ML20070C086
| ML20070C086 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/03/1982 |
| From: | Roman T NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML20070C084 | List: |
| References | |
| NUDOCS 8212140031 | |
| Download: ML20070C086 (4) | |
Text
__
e.
NIAGARA MOIIAWK POWER CORPORATION j
NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE November 1982 The Station operated during the month of November 1982 with a monthly availability factor of 0.0's and a net design electrical capacity factor of 0.0%.
The Station was shut down March 19, 1982, for a scheduled maintenance outage. The Station remains shut down due to Reactor Recirculation system piping cracks found during Vessel liydro on March 23, 1982.
CLASS I WORK - MAINTENANCE - NOVEMBER 1982 WR #18579 Filled penetrations as per WR - 11/2/82 WR #18572 Filled penetrations as per WR - 11/1/82 WR #18572 "illed penetrations as per WR - 11/7/82 WR #18576 Filled penetrations as per KR - 11/2/82 WR #18348 Filled penetrations as per WR - 11/2/82 I
WR #18685 Replaced liner 4 disc in #12 fuel pool filter flow control valve - 11/16/82 CLASS I WORK - ELECTRICAL - NOVEMBER 1982 N1-MST-M1 125 VDC batteries, cell specific gravities and battery i
voltage.
MO #1927 Equipment Qualification 50 #2151 Mark I Containment - new torus temp. monitoring WR #18957
- 11 chilled water pump motor (loose connection on fuse holder) i WR #18958
- 103 diesel, cool raw water pump (replaced control fuse),
i CLASS I WORK - INSTRUMENTATION ANL) CONTROL - NOVEMBER 1982 WR #19360 Main steam line rad. monitors #111 6 #112111. cal.
position reading low.
(Recalibrated per N1-ISP-PM7) 821214003i 821202 DR ADOCK 05000220 PDR
....,e.$
. w*g p- ; _
~'~~~M[ f ^, jQf(([
~. ~.
-~? " m z:'~-
i f
OPERATING DATA REPORT 2
DOCKET NO.
50-220 DATE 12/3/82 7 CO.\\lPLETED BY TW Rnmnn W u,,
TELEPl!ONE 3! c - ? n-il OPERA TING STATUS
- 1. Unit Name:
9 blile Point Unit #1 Notes
, Reportut;: Period:
11/01/82 - 11/30/82 1660
- 3. Licensed Thenna! Power (51Wtp
- 4. Nameplate Rating (Gross 51We):
620
- 5. Desi;n Electrical Rating (Net A!We):
bau
- 6..\\laximum Dependable Capacity (Gross Slw ):
e 01U
- 7. afaximum Dependable Capacity (Net 51We): -
r
~
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
- 9. Pow er Lesel To which Restricted. If Any (Nct alwe):
- 10. Reasons For Restrictions. If Any:
This.\\!ont h Yr.-t o-Da t e Cumulatise 720.0 8106.0 114,672.0
- 11. Ilot.rs In Reportine Pen. d o
v.u
- 12. Number Of Ilours Reactor Was Critical 1874.0 81,308.5
- 13. Reactor Resen e Shutdown ilours 0.0 0.0 1,204.2
- 14. liours Generatur On.Line 0.0 18/2.5
./6,604.a
- 15. Unit Res ne Shutdow n flours 0.0 0.0 20.4
- 16. Cross Therms! Energy Generated (SiWili 0
3,421,090 129,a/4,avu 17 Grow Electrini Fner;y Generated f \\!w!!)
O 1,169,791 42,743,090 IS. Nei Electnc.:n t.nesty Generated t \\1n a; O
1,134,738 41,392,651
- 19. Umt 5enice ::cror 0.0 25.4 68.9 20 U."
't L.':'
T::. :
U'U Ab A 06'U 21 U: ' C;,.
Tactor (Un; AIDC !at,
0.0 23.0 59.2
- 22. Uma Can.sens I actor (Usme DER Net) 0.0 22.0 ds.z
- 23. Unit Forecd Ourage Rair 100.0 to.z M.2
'). Shutdow ns Scheduled Oser. Nest 6 51onths iT,s pe. Date.aia: Dur.:ti.m uf Each:
25 If Shut Iban \\t EnJ Of Report Period. Lstnnated Date of Startup.
September 1983 2tr Lnas In Ics Status ti'rior tu Cumntercial Oper.ition)
Forecast A chiesed INITI \\ L CRITICA Lil Y INITI A L El.LCI RICI T Y LO\\t\\lERCl \\ L Ol'El: \\ a !O.N
(*3/7 7 p
r--
q.-
.I, t
UNIT NAME g
3,4a 50-220 UNITSilUTDOWNS AND POWER REDUC 110NS DOCKEFNO.
ti
/ h-DATE 12 / 5/ '
REPORT MON'lil Nov. 1982 COMPLETED BY - TW Roman )c4cNg Y IILEPil0NE 315-343-2110 '
c ;
X1355 O
I "L
)
4 to 2
- i$
=
ei c
.E :-
E II E 'A LI"5
No.
Daie
{
3g g
2g5 Event 55"
$"4 Cause & Curreceive
'i
,3 1
Action to I
c3 3 5
j15g Report
- N0 y'
Prevent Recurrence I;
6 e f It s
a 1.
8206 820323 F
720 A
4 82-009 it R,' placement of recire, piping con-e 1,
- tinues, i;
TOTA. 6010
,)
I w- ~ ji r p
+ : t i
- I i t,-
!)
h V t p:
ic-l i
' t.
1 0
g p
,,5 I
2 3
"Y F: Forced Reason:
4 yi Method:
S: Scheduled A Equipment Failure (Explain) 1 Manual
/
Exhibit C. instructions
' 9 p;'
for Preparation of Data
'. {
B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee i
C Refueling 3 Automatic Scram.
W Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 01611
'E Operator Training & l.icinse Examination t
F Administrative j}
}
d 5
G Operational Errin (E>pt.hd J
19/77)
Il Olher (Explain) jj Exhibit I Same Suuree
" [
p
.(
li.'
1
{I eif M
AVER ACE D AILy tNIT POhER LEVEL t
~E O DOCKET NO.
UNIT 9 blile Pt. #1 DATE 12/3/82
'IW Roman COMPLETEDBy pg TELErllONE 315-3'43-2110, Ext. 138%
November 1982 AIONTH DAY AVERAGE DAILY POWER LEVEL:.
DAY AVERACE DAILY POWER LEVEL IMWe NetI (MWe-Net 1 0
0 1
17 2
0 IE 0
3 19 0
0 0
4 20 5
0 0
23 0
6 22 0
0 7
23 8
0 0
24 0
9 25 0
0 10 26 g
1!
0 0
l 27 12
- o 0
25 13 0
0 29 la o
0 30 15 g
0 31 16 0
INSTRUCTIONS On tids fuggnag, g'" llit 3%erate dasiy "" E""'C' IC'Cl '" MWr Nc: s"' Geli d:s,s er, sli,,
po,,,,,
he nearest whole megawaii,'
o (9177i y
-f