f Any: Pump Power Monitors in bypass.

This Month Yr.-to-Date Cumulative I1. Hours In Reporting Period 720 8016 50136

12. Number Of Hours Reactor Was Critical 605.5 6506.5 31955.9
13. Reactor Reserie Shutdown Hours 0 71.1 1280.3
14. Hours Generstar On-Line 604.1 6411.5 31223.7
15. Unit Reserve Shutdown Hours 0 0 0

, 16. Gmss Therma (Energy Generated (MWH) 1446661 14596708 69963649 -

l 17. Gross Clectrical Energy Generated (M$) 501644 , , ,

4972571 23772162

18. Net Electrical Energy Generated (MWH) 478612 4730358 22559656 ,

I

19. Unit Service Factor 83.9% 80.0% 62.3%.

! 20. Unit Availability Factor 83.9% 80.0% 62.3%

21. Unit Capacity Factor (Using MDC Net) 82.57 73.27 57.3%
22. Unit Capacity Factor (Using DER Net) 80.6% 71.5% 54.5%
23. Unit Forced Outage Rate 16.1% 20.0% 25.3%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Rofuni nuence hecinnine 3/19/82.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 17 /16 /R7_
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved

. INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIA L OPERATION 3/13/77 8212140051 821209 (9/77)

PDR ADOCK 05000302 R PDR .

_l-

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-107 UNIT FLCRP-3 DATE 12/2/82 COMPLETED BY D. Bogart TELEPHONF, (904) 795-6486 MON 7M Nnvomhor 14M DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 79/4 17 855 2 835 gg 813 3 855 ,9 819 4 776 20 824 5 722 23 822 6

485 839 7 695 23 826 8 827 791 24 -

9 831 723 3

10 830 26 74 ll 797 27 0

12 28 0 13 855 29 0 14 804 30 0 15 33 16 812 INSTRUCTIONS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE 12/2/82 I1/82 COMPLETED BY MX cn1vor REPORT MONTH TELEPHONE f904) 795-6486

- E c

, .] g 3 j $5 Licensee h ,, Cause & Corrective No. Date g 3 ij s 2ss Event gg {*3 gU Action to H

f5 5 j iji g Report 4t mV g Present Recurrence d

82-29 821105 F ----

H N/A N/A CH PUMPXX Reduced power to investigate excessive vibration of MFWP "A". Found a maintenance tool still in place from work done some previous outage.

Removed the tool and the excessive vibration ceased.

82-30 821125 F --

A N/A No LER # yet. PC HTEXCH Reduced power to investigate contam-See NCOR 82- ination levels. The letdown valve 322. was leaking. This was corrected but Nuclear Services Closed Cycle Cooling contamination levels were still high.

Investigation revealed a letdown cool-er had failed.

82-31 821126 F 115.9 A N/A No LER # yet. PC HTEXCH Shutdown to replace both letdown See NCOR coolers.82-322 1

1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data '

B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporI(LER) File (NUREG-D-Regulatory Restriction 4 Osher (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) llother (Explain)

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/2/82 COMPLETED BY M.W. Culver TEIJJHONE (904) 795-6486 MONTH November 1982 SUMMAkY STATEMENT: One shutdown and two power reductions occurred at the unit this taonth.

l

- - . - _ _ - .. . .- . . . . . . ..