Amend 14 to License NPF-12,changing Tech Specs to Delete Surveillance Requirement to Demonstrate Operability of Emergency Power Supply for Pressurizer Heaters by Manually Transferring Power
ML20069K930
Person / Time
Site: Summer 
Issue date: 04/19/1983
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20069K932 List:
References
NUDOCS 8304270337
Download: ML20069K930 (4)


Text

- r;f y

B SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Mendment No.14

^

License No. NPF-12 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Virgil C. Summer Nuclear Station, Unit No.1 (the facility) Facility Operating License No. NPF-12 filed by the South Carolica Electric & Gas Company acting for itself and South Carolina Public Service Authority (the licensees), dated October 8,1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the. health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this license amendment will not be inimical to the common-defense and security or to the health and safety of the public; E.

The issuance of this license amendment is in accordance with 10 CFR Part S1 of the Commission's regulations and all applicable requirements have ng been satisfied, o

n.

E5 2.

Accordingly, the license is hereby amended by page change to the Technical Spec-ifications as indicated in the attachments to this license amendment.

Paragraph o

2.C(2) of Facility Operating License No. NPF-12 is hereby amended to read as S

follows:

no oc h.o (2) Technical Specifications 01 4 W

O@

The Technical Specifications contained in Appendix A, as revised through m o.a.

Mendment No.14, are hereby incorporated into this license.

South ornce>

sunuur >

omy unc ronu m oo-co> nncu om OFFICIAL RECORD COPY usa m m - * =

w

, Carolina Electric & Gas Company shall operate the facility in accord-ance with the Technical Specifications and the Environmental Protection Pl an.

3.

This license amendrnent is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing

Enclosure:

Technical Specification Changes Date of Issuance:

April 19, 1983 4

ye.

d M

emcrp LA:DLQ.J.4... QL:LR.J.4..!

...0 ELDS.(df....

..D

. suamm > MDuhM.bmc.. JHanki.n.

.fL.h.e.s........EMe sm.......TN. ak..........

om, u.i.ke.a.......... u.na.a.............u.m.81.....$/ve.......4/$.83......

NRC FORM 318 (10-80) NRCM 0240 0FFIClAL RECORD COP?

usem ini-mwo

0 0

ATTACHMENT TO LICENSE AMENDMENT NO. 14 FACILITY OPERATING LICENSE NO. NPF-12 DOCKET NO. 50-395 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.

Amended Page 3/4 4-9 l

OFFICE )

suRuwe>

Gmap NRC FORM 310 00-80) NRCM Oao OFFICIAL. RECORD COPY usom mi-mm

. REACTOR COOLANT SYSTEM 3/4.4.3 PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.3 The pressurizer shall be OPERABLE with a water volume of less than or equal to 1288 cubic feet, (92% of indicated span) and at least two groups of pressurizer heaters each having a capacity of at least 125 kw.

APPLICABILITY: MODES 1, 2 and 3 ACTION:

a.

With one group of pressurizer heaters inoperable, restore at least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the reactor trip breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

o SURVEILLANCE REQUIREMENTS 4.4.3.1 The pressurizer water volume shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.3.2 The capacity of each of the above required groups of pressurizer heaters shall be verified by energizing the heaters and measuring circuit current at least once per 92 days.

l l

l SUMMER - UNIT 1 3/4 4-9 Amendment No. 14

.