Interim Deficiency Rept DER 82-51 Re Pullman-Kellogg Pipe Lining Failure in Essential Cooling Water Sys.Initially Reported on 820910.Condition Under Evaluation.Final Rept Expected by 821202
ML20069J962
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/08/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-21973-GHD, DER-82-51, NUDOCS 8210250326
Download: ML20069J962 (3)


Text

f Docket Nos. 50-528/529/530 50.55 (e), Report

, pre l-

c n N

GMJTWldl@ N RJ3DEC^@M N 3003 P.o.80> 21666 PHOENIX, ARIZONA 85036

STA, October 8, -1982 ANPP-21973-CHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1 Subj ect:

Interim Report - DER 82-51 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman-Kellogg Pipe Lining Failure In Unit 1 Essential Cooling Water System File: 82-019-026 D.4.33.2

Reference:

Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this inforcation will be finalized by December 2, 1982, at which time a complete report will be submitted.

l Very truly yours,

\\

CC\\

~

C-(. \\s Q LL

/\\ LLC '

E. E. Van Brunt, Jr.

I APS Vice President Nuclear Projects Management ANPP Project Director I

EEVBJr/GHD:db i'

Attachement cc:

See Attached Page 2 0

8210 age gas s 9

\\

9 U. S. Nuclear Regulatory Commission October 8, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-21973-GHD/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

Harmoa & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 i

e l

l i1 -.,.

F 1

.- e e

INTERIM REPORT - DER 82-51 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

I.

POTENTIAL PROBLEM During spray pond piping system placite lining repair, the crafts discovered delamination and peeling of placite lining in three 0

(3) 24-inch diameter 90 ells. Additional inspections indicated that interior placite lining of spool numbers 1-SP-030-S-042, ISP-030-S-043 and 1-SP-068-S-042 has delaminated from the sub-strate.

This condition may impact the Essential Cooling Water and Diesel Generator Systems.

The piping material is supplied by Pullman Kellogg Power Products.

II.

APPROACH TO AND STATUS OF PROPOSED RESOLUTION The condition is currently being evaluated by the supplier and Bechtel's Material and Quality Services group.

III. PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE FINAL REPORT Evaluation of this condition and submittal of the Fiani Report if forecast to be completed by December 2,1982.