ML20069K188

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1994 for North Anna Power Station,Units 1 & 2
ML20069K188
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/31/1994
From: Bowling M, Stall J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
94-348, NUDOCS 9406150301
Download: ML20069K188 (12)


Text

._

VilfulNIA t$IECTitlC AND l'OWEli COMi%NY M ICit M ON D, VIlf G INI A 2152 61 June 9, 1994 U. S. Nuclear Regulatory Commission Serial No.94-348 Attention: Doctiment Control Desk NL&P/GSS Washington, D.C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of May 1994.

Very truly yours, L

M. L Bowling, Manager Nuclear Licensing & Programs Enclosure cc:

U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station 940615o3o1 94o531 PDR ADOCK 05o00338

/g I

R PDR l

l

A VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:

May YEAR:

1994 4s i

Approved:

Mb,mStation Manager

OPEDATING DATA REPORT DOCKET No.:

50-338 DATE: June 1, 1994 CONTACT: J. A. Statt J

PHONE: (703) 894 2101 OPERATING STATUS i

1.

Unit Name!.....................

.korth Anna 1 2.

Repor t i ng Per i od........................May 1994 3.

L icens ed Therma l Power (MWt ) :.............

2,893 4.

Nameplate Rating (Gross MWe):..

994 5.

Design Electrical Rating (Net MWe):.......

907 6.

Maximum Dependable Capacity (Gross MWe):..

948 7.

Maximum Dependable capacity (Net MWe):....

900 8.

If changes occur in Capacity Ratings (Iteps No. 3 thru 7) since last report, give reasons:,_N/A 9.

Power levet to which restricted, if any (Net MWe): ___N/A 10, Reasons f or restrictions, if any:

N/A This Month Y-t-D Cunulative

11. Hours in Reporting Period................................

744.0 3,623.0 139,739.0

12. Nurber of Hours Reactor was Cri t ical.....................

744.0 3,623.0 104,028.7

13. Dec; tor Reserve Shutdown Hours...........................

0.0 0.0 6,826.8

14. Hours Generator 0n-Line..................................

744.0 3,623.0 101,063.9

15. Un i t R ese rve Shut down H ours..............................

0.0 0.0 0.0

16. Gross Therma l Energy Genera t ed (MWH ).................... 2,151,6D4.9 10,477,033.3 268.929,269.7
17. Gros s E l ec t r i ca l E nergy Genera t ed ( MVN )..........

710,805.0 3,456,975.0 88,372,332.0

18. N et E l ec t r i cal Energy Generat ed (MWH )....................

676,222.0 3,290,956.0 83,697,541.0

19. Unit Service Factor......................................

100.0%

100.0%

T2.3%

20. Un i t A va l i abi l i t y F ac t or................................

100.0%

100.0%

72.3%

21. Uni t capac i t y F ac t or ( us i ng MDC N e t ).....................

101.0%

100.9%

67.0%

22. Unit Capacity Factor (using DER Net).....................

100.2%

100.1%

66.0%

2 3. F orc ed Out age R a t e.......................................

0.0%

0.0%

10.4%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)__ Refueling, 09/09/94, 48 days
25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY f

CD' MERCI AL DPERATION A

i l

l l

l

)

J

i AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-338 Unit:

NA-1 Date:

June 1, 1994

Contact:

J.

A.

Stall Phone:

(_ 703) 894-2101 MONTH:

May 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 908 17 909 2

908 18 909 3

909 19 909 4

909 20 909 5

909 21 909 6

902 22 909 7

910 23 909 8

911 24 908 9

911 25 909 10 910 26 909 11 911 27 909 12 910 28 909 13 909 29 909 14 909 30 908 15 909 31 907 16 909 Instructions:

on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i

50RTH ANNA POWER STATZON UNIT NO.:

1 MONTH:

May

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a

summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data May 01, 1994 0000 Began month with unit at 100% power, 957 MWe.

May 06, 1994 1137 Commenced unit ramp-down for TVFT.

1241 Unit stable at approximately 90% power, 870 MWe for TVFT.

1340 TVFT completed satisfactorily.

Commenced unit ramp-up to 100% power.

1620 Unit stable at 100% power, 956 MWe, May 31, 1994 2400 Ended month with unit at 100% power, 953 MWe.

j l

I 1

Page 1

of d UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-338 Report Month May Unit Name:

NA-1 Year:

1994 Date: June 1.

1994

Contact:

J.

A.

Stall

  • No entry this month.

4 9

- - - - - - - - - - - - - - - - - - - - - - " ^ ^ ^ ^ ^

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO,:

50-338 UNIT NAME:

NA-1 t

DATE: June 1,

1994 i

REPORT MONTH: May 1994 CONTACT:

J.

A.

Stall PHONE: (703) 894-2101 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence OFo entry this month.

i L

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F-Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H-Same Source 1

t 1

OPERATING DATA REPORT DOCKET NO.

50-339 DATE: June 1, 1994 CONTACT:

J. A. Stall PHONE: (703) 894-2101 OPERA 11NG STATUS 1.

Unit Names..........

................ N o r t h A nna 2 2.

Repor t i ng Pe r i od :..................... Ma y 1994 3.

Licensed Thermal Power (MWt):............

2893 4.

Nameplate Rating (Gross MWe):..

979 5.

Design Electrical Rating (Net MWe):.......

907 6.

Maximum Dependable Capacity (Gross MWe):..

935 7.

Maximum Dependable Capacity (Net MWe):....

887 1

8.

If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report l

, give reasons: __N/A 9.

Power level to which restricted, if any (Net MWe):

___L*! A

10. Reasons for restrictions, if any:

N/A This Month Y-t D Cumulative

11. Hours in Reporting Period................................

744.0 3,623.0 118,007.0

12. Number of Hours Reactor was Critical.....................

744.0 3,597.2 97,970.8

13. Reactor Reserve Shutdown Hours.......

0.0 25.8 6,439.0

14. Hours Generator On-Line.............................

744.0 3,559.5 96,876.9

15. Unit Reserve shutdown Hours.........................
16. Cross thermal Energy Genera ted (MWM)........

0.0 0.0 0.0

.......... 2,151,926.1 10,141,712.6 262,367,370.3

17. Gr oss E l ec t r i cal Energy Genera t ed (MWH)..................

698,165.0 3,286,472.0 85,881,948.0

18. Net E l ec t ri ca l Energy Genera t ed (MWH)...................

663,628.0 3,125,299.0 82,175,000.0

19. Unit service factor,...........

)

20. Uni t A va i l ab i l i t y Fac t or.................................

100.0%

i 98.2%

B2.1%

21. Unit Capacity Factor (using MDC Net)....

100.0%

98.2%

82.1%

22. Uni t Capac i t y Fac tor (us ing DER Net )..................

100.6%

97.3%

77.3%

23. F orc ed Out ag e R a t e......................................

98.3%

}

95.1%

76.8%

0.0%

)

1.8%

5.3%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

_N/A

25. If Shutdown at end of Report Period, estimated time of Startup:
26. Units in fest Status (Prior to Commercial Operation):

N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

i AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit:

NA-2 Date:

June 1, 1994

Contact:

J. A.

Stall Phone:

(703) 894-2101 MONTH:

May 1994 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 893 17 893 2

893 18 892 3

893 19 892 4

893 20 892 5

893 21 893 6

893 22 892 7

893 23 891 8

894 24 891 9

893 25 891 1

10 892 26 891 11 893 27 885 12 893 28 891 13 892 29 891 14 892 30 891 15 892 31 890 16 892 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l i

NORTH ANNA POWER STATION UNIT NO.:

2 MONTH:

May

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a

summary of 4

operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data May 01, 1994 0000 Began month with unit at 100% power, 939 MWe, May 10, 1994 0833 Belt broke on bus duct cooling fan.

Commenced unit ramp-down.

0851 Unit stable at approximately 95%

power, 886 MWe after replacement of bus duct cooling fan belts.

0916 Commenced unit ramp-up to full power.

0950 Unit stable at 100% power, 934 MWe.

May 27, 1994 0917 Commenced unit ramp-down for TVFT.

0945 Unit stable at 91% power, 857 MWe for TVFT.

1020 TVFT completed satisfactorily.

1040 Commenced unit ramp-up to 100%

power.

1150 Unit stable at 100% power, 934 MWe.

May 31, 1994 2400 Ended month with unit at 100% power, 940 MWe, i

l

{

4 Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-339 Report Month May Unit Name:

NA-2 Year:

1994 Date: June 1, 1994

Contact:

J.

A.

Stall

  • No entry this month.

1 j

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-339 UNIT NAME:

NA-2 DATE: June 1, 1994 REPORT MONTH: May 1994 CGNTACT: J.

A.

Stall PHONE: (703) 894-2101 i

1 2

3 4

5 No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence ONo entry this month.

s 1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain)'

1= Manual Exhibit F - Instructions S= Scheduled-B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensea D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H_- Same Source

}

+

I I

,e i.--4e

-~r

..