ML20069J436
ML20069J436 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 02/24/1983 |
From: | Joshua Wilson VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML18139C313 | List: |
References | |
PROC-830224-01, NUDOCS 8304220313 | |
Download: ML20069J436 (64) | |
Text
- . -- -
i s 1 l
l
~
. . e%,
t
. + i.
l
, REVISIONS TO SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed are recently revised pages to the Surry Power Station Emergency Plan Implementing Procedures. Please take the following actions in order to keep our manual period updated with the most recent revisions.
EPIP 1.01 - Emergency Manager Controlling Procedure Remove arid Destroy Enter Pages 1, 4, and 5 of 8 Pages 1, 4, and 5 of 8 EPIP 2.03 Reports to Offsite Agencies, Remove and Destroy Enter Pages 1, 7, and 8 of 8 Pages 1, 7, and 8 of 8 EPIP 3.01 Callout of Emergency Resnonse Personnel Remove and Destroy Enter Page 1 of 3, and Page 1 of 3, and Attachment 1 pages 1 Attachment 1, pages 1, 2, and 3 of 6 2, and 3 of 6 NPIP3.Di' Activation of Technical Support Center
- E Remove and Destroy Enter Page 1 of 8, and Page 1 of 8, and Attachment 3, page 1 of 3 Attachment 3, page-1 of 3 EPIP 4.02 Radiation Protection Supervisor Controlling Procedure Remove and Destroy Enter Pages 1, 8, and 10 of 16 Pages 1, 8, and 10 of 16 EPIP 4.12 Offsite Environmental Monitoring Instructions Remove and Destroy Enter Pages 1, 6, and 7 of 7 Pages 1, 6, and 7 of 7 0 ' ~~
830422'02 3'83d415 PDR ADOCK 05000280 PDR _ _
_ ._.._..,._.7.,
ee r 'r- -
v i I
.c
_2_ l
. i .
l EPIP 4.15 Onsite Monitoring I
Remove and Destroy Enter
'Pages 1, 3, 4, 5, 7 Pages 1, 3, 4', 5, 7 l
- - and 8 of 9, and and 8 of 9, and Attachment 2, Attachment 2 page 1 of 1 page 1 of 1 and Attachment 3 page 1 of 1 EPIP 4.16 Offsite Monitoring j
Remove and Destroy Enter i
4 Pages 1, 2, 3, 4, 7 Pages 1, 2, 3, 4, 7, 8, and
-l 8, and 9 of 11 9 of 11, and Attachment 4, page 1 of 1 EPIP 4.18 Monitoring of EOF Remove and Destroy Enter Pages 1, 4, 5, 6, 7 Pages 1, 4, 5, 6, 7, and and 8 of 8 8 of 8, and Attachment 3, page 1 of 1, and Attachment 4 4
page 1 of 1 EIPP 4.19 Use of Radios for Health Physics Monitoring Remove and Destroy Enter Pages 1 and 2 of 5 Pages 1 and 2 of 5 EPIP 4.20 Health Physics Actions for Transport of Contaminated injured Personnel
~
-*IemoveandDestroy Enter Pages 1, 6, and 7 of 7 Pages 1, 6, and 7 of 7 EPIP 4.21 Evacuation and Remote Assembly Area Monitoring l Remove and Destroy Enter Pages 1 and 4 of 9 Pages 1 and 4 of 9 EPIP 4.22 Post Accident Sampling of Containment Air Remove and Destroy Enter Pages 1 and 10 of 10 Pages 1 and 10 of 10
~ e
- W"" * ~ * * ' ' " " " #
,-m..~ -- *mme o p as. s e ew + -ww+er=*a'* M*- - - - ""W"'*******"*N***W"*'"" ^ ' "' ' "P e
- - - - - - - ~
6 --
T f
- o. .
~
. . s<
EPIP 4.23 Post Accident Sampling of Reactor Coolant ,
Remove and Destroy Enter Pages 1, 13, and 14 of 14 Pages 1, 13, 14 of 14 EPIP 5.03- Persennel Accountability Remove and Destroy Enter i i
Pages 1 2, and 6 of 7 Pages 1, 2, and 6 of 7 EPIP 5.05 Site Evacuation ,
R,emove and Destroy Enter Pages 1 and 3 of 5 ,
Pages 1 and 3 of 5 EPIP 5.07 Administration of Radioprotective Drugs Remove and Destroy Enter Pages 1 and 2 of 4 Pages 1 and 7. of 4
=>.*,.,
. j. ,
b 7
_ _ _ . . . . , . . . - . . - ~ . ,_ - - - - ~ ~ ~ - ~ ~ - ~ ~ ~ - -- .--~y~~.-e>e - -
" ~
e ,
No.9784733e
, , . e. VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE O NUMgEn PROCEDURE TITLE REVIS10N i
ni PACE l EPIP-1.01 EMERGENCY MANAGER CONTROLLING PROCEDURE
'r *
(With 1 Attachment) 1 nf A j PURPOSE I
i
) -
To initially assess a potential emergency condition and initiate corrective actions.
USER
. Shift Supervisor or Station Emergency Manager e
ENTRYCON0lil0NS O int one of the fotto ins :
.. , . . . , . - - . .t ..Another..s.tationa rocedura direc.ts initiation of this procedure 0,,R_
i
- . .. . - 2.. A-.. potential emergency - condition is reported to the Shift Supervisor, i
j REVISION RECORO REY. 00 PAGE(S): ENTIRE PROCEDURE DATE:06-29-82 REY. 01 PAGE(S): 1 of 8 and 5 of 8 DATE:11-18-82 REV. 02 PAGE(S): 1 of 8 and 5 of 8 DATE:02-03-83 REV 03 PAGE(S): 1 of 8. 4 of 8, and 5 of 8 DATEFEB 2 ( 1933 REY. PAGE(S): DATE:
REY. PAGE(S): DATE:
REV. PAGE(S): DATE:
APPROVED DATE APPRO OMMEN0E
'P)
O _m a . } }$
- WAIRMANSTA TION NUCLEAR SAFETY AND CPERATING COMMITTEE ,
_ .l l
_ _.__. 1.. _ .. _ . - _ -___ _._ _ _. _ . . _ . . _ _ _ _ _ _ . _ _ _ _ _ ._ _ _
us sn.snio .
NUMBER PROCEDURE TITLE. REv'ISION 03 C' EPIP-1.01 , EMERGENCY MANAGER CONTROLLING PROCEDURE PAGE 4 of 8
- STEP ACTION / EXPECTED RESPONSE RESPONSENOT OBTAINED
- -----CAUTIONr-Declaration of the-highest emergency class- fer which an EAL is exceeded shall be made. .
. _ . ... L_ AR9ERSMENT_AND. CLASSIFICATION:
a) Refer to EPIP 1.01, Attachment
- 1. Emergency Action Levels, Index
{sj 1) Using index, determine event category AND GO TO proper
._. . ...EAL tab AND
- 2) Evaluate event, deter-mine classification, AND Go TO Step 4 of this procedure .
- 4. NOTIFICATION AND VERIFICATION:
a) TSC - NOT ACTIVATED a) E TSC activated, CO TO Step 6.
b) Notify Operations Personnel
- 1) Superintendent of Operations ,
G. Karte Attempt contact via beeper (9-1-484-8322) 83 or 9-1-(629-7761)
(9-1-484-3043)
.J T N
. _ . . . . w .. - - - m . e,- e . .-e . .u. e.
w-yh -- g ---
i
- I
- 1 Peo. 9786 T120
=. .
NUMBER PROCEDURE TITLE ,
REVISION 03 O
EPIP-1.01 EMERGENCY MANAGER CONTROLLING PROCEDURE PAGE 5 of 8
- STE? ACTION / EXPECTED RESPONSE BESPONSENOTOBTAINED t __ _ ._.
. - 2) SRO-On-Call . . . . _ . ..
R. Johnson Attemot contact via beeper
. . ~ . - _ . . . ,1 - ,
_OR
___.I _Peterson.._ .___..,... ._,. Attempt contact. via beeper I \
'c) Verify classification .
d) . E required by Alert, Site Emergency or General Emergency,
. {'... ._____..u.....~
. rer itest_initiationmoE, Standing Order 21
. ., _ .. .. NOTE . . Return. to Stap 2. of-this. instruction as necessary during the course of the. situation for additional events and reclassification.
. 5. .. . VERIFY EALS EXCEEDED:
a) Assure EALs- - EXCEEDED -
'- a) _IF EAI.s NOT exceeded.
DO NOT declare an emergency classification.
AND
- 1) Continue appropriate corrective action IAW procedures.
- 2) GO To Step _7, of this procedure.
O.., -
l I
i l _ .
l l
- 4
- Poe. 978873 M
. . VIRIINIA ELECTRIC A.MO POWER COMPANY SURRY POWlER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE C NUMBER PROCEDURE TITLE ,
REVISION 01 EPIP-2.03 REPORTS TO OFFSITE AGENCIES PAGE (With No Attachments) 1 of 8 PURPOSE l
- 1. To ensure that reports to various agencies, which may be required because of the nature of the emergency, are made in a timely manner.
USER
. -. - . .. - Fmergency.. Admin 4 =tratiste. Director O_R Station Emergency Manager.
ENTRY CONDITIONS h 1. An emergency has be' declared; o_a
- 2. Entry is directed by another EPIP.
REVIS10N REC 9RO REY. 00 PAGE(S): Eatire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1 of 8, 7 of 8, and 8 of 8 DATE:FE8 2 4 19g3 REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
AWROVAL OMMENDE APPROVE 0 QA TE
(
+ a, -
,;fff y), _ -
VA!3MANSTA TION NUCLEAR SAFETY FEs t 4 m AND 0!ERATINO COMMITTEE
" " * * " ' *- *- . * , , ~ , - ~ ,.#, ~
^
No. 97987$10 .
NUMBER PROCEDURE TITLE REVISION
~
q 01 EPIP-2.03 REPORTS TO OFFSITE AGENCIES PAGE 7 of 8 -
- l. ,
a .. , . .
- STEP ACTION / EXPECTED RTSPONSE
' RESPONSEN0TOBTAINED I
NOTE: 10 CFR 20.402,10 CFR 20.403, and the Technical Specifications require written followup reports to be submitted. Measures ;
- should be taken to ensure these reports are prepared and ;.
submitted.
' - ** -194 - NOTIFY VEPCO INSURANCE, DEPT.: ,
a) Call the VEPCO Insurance Dept. during business hours ~
at: .
b) Call the VEPCO Insurance Dept.
during non-business hours at:
~
. _. 20. , _ VERIFY EMERGENCY STATUS:. . , _ , ,
a) Emergency - NOT TER- a) IF, emergency terminated.
. ....u.a.._ MINATED . ..,....... .,. .GO TO. Step 22,
- 21. MONITOR NOTIFICATION EVENTS:
a) IF, release of radioactive a) IF NOT, continue to monitor-materials - OCCURS until emergency terminated.
THEN GO TO Step M.
+ pR Release of radioactive materials - INCREASES S.R Release of radioactive t materials - IS PROJECTED -
J a .
o i
-) .
eve.sre.s mo NUMBER PROCEDURE TITLE REVISl0N I .
01 Q EPIP-2.03 REPORTS TO OFFSITE AGENCIES PAGE
{ 8 of 8
.t 1 . ___
) - STEP ACTION / EXPECTED RESPONSE RESPONSENOTQBTAINED
- 21. (CONTINUED)
I. ,
l OR
.I Overexposures - OCCUR l E j Overexposures - ARE i LIKELY 2R.
Loss or theft of licensed material - OCCURS OR
,a
) Event listed in Specifi-cation 6.6.2.a of Tech.
6 ... m .. Specs. - OCCURS CO TO Step 2
- 22. NOTIFY VEPCO Insurance Dept.
OF TERMINATION:
a) Notify VEPCO Insurance Dept. of emergency termination
- b) Use telephone number '
listed in Step H
- 23. TERMINATE EPIP-2.03:
a) Completed By:
Time:
Date:
b) Forward procedure to SNSOC for review
(
. , . ~ . . . - - - m, _ _ _ _ . . . - . = - , - - - - , . - - * ...-r .- . -. -.~.-,+.- -,- . ..... .
l Poe. 9784*234 l ,
. VITJNIA ELECTRIC AND POWER COMPANY l SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE G
q~~, - . .
NUNDER PROCEDURE TITLE REVISION 03 EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL PAGE !
(With 1 Attachment) 1 of 3 PURPOSE
. -- -- 1,--To callout -station- AND-corporate emergency response personnel if they are not already at"their normal work locations.
USER
_. . , . . - Security _Tean_ Leader _0R Station. Emergency Manager ,
ENTRYCONDITIONS
( :. r- hr : Initiation. directed by the Station Emergency Manager.
REVISION RECORD REV. 00 PAGE(S): Entire. Procedure DATE: 07-29-82 REV. 01 PAGE(S): Page 1 of 3 & Att. 1. Page 3 of 6, 4 of 6 DATE: 10-07-82 REV. 02 PAGE(S): Page 1 of 3 and Attachment 1, Page 2 of e DATE: 02-03-83 REV. 03 PAGE(S': 1 of 3 & Att.1 Pg. 1 of 6, 2 of 6, 3 of 6 DATE: FE8 2 41933 REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
~
- APPROVAL R MMEND APPROVED DA TE
> 0
. . . _ . p a= vy -
Qfl.wb_ . ,,,
fCVAIRMANSTA v AND CPERATING COMMITTEE TION NUCLEAR SAFETY
.q Ae-e = 1 rey..gp- emw F=.m 4~ -e+ -* =w- 9m,aagu-c - +nu e+-.,m e g 9 g , , ,, ,
rse.sveerps
- NUMBER A TTACHMENT TITLE REVl510N a EPIP-3.01 03 s- EMERGENCY PERSONNEL NOTIFICATION LIST A TTACHMENT PAGE 1
- - 1 of 6 i
i 1.- INSTRUCTIONS TO' SECURITY: Use all available security personnel and
- - - telephone- lines- to make the following notifications as rapidly as
- m. --
. .. .. .. .-... possil>1e .--Notify,-in ordety-the- individuals listed below until at -
.. _ ....-._.--least ine-ind1Yidurrl-tu iac!r department-- har been notifled. When - - - -
. .. ... . aach individual..is reached,e transmit.the. message indicated for that
. . ... .... . --_.-department ,- verify- the- message- has been understood, and then move to the next department. .
- 2. GENERAL OFFICE SECURITY (Richmond)
.. . . . . _ __.. -MESSA M- "This..is.Je t u ri ty. at. Surry. Eower . S ta t ion. An emergency
.-- - has been declared a : Surry Power Station. Commence
- : the callout of the Corporate Emergency Response Team in
- .s accordance.with the Corporate Emergency Response Plan."
~~'
p ~J NAME - - -
EXT. TELEPHONE NUMBER
. . . _ . - ._... _ ._.Gener.al.Dffice Security.. s..
- 3. STATION MANAGEMENT MESSAGE: "This is Security at Surry Power Station. This message is to inform you that an emergency has been declared at the station."
NAME EXT. ' TELEPHONE NUMBER J. L. Wilson Beeper R. P. Saunders i
! Beeper G. E. Kane -- -
p.
\. / .. . . Beeper e
.Me.e.m. .Msm ? N .m WP.* # **t- **E M- e'L*. . . p
- e e
Noe978SN20 NUMBER . A TTACHMENT TITLE REVISION 03 O EPIP-3.01 ATTACHMENT EMERGENCT PERSONNEL NOTIFICATION LISI PAGE 1 2 of 6
.4.. HEALTH PHYSICS DEPARTMENT
,.- MESSAGE: SThir ir Secut ity ae-Surry #ower 3tation. An emergency - -
- - - - -- - -- - - . has-been-declared.- Commence -cal-int of emergency - -- - -
! .. . _ . . _.. response personneLin .your. department in accordance with
-- -- --~~~----your -departmental emergency. notification. list. .
l I
NAME EXT. . TELEPHONE NUMBER S. P. Sarver [
- - - - ,. . --P. P. Nottingham ,
[ '
- Barry Carber I
_1 .. I Dean Densmore ? .*' 2 7, . __ ['
o
...;.. 5- - TTCHNICAL. SERVICES.. DEPARTMENT e
t ,
Messager "This -iv Security at-Surry Power Statica. An emergency
- has been declared. . Coc:mence callout of emargency response
. - .. .. peraonneLin..your. department. in accordance with your
. .. departmental emergency notification list."
NAME EXT. TELEPHONE NUMBER _
. D. A. Christian Deeper
- I, sugene Grecheck '{
-- Douglas Rickeard - .
, 4
~
Larry Curfman ,
John Hochutz ,
I George Pitonyak i 4 I .
Rick Bailey
. . Tom Swindell
- Larry Miller -
-+a .....e . * **
- s e
. e... o r s siho .
NUMBER -.. . . . ..-- A TTACHMENT TITLE . REVISION EPIP-3.01 03
' ]'
' EMERGENCY PERSONNEL NOTIFICATION LIST ATTACHMENT PAGE
~
L 3 of 6
- 6. MAINTENANCE DEPARTMENT
~ - ~ -
- MESSAGE '-'%is is Sedutity~at Surry Power Station. An emargency * *
. . . . _ . .. ...--.has- been. declared,--Commence callcut of emergency response --
. .- . . . - - . . . . , . _~.- personnel-in your department-in accordance with your - -
departmental emergency notification list." .
, . _ . . . , NAME , . . . . .. _ _ EXT.. .. . TELEPHONE NUMBER
- - H. W. .Kibler
.- Jerry Olin
. t .- .. .. . sc.rer .racJohrt Paerick .. .c =
" Dick Mudd .
/
?
!, . . . -7. .--. SECURITY DEPARTMENT MESSAGE: "This is Security at Surry Power Station. This message'is to inform you that an emergency has been declared at the station."
~
'NAME ,E_XT . TELEPHONE NUMBER i
- l Otto Wegman g
\
H. J. Van Dyke j W. D. Sweaney O -
1 l
l
. .i 5..
g . --<*+,M.-* em h g,*-- sw' *.h *** es g
_q gw , e e
a, s- -
- e No.978873'30 %
4
- ., VIR" INIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE PROCEDURE MTLE REVIS10N
$. ~ MUNDER ,
[ 02 l ,
EPIP-3.02 ACTIVATION OF TECHNICAL SUPPORT CENTER PAGE (With'10 Attachments) 1 of 8 ,_
ll j PURPOSE ,
i
- 1. To prcvide guidance to personnel charged with TSC Activation.
- 2. To provide guidance to TSC members.
i l %
j s >
l USER Emergency Administrative Director R Available TSC Personnel I. "~~
ENTRYCON0lHCNS .
f i
i
- 1. Declaration of Alert, Site Emergency or General Emergency; AND
) .
- 2. Entry from another EPIP; 0,,R,
- 3. Direction of Station Emergency Manager.
t REVISIUM RECORD
, REV. 00 PAGE(S): Entirs Procedure DATE: 07-29-82 REV. 01 PAGE(S): Page 1 of.8, and 2 of 8 DATE: 10-07-82 REY. 02 PAGE(S): Page 1 of 8. Attachment 3 Page 1 of 3 DATE: FEB 2 41983 REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REY. PAGE(S): DATE:
AWROVE0 DATE
-) M9ROVAL QMMEN f1 ,
n) *
' HAIRMANSTAn0N NUCLEAR SAFETY FEB 3 41gl -
AND QPERAnNG COMMITTEE 4..-ema - q-+ ee w y- + g -.w .g . , , , .% _y,
.+e4meMwe .me e a ewse--= % -c-e=c e ee egipe e m.m 3 _.%w m ,g u% . . .
g .
s' .
Peo. 97887220 NUMBER A TTACMMENTTITLE REVIS10N EMERGENCY OPERATIONS DIRECTOR GUIDELINE ATTACHMENT PAGE 3 1 of 3 l STEP
- ACTION /EXPEC'IED RESPONSE
- RESPONSE NOT OBTAINED l'. INITIATE EPIP-3.02, ATTACHMENT 3:
, a)_, BY: _
DATE:
TIME:
- 2. COMMUNICATIONS:
a) Obtain operator from. Emergency a) Obtain Nuc.. Training Coord-Switchgear Room inator from Administrative Director
(.) b) Establish communications -
b) Establish communications to
. . ___. _ _.f roa.ISC. to.. Main. Control .. .... ... . .. Control Room .v.ia available Room via Ringdown Phoce means .
c) Update Station Emergency Manager in a timely manner d) Insure status boards maintained
- 3. VERIFY: .
a) E required, obtain opera-tional status from Control Room personnel
- 4. SUPPORT:
i a) Verify availability of opera- .
tions personnel in Emer/SG Room b) As required, request addi-tional personnel to support ,
operational activities (j c) As required, request material
_ _ _ .and equipment via Emergency
- Administrative Director
.m w Ww _q eN#6 y ee m +W N _, _>a g mp a,p g. ,, e***'"S'
.gi 5% -
=eh 9 ***Di& e4% Am.g + w
, = .
m..hmd *
. VIRTINIA ELECTRIC AND POWER COMPANY SURMY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE A.....
^'
PROCEDURE TITLE REVISION NUMMR 02 EPIP-4.02 " ~ RADIATION PROTECTION SUPEaVISOR PAGE CONTROLLING PROCEDURE
- - - ---- - -- (With No Attachments) 1 of 16 PURPOSE
.w -a To-assist -Radiological > Assessment- Director in establishment of radiation
- 2. -__ prui= diva pressom.ausius aramergency and dispatching monitoring teams.
4 USER
. _ - , A==4a m t_Eealeh Physics Supervisor Real.th.Physicisc or Health Physics. . _ .
Technician.
ENTRYCONDITIONS .
___..'..l.. ,_ Any.one'of the following :
- 1. Emergency classification of ALFRT..
. .. . 2. Activation.by,another EPIP. .
- 3. .._Any other time the' Radiological. Assessment. Director deems it necessary.
, REVISIONREC051 REY 00 .PAGE(S): Entire Procedure DATE:07-29-82 REY. 01 PAGE(S): 1.3.4,5,7,8,10,11,12,13,14 and 15 DATE:11-04-82 REV. 02 PAGE(S): 1, 8, 10 DATE: FEB 2 41983 REV. PAGE(S): DATE:
REV. 7 AGE (S): DATE:
REV. PAGE(:): DATE:
REV. PAGE(S): DATE:
AFV50VE0 CA YE APPROVAL RECOMMENDED
~
' ~
/' / K#A HAIRMANSTA MON NUCLEAR SAFETY AND QPERATING COMMITTEE
_ - - - - . __ .____._a . _ _ _ _ _ _ _
l
. f43. 97847210
- NUMBER PROCEDURE TITLE REVISION l EPIP-4.02 02 RADIATION PROTECTION SUPERVISOR
! CONTROLLING PROCEDURE '
8 of 16
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED e
. NOTE: Offsite Monitoring Team (s).should be dispatched upon <
-- classification-of SITE-or GENERAL emergency, as specified
-~ by-the Radiological-Assessment' Director. _
-- - +.- --- ACTIVATE OFF. CITE MONITORING:
a) Review with Radiological Assessment Director:
.. . . . . ., . .. .. _ 1).Need for offsite moni- ... .... . 1) IF offsite. monitoring e -
toring teams NOT required, GO TO Step 10.
. .: : .2) Initial location and number of offsite teams
. .. . reqeired s'
- 3) Assessment of offsite -
, _.. . .e. ::.;r. cradiological hazards b) Assign EPIP-4.16, Offsite Monitoring c). Select 2 individuals per team:
- 1) Only i need be a H.P.
.. technician d)- Assist in obtaining a vehicle
- - . - 1) Health Physics cruck #3088
- 2) Health Physics truck #1449
._. 3) Station Management vehicle #1155
- 4) Station Vehicle #1150
- 5) Station Vehicle #1151 NOTE: Keys to above vehicles except 1155 are located in key locker in H.P. Supervisor's Office.
s s .. .
, ND. 97887210 NUMER PROCEDURE TITLE REVISION
,p EPIP-4.02 02 RADIATION PROTECTION SUPERVISOR -
CONTROLLING PROCEDURE 10 of 16 l
.a
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
.. .10._ _(CONTINUED)
- - - ----- ---3)-Increase- in emergency
.. classification l l
- 4) Change in plume direction l I
c) Assign:
,. __._. _ . . 1L.EEIP.-4 17,. Monitoring of OSC and TSC ,
I i AND l
. . . . . . _. - _ __ :2). EP.IR-4 18,lionitoring of
( . EOF
. s ....u.. .dh.,Infnea Radinlogical- Assess-
. . .. ment. Director as to the < -
habitability of emergency response centers
. 11. . CONTAMINATED PERSONNEL:
a) E station personnel found a) E no station personnel
.__ __. contaminated: .. found contaminated, GO TO Step 13.
- 1) Assign EPIP-4.06,-Personnel Monitoring and Decontamination AND-
- 2) Report results to Radiological Assessment Director b) Determine area contamination b) E time or dose rate levels e levels,-if time and dose rate do not permit survey, levels permit consider access control of the area until cleaned NOTE: IF injury is life threatening
. .. .GO TO Step H.
S
too. e784723Cf VIRilNIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PRC'CEDURE NUMMR PROCEDURE TITLE REVISION
- 01 EPIP-4.12 0FFSITE ENVIRONMENTAL MONITORING PAGE INSTRUCTIONS (With 2 Attachments) 1 of 7 PURPOSE
. --. Provide. guidance to the Dose. Assessment Team to direct Offsite Monitoring Teams to: -
- 1) Confirm r.diological release j
.2) Track release l
- 3) Determine radiological composition of release USER Dose Assessment Team Members.
ENTRYCON0lTIONS Any one of the following:
L__.Releasa. .of._ radioactive __ materials . with a SITE or GENERAL emergency condition and EOF is NOT activated. 1
- 2. Any other time which the Radiological Assessment Director deems it l necessary. !
- 3. Activation by another EPIP.
PEVISION RECORO REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REY. 01 PAGE(S): Page 1, 6, and 7 DATE: FEB 2 41983 REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
APPROVAL MECOMMENCEO APPROVE 0 DA TE
/
.$ ~
AIRMANSTAT10M NUCl.EARSAFETY m , < .,
ANO QPERATING COMMITTEE 4
-=_e -
A i
- ,, e o
4 s a 950.97847210 1 .
i NUMBER PROCEDURE TITLE REVISION 01 1 EPIP-4.12 0FFSITE ENVIRONMENTAL
- 88 MONITORING INSTRUCTION '
)
l 6 of 7 L
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED 1
- 8. (CONTINUED)
}
b) E unexpected reading occurs:
4 i ~ -- --- -1) Have team -travel- downwind j a distance until plume is i located l
i a
.. .. . .. 9. , ....EIXED ENVIRONMENTAL SAMPLERS 4 AND TLD'S:
i a) Fixed air samplers and TLD's
- provide good information on
. . the TOTAL release.
l
(-
Collection of these samples may provide best information
--- - cher termination of release I
j 10. ADDITIONAL SAMPLING:
4 a) Additional sampling for chronic exposure pathways is not normally within the scope of initial response
- b) Upon recovery phase of emergency, direct teams to obtain, as appropriate
4
- 1) Milk .
- 2) Water
- 3) Crop samples l
I i
I - -
i
l , N8. 978672:0 NUMBER PHOCEDURE TITLE REVISION 01 b' EPIP-4.12 0FFSITE ENVIRONMENTAL
- 68 i MONITORING INSTRUCTION 7 of 7 i
(
-+ -
] . . . . . . . .
l - STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED 4
- 11. . CONTINUE MONITORING:
4
]
a) Continue Steps 7 thru 12 j until:
l _ _
. . ...... . }.) EOF MANNED , GO -TO Step .2-OR
- 2) Release TERMINATED, GO TO
, ._ .. . .. Step M
, OR l 3) IF monitoring data-becomes j
... ..____ . ._availabla, CO.TO. Step M.
4
- 12. ASSESS DATA:
i a) IF monitoring data becomes
- availab],e
q
- 1) Initiate EPIP-4.13, Offsite i Release Assessment with Environmental Data j t j 13. TERMINATE EPIP-4.12:
I a) COMPIE'TD BY:
1 DATE:
- TIME
) .
i I ,
j 1 N
v 1
I i
. . 1 i
- m. usenso' VIREINIA ELECTRIC AND POWER COMPANY SURRY POWER STATlON EMERGENCY PLAN IMPLEMENTING PROCEDURE NUNRER pR0CEDURE TITLE REVISION 01 EPIP-4.15 ONSITE MONITORING - PACE (With 3 Attachments) 1 of 9 PURPOSE Confirm initial offsite releases and provide surveys for personnel pro-tection program onsite.
USER Onsite Monitoring Team Member ENTRYCONDIRONS
( Any one of the following conditions.
- 1. ALERT. SITE or GENERAL emergency. j
- 2. Activation by another EPIP.
l l
REVIS10N RECORO REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1, 3, 4, 5, 7, 8. Act. 2 p.1, Att. 3 p.1 DATE: FEB 2 4 ag3 REV. PAGE(S): DATE:
REY. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
APPROVAL RECOMMENDED APPROVED DA TE
, 5tv% FEB 2 4 MS
) .
[NAiR-SrAn0NNUCiuRu,ErV AND OPERA TING COMMITTEE e .
g-ee aMe * * -
M.- p e- em ' me me g6 e. wwe.e=* -h h h6hpwee emmse % e e -we w - --qm , wmi.a. . w-.
e ND.97887210 NUMBER PROCEDURE TITLE REVISION 01 !
EPIP-4.15 ONSITE MONITORING PAGE l
3 o'f 9 l l - STEP ACTION / EXPECTED RESPONSE RESF9NSENOT08TAINED l
i l ~ NOTE: Emergency kits should be used for offsite monitoring. Obtain
! equipment for surveys from normal station supplies.
l
! 4. OBTAIN MONITORING / SAMPLING EQUIPMEh7:
a) Obtain the following equip- a) Portable survey equipment may l ment, as necessary, from the also be obtained from H.P.
Health Physics Office: instrument repair shop.
- 1) Portable survsy meter
.I
(=4n4=i= range of
- 0-1000 mr/hr) g 2) Battery powered air 2) Continae with this sampler, IF_ F air sampling instruction is required
- 3) RM-14, with H.P. 210 probe 3) Coatinue with this E analysis of samples are instruction required in field .
- 4) Poly bags for soil sample, 4) Continue with this plastic. bottles for liquid instruction samples, gas chambers E gas sample is required and smears E swipes are to be taken I b) Perform operability check as appropriate:
- 1) Battery check
- 2) Current calibration sticker
- 3) Source check (if available)
=ed' l
l l
l
_. _ _ . . . . - -. 1, ND.97887210
~
NUMBER PROCEOURE TITI.E REVISION 01 EPIP-4.15 ONSITE MONITORING PAGE 4 of 9
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
- 5. INITIAL CONFIRMATION OF OFFSITE RELEASES:
a) IF, F team activated for ini-tial confirmation and assess-ment:
- 1) Proceed to location specified in Step 2
- 2) Use suggested protective clothing and respiratory gear b) Obtain dose rate:
- 1) Use portable survey meter with beta window closed
- 2) Transverse plume in cross- l wind direction
- 3) Determine maximum dose rate (mR/hr)
- 4) Record mR/hr, time and location on Attachment 2 c) Place particulate filter and silver zeolite cartridge in air sampler d) Obtain air sample:
- 1) Turn on sampler at location of maximum dose rate determined in Step 5.b
- 2) Obtain an approximate 10,ft 8 air sample f
' ~
e- *
.w4 m e- e @ +p- -6 4 e 4e u *W D
2 . . . _ _ _ _ . . _ _ _. . - _ - _ . -
s s
- N3.97887210 a
NUM2ER PROCEDURE TITLE REVISION i 01 j EPIP-4.15 ONSITE MONITORING PAGE
$ 5 of 9 i '
i - STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED i
- 5. (CONTINUED) l 3) Obtain gas sample - open top of chamber, waving chamber within plume and closing chambers l '
- 4) Relocate out of plume while
- sampler is running i
- 5) After sampling is complete, i turn off air sampler and disconnect cables
' 6) Log sample volume on Attachment 2 i^
e) Obtain a soil sample
{
f 1) Take approximately 1/4 to 1/2 inch of soil from 1_
square foot area
- 2) Place sample in a poly bag -
I f) Return samples and complete .
j the survey g) E sanales are LESS THAN g) E samples are GREATElt THAN 10 mR/hr: 10 mR/hr:
4 l 1) Return sample to the 1) Return sample to hot lab count room'in a clean plastic bag AND
- 2) Initiate EPIP-4.26, M i Level Activity Samele l
) A_nalysis. !
- 6. FOLLOW-DP MONITORING:
I a) Obtain a portable radio a) E portable radio is not prior to departure available:
a i 1 l
9
. . . . _ . . . - ... -. . . - - - ~
y - -- -.
Noss7sa722o NUMBER PROCEDURE TITLE REVISION 01
! EPIP-4.15 ONSITE MONITORING PAGE 7 of 9 I
- - STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
- 6. (CONTINUED) g) E requested, obtain soil g) E soil sample NOT requested, sample as per Step 5.f GO TO Step 6.h.
- 1) Return to Step 6.h h) E direction of plume toward site guard towers:
- 1) Monitor habitability of the area surrounding the tower AND
( 2) Report results g) Remain in the field, con- g) E no radio was available tacting the Radiation Pro- OR_ IF radio malfunctions:
teccion Supervisor as to changes in direction of the 1) Return results of surveys plume and other specified to Radiation Protection monitoring data Supervisor
- 1) Follow good ALARA prac-tices while monitoring the plume
- 7. FIELD ANALYSIS OF AIR SAMPLES:
a) E field analysis of air a) E sample analysis is NOT sample required: required in the field, GO TO Step 8_.
- 1) Proceed to a low back-ground area
, b) Turn on RM-14 (frisker)
- 1) Obtain a background count rate (cpa) 1 F
e Ns.97847210
- NUMBER PROCEDURE TITLE REVISION 7.
01
( EPIP-4.15 ONSITE MONITORING
. PAGE 8 of 9
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
- 7. (CONTINUED)
- 2) Log on Attachment 2 c) Hold silver zeolite cart-ridge one-quarter inch from the detector with influent side of cartridge facing the detector i
j d) Observe gross count rate and j log on Attachment 2 e) Subtract background count rate from gross count rate to obtain net count race i . f) Determine from Attachment 3, the conversion factor for
! specific sample volume f
g) Determine I-131 activity:
NET (cpm) x conversion factor =
ACTIVITY (uC1/ml) h) Log an Attachment 2 AND a.
sample:
- 1) Date j
- 2) Time
- 3) Location
- 4) Activity .
- 1) Return samples, as time allows, to count room
- 8. REPEAT SURVU S:
a) Return to Step 6,and perferm a) IJ, emergency terminates or
, repetition ot sampling and/ E team is requested to
(! or surveys as required by the return, GO TO S,tep 9.
Radiation Protectiop Supervisor
. .....,m.m... . .. ---.- -. - - - . - . *. -- = . ~ = - + = = = = * * - * * = ~ ~ - - - +
. 4
4, ,
No.97887220'
' NUMBER ATTACHMENT TITLE REVISION i j EPIP-4.15 01 i SURVEY DATA SHEET
- A TTACHMENT PAGE
- 2 1 of 1 i
i i BKG NET I-131
! DATE TIME LOCATION mR/hr GROSS CPM CPM CPM VOL ACTIVITY (uCi/ml)
(
9!
i J
j i I.
4
-=
+
9 4
l lr i
i 4
l l
l l
6 i
I I .
.. . . . - . - - . - . . . - . ---.. - . - ~ - - - - .- - - -
Pea,97847200 '
NUMBER A TTACHMENT TITLE REVISION c
4.15 RM-14 CONVEESION FACTOR 01 A TTACHMENT PAGE 3 l of i
% . m .- ~ .. w e -_ m c..
~~
m 2.:_ m
- - Q = J =_=f'= T == '=E L--- T - .---
^
a 3 m .. -. *_-C- V _~f' 7-;_._.=' 2 5:Ei.% _
.=F -+ .- - - 4 5:H" - - . . . _ . ~ . . - - :-5'=-.-----. ~.
7 - - - - -- ===
~ ' "- -~ ~ - - - - - ' =
,- _.- -.-6. . .... _.-_ ---..-._i ;L_ R-E- .
-. - ._:u .n..-.-.__----..----.--5.-.T...-
'Z_C . _ , _ _ _ _ _ . . _ . _ - . - - - -
. .,.g_a. 6.R- .l. .-i g _t M,p-M, . #_U_ ;-y_Tr . _- -t3 :k:Z
_ E-ir9 E _e"" " _ _ . -
.-.7
.,.J._1 4NTiL~ ~2NTOb w . _.=.D. M _ Q-%.MZ 5_ ,
_ -._ - . ..- .. .--- -- -. ~. = - ~.
2 -.*!--- . -- . - - - . - - - . - .
g : _- _ _4 :
- -. - _g Mem-_e... +e _
N -:
-.-.v_--.-,
- --- . . . . j' 1
1 m e i 6 . e i e 8
/ i IQ
-12 ' .
a i . . . .
/ a
, m m umr m == a ggy-mps._:.:r. ,yr - - -- - - ---m,mpep.q-5-- ._. _
- --'- - - - ~-%.5 p ' - = _ = - - ----- - . -- - - -
a.: e- - -- -
q _.= _-- _"'"
f _~.
e.'=--T-h.
_ - _ _=. - "..=..r-_. _ . _ -
_. r- - -
(.- *
- W * . _ = =--? ::
- =_==:=: .__. _- - ,
g: _ - __
CONVERSION ~'~ f FACTOR f
~=, ,
I I
, 1, I I 1 I i . e I i i i i , e . . i
-11 ' ' ' ' ' ' ' '
- i e.
- --- - ..-- - - - . ,:f -- - - . ...--
_ _ . _ _ .=-
_s-_. _.
L-_- [.
~ ~ ~ ^ - '
(%Ff *t 5.:M.'-~ f-'" _ __-~ W17_____._'fL , _ _,-,.X' N-XM ^ " - _ - * . - =
~
~
=
. m_~~_ -_-.- _'_.
-f .
.*emwe- .e L
~.
% f b h g
\d -10 ' ' '
10 ee~
- e . e ~
ye ~ e e < m ~ LQ 10 10 3
VOLUME (ft )
. w 'Nw.
D' .NW-.O h Wt N EN.D.M*'- 4
- h' -=hN- G m -. h hSN 46 .e& M .S@ eg,y ese e
e - _ .._ - . . - - - n.--. . - ~ .:- . . . --- -
e No.97887330
.' VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE REVISION NUMBER PROCEQURE HTLE PAGE EPIP-4.16 0FFSITE MONITORING 4
I 4
(With 4 Attachments) 1 of 11 i
PURPOSE 1
Provide guidance for offsite monitoring teams in obtaining equipment, tracking plume, taking samples and transmiting data.
4 i USER I
! -Offaite Monitoring Team members.
i ENTRYCON01RONS i
1 r l
(~ Initiation by EPIP-4.02, Radiation Protection Supervisor Controlling i Procedure.
i J
i a
e j . REVIS10N RECORO l REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1, 2, 3, 4, 7, 8, 9. Att. 4 p.1 DATE: FEB 2 4 1983 4 REV. PAGE(S): DATE:
l REV. PAGE(S): DATE:
. REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
I REV. PAGE(S): DATE:
[ APPROVAL RECOMMENDEC (jk) sn
'- ^
'HAIRMANSTA n0N NUCLEAR SAFETY FEB 3 4 8 i
ANO QPERAnNG :QMMIT!iE t
,, - - - , - - - - - - ->n. ,, --
-.___,,7 . , , . . . . ,
. , e N9. 9186)310 '
NUMBER PROCEDURE TITLE REVISION O .
01 EPIP-4.16 0FFSITE MONITORING PADE 2 of 11
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED
- 1. INITIATE PROCEDURE:
a) BY:
DATE:
TIME:
- 2. TEAM ASSIGNMENT:
a) Offsite monitoring team shall consist of two individuals:
- 1) Only one need be a H.P.
technician
- 3. REQUEST BRIEFING:
a) Request briefing with the ,
Radiation Protection Super-visor as to the following:
- 1) Required monitoring 1) IF no location OR survey locations requirements given, proceed to security building and
- 2) Samples and surveys await instructions.
required
- 3) Anticipated radiation levels
- 4) Protective clothing and
. dosimetry and/or respir-atory gear required b) Obtain information on who to report survey data to:
o l
Na,97847210 ,
NUMBER PROCEDURE TITLE REVISION h '
EPIP-4.16 0FFSITE MONITORING 01 PAGE 3 of 11
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED l
- 4. OBTAIN */EHICLE:
I a) He21th Physics truck will a) Request assistance from be used as primary trans- Radiation Protection Super-portation for Offsite Teams visor or Radiological Assess-ment Director in obtaining vehicles.
b) Insure vehicle has at least ;
1/4 tank of gas 1
- 5. OBTAIN MONITORING KIT:
a) Obtain a monitoring kit ,
specified by Radiation Protection Supervisor .
<~s
( b) Obtain additional equipment from H.P. Office:
b) Additional equipment avail-able at HP instrument repair shop.
- 1) Battery powered air sampler ,
- 2) RM-14 with H.P. 210 probe
- 3) Package of silver zeolite cartri'dges and particulate filters
- 6. PERFORM INSTRUMENT CHECK:
a) . Perform operability check: .
- 1) Battery check
- 2) Current calibration sticker
- 7. PROCEED TO MONITORING LOCATION:
a) Obtain and don protective a) E no gear is specified, clothing, dosimetry, and continue with this instruc-
~
respiratory gear as speci- tion.
fied in Step 3,
v .
l% .
e e e
No. 97087210 e NUMBER PROCEDURE TITLE REVISION O O1 EPIP-4.16 0FFSITE MONITORING PAGE 4 of 11
- STEP ACTION /EXPECiTO RESPONSE RESPONSENOTOBTAINED l
- 7. (CONTINUED) b) Use Attachment 1 and 2 1 to determine:
- 1) Initial location I i
- 2) Location specified by
- perscanel in TSC (EOF) c) Proceed to monitoring c) IF,no monitoring location i location specified in specified
- Step 3_
j 1) Report to Security Building m
y i ../
4
- 2) Await further instruct-
- ions.
- 8. ESTABLISH RADIO CONTACT:
a) Initial radio communication ,
will be with emergency res-ponse personnel in the TSC b) E EOF is activated, radio communication will be with EOF c) Establish radio communica-tion with the TSC or EOF by initiation of EPIP-4.19, Use of Radios for Health Physics Monitoring I
- 1) To transmit:
" Mobile (Number of Vehi-cle) to TSC (HP-2) or EOF (HP-3).
Our location is l
,,,- -- w- n e- ,
s ,
. 1
- Na.97887210 1
NUMBER PROCEDURE TITLE REVISION p 0L EPIP-4.16 0FFSITE MONITORING PAGE 7 of 11 1
1 - STEP ACTION / EXPECTED RESPONSE RESPONSE NOT08TAINED j
- 10. (CONTINUED) 4
- 2) Ensure peccocks are j closed and replace top
- 3) Place chamber in plastic bag and label with date, time and location c) Log information in Step 10.b.3 i on Attachment 3
- 11. PARTICULATE AND IODINE SAMPLE:
a) IF particulate and/or iodine a) IF, sample NOT required,
, sample required: GO TO Step H.
' (,
- 1) Obtain battery powered j air sampler i 2) Load samples with parti-culate filter and silver zeolite cartridge b) IF,,
F sample required during b) Continue with Step ll.c.
high humidity:
1 .
- 1) Shelter sample from moisture
1
- 1) Connect cables to vehicle j battery terminal '
- 2) Turn on air sampler
- 3) Relocate out of plume while sampler is running l
l 1
i
- s. .
I . . . _ , . _ _ . . - . _ . . . . . . _. .
c _ _ _ _ _ _ _ _ . ____.
___y_ , _ 7______
s No.97867210
, l l
NUMBER PROCEDURE TITLE REVISION
(' 01 EPIP-4.16 0FFSITE MONITORING PAGE 8 ot 11
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
- 11. (CONTINUED)
- 4) Disconnect cables after sample volume collected
- 5) Log sample volume on Att. 1 d) Place iodine cartridge and i
particulate filter in a plastic bag and label:
- 1) Date
- 2) Time
- 3) Volume ,
I
- 4) Location e) Log information in Step 11.d -
on Attachment 3 NOTE: Air sample must have been taken using silver zeolite cartridge to use this method for analysis.
- 12. ACTIVITY DETERMINATION:
a) g air sample analysis I required: I I 1) Proceed to a low back-ground area b) Turn on RM-14 (frisker)
- 1) Obtain a background count rate (cpm) c) Hold silver zeolite cart-
, ridge one-quarter inch from
's detector, with influent side of cartridge facing the detector
, eee am Am.a e , m m_ saw_ e e e .' s-ea. easeese s m . ,
~
. _. .. . e. . - -
n s. s7 ss'nto '
NUMBER PROCEDURE TITLE REVISION 01 EPIP-4.16 0FFSITE MONITORING pAGE 9 of 11
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED
> 12. (CONTINUED) 4 d) Observe gross count rate e) Determine net count rate:
GROSS (cpm) - BACKGROUND (cpm) = NET (cpm) f) Determine from Attachment 4_ the conversion
- factor for specific sample volume.
g) Determine activity:
2 NET (cpm) x Conversion Factor = ACTIVITY (uCi/ml)
- ( h) Log on Attachment 3
)
- 1) Date
- 2) Time .
- 3) Location
- 4) Activity
- j i) Place sample in poly bag and label:
l
- 1) Date
- 2) Time
$ 3) Volume i
- 4) Location
- 13. SOIL DEPOSITION:
a) IFF soil sample E requested: a) E toil sample NOT requested, GO TO Step
- 1) Obtain a sample by marking M.
off an approximate one square foot area
- j. -
e m - ee=- -p -@ *N
- Name 9 e e- he e- ee . we - -
s em - * -e -* A "
-=J e -
M
- _
. _ . ,. _. __ . _. ~ . . .- _.,._.._..__.[ u_. . - - - %- --- -
j .
No.978'27220 , '
1 . % ,
NUMBER A TTACHMENT TITLE REVISl0N t i l
l t _
4.16' RM-14 CONVERSION FACTOR n1 l ATTACHMENT PAGE 4 1
' 1 4 -
. 1 of 1 '
s t
.I i
~
l ; . , ,. _, s g.we m_3 ._ -: ;-=,_,. a - ..- : - - -- = -
" s ;3_. .5 mu5-i j
a.--. :_._.=_.=.=.._--------
I r _=- 5 C - - = =
a- . - . . s_-_. I . -
-. r---.--.- _. .
1 l
4 -..-
---._._-.=__-.__=.._=.==E*E:N_
- u. _
=
- < _.. --u ._ ._... _-- = - - = . . . - _ _ = - . -. -_- _- _ .--. . - - = _
.:g_ .; _ . _.
? ,.
__:=.-=____..=!!sa._._ _.
lh h , YkN M N " N ;_ _
- r. __-_ _7.' ^r-_ ?i1:-
.= '~~
e:x
- i a'
r N 5 N=
4, . ,
,1
. ,. , . 1 b I . f f ' I / f I i la 12 .' . . . 4 . . . ' . i i l ,,nM .g1:vrM;rmn ^'
.. =&gs SUf45^C ~= + $*7 ? f
,, a =. Qin
$sr#.iig + =-
j - = . _.
, .. __ _. . ... _ _ _ _ _ . _ . _ _ . _ - . =- --
1 4
-3 ,- i-mmm a . < .. ry . . , . . . ., .
- l. ,,y .
L - gi- = m. <= = l wp " p - ._3 s -
e-. -;
t .: _ .
i
- p= v j .___.._ _ __. - _ _
~ '
CONVERS!ON ' '_-
FACTOR ,-
e.
4 4
).- , ,I , . .!
4 I . I 6 . 4 ./' I e I i t l 1
- i . , i i < i 3 , . . . i t ' - ' ' ' ' ' ' '
10-11 * '- * * * 'e s *
- i + i i >
se: $ ,..=y.-
{ ,,
, .-w p . 4,; . . * ,,
~ ,., * ,
-'w__ __-,._--__r_.
1 2-f r- -k W - -F 4
- - - - 31 .
- g. y _ _.._.y 3.._
. - ~___-_.r-+-~
"---T~.--__-_ ---_---_r.----
_T-_r._._
x_
r._
a_= .
.=-.=_.,
,1
.r---
_n_-
,3 4., .
,t .. -
1 N
t . - - _ . - - _--. _ . .
t
- . - - r=::: _-- ~
j m. , ,.
s.
- I j l i* l 1
I
' I 1
< .i + . ,. . , , ,
J 10'I' ' ' ' ' ' ' * ' ' '
a p.-. . , a a 1.0 l 10 10k -
I' 3 i
YOLUME (ft )
?
3
==
- l . . ~ . . . . _ . - - .. -. . . - ._
, . , , , . , . , . . - -%. ~ . . - - - . . - - -
4
..---r.- y - -- mw+ .
No. 9788 8
- VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE C
PROCEDURE Tl1LE l REVISION NUMBER n1 EPIP-4.18 M0hlIORING OF EOF PAGE j ,
l (With 4 Attachments) 1 of 8 PURPOSE .
" Frovide Health Physics coverage for personnel manning the EOF.
USER Member of Inplant Monitoring Team.
ENTRYCONDITIONS C -
Initiation of EPIP-4.02, Radiation Protection Supervisor Controlling Procedure; I
REVISl0M RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REY. 01 PAGE(S): 1,4,5,6,7,8, Act. 3 page 1. Act. 4 Page 1 DATE: FE8 8 4 m REV. PAGE(S): DATE:
REY. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): ,
DATE:
REY. PAGE(S): DATE:
APPROVED DATE
. APP.?0 VAL RECOMMEM0E0
~
' SA .
ESM f . A ft v
HAIRbANSTATION NUCLEAR SAFETY AND OPERATING COMMITTEE
Ns. 97887210 NUMBER PROCEDURE TITLE REVISION EPIP-4.18 MONITORING OF EOF PAGE 4 of 8
- STEP ACTION /EXPCCTED RESPONSE RESPONSENOTOBTAINED
- 5. (CONTINUED)
- 2) Direct radiation survey d) Obtain air sample
- 1) Load sampler with silver zeolite and particulate filter 8
- 2) Obtain an approximate 10ft air sample' e) Record volume of air sample ,
on Attachment 4_
e 6. PERFORM ANALYSIS ON AIR SAMPLE:
('s
~
a) Proceed to a low background .
area b) Turn ON RM-14 and allow to stablize c) Obtain background count rate d) Hold silver zeolite 1/4 inch ~
from detector with end of cartrzdge, where air sample entered, facing the detector e) Determine Conversion factor based on sample volume from Att. 3_
f) Determine activity:
- 1) Observe gross count rate
- 2) Perform calculation:
(GROSS cpm -
BACKGROUND cpm) x Conversion Factor = ACTIVITY (uC1/al)-
w >
ND. 97Sh721(f
. g s NUMBER 1
PROCEDURE TITLE
} REVISION y 01 EPIP-4.18 MONITORING OF EC PAGE
- , 5 of 8
- STEP ACTION / EXPECTED RESPONSE \ RESPONSE NOTOBTAINED 1
, N
- o. (CONTINUED) g) Place sample in a poly bag labeled: -
- 1) Date .
m 2') Time 1
- 3) Volume </,
I' h) Log on Attschment 1: '
- 1) Date ,
- 2) Time _. __
n
- 3) Instrument and serial number .
I i) Report results to Radio- -
logical Assessment Coor-dinator
. 7. INITIATE MONITORING EQUIPMENT: -
a) E permanent monitoring a) E monitoring equipment -
equipment available: EDT available: '
- 1) Continue with this 1) GO TO Step 8_.
instruction b) Initiate air mocitor: b) E air monitoring equip-ment NOT available:
- 1) initiate air monitoring equipment as per H.P. 1) GO TO Step 7.c. -
procedure 3.2.4.2 c) Initiate direct radiation c) IJF,directmonitorNbT monitor as per H.P. -
available:
3.3.4.3
- 1) GO TO Step 8.
t 1, s _ .
.)
~
- m. sudz to '
- s 4.
k NUMBER PRO:EDURE TITLE REVISION EPIP-4.18 MONITORING OF EOF PAGE i 6 of 8 -
} - STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED I
l 8. ACCESS CONTROL:
a) Set up access control point J
at entrcuce to the building:
, 1) Monitor personnel with i
RM-14
- 9. ISSUE DOSIMETRY:
}
a) As Vepco corporate and state officials arrive at the EOF, issue:
i
- 1) TLD
<-- AND
(..- .
- 2) Self-reading high and low
', range dosimeter y b) Compl'ete Attachment 3 upon
! issuance of dosimetry c) E EOF is activated prior to j issuance of dosimetry:
- 1) Insure all people in EOF l obtain dosimetry s t
{ 10. PROTECTIVE MEASURES: i a) E area is found to be a) E area is NOT contaminated.
- contaminated
- C0 TO Step E.
- 1) Rope off contaminated area
' ,(,
- 2) Request assistance frca "
Radiation Protection 5.sper-visor for decontamination )
and supply of protective clothing, if necessary
\
1 l
\ s -
(.. _ Y... . _ . . _ _ . . _ _ ._
.-- -, - c~ - -
Ns.97007H0 s
NUMBEM PROCEDURE TITLE REVIS10N l
' ~^
EPIP-4.18 MONITORING OF EOF PAGE l 7 of 8
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTORTAINED
-~
w
- 10. (CONTINUED)
- 3) Supply protective clothing to the EOF Emergency Personnel -
> as necessary s
- 11. R.EPEAT SURVETS: .
a) E SITE or GENERAL emergency a) Survey schedule will be caused by a radiological event: established'by Radiological Assessment Coordinator.
- 1) Repeat survey every hour E
- 2) Whenever deemed necessary by Radiological Assessment I
s Coordinator E
- 3) Repeat survey upon monitor alarm b) E permanent air monitor initiated: .
- 1) Replace filter every hour, i at a minimum E -
- 2) Replace filter upon alarm c) E emergency NOT terminated: c) IF, emergency terminated:
- 1) Return to Step 6_ and 1) CO TO Step 12,2 ,
repeat surveys as per survey schedule i
1 l
?
v -
__ . -. .__ . . e . .
. . , e
- m. e7senso
, I I
NUMBER PROCEDURE TITLE REVISION i
' ps.- EPIP-4.18 MONITORING OF EOF 01 PAGE i ,
8 of 8 :
- STEP ACTION / EXPECTED RES90NSE RESPONSE NOTOBTAINED
- 12. ADMINISTRATION:
a) Complete all surveys including:
- 1) Instrument used and serial -
number
- 2) Date
- 12. (CONTINUED) l '
- 3) Time
- 4) Name b) Return surveys to Radiation '~~
Protection Supervisor
(
c) Return air samples to the plant for further analysis
- 13. TERMINATE EPIP-4.18:
a) COMPLETED BY:
DATE:
' TIME:
e O -
m , ee. .g .a. ** e - ene w+M-ep-- ee-e e may-'e ee-a A e.e 4a e ecese w e on " _ e.-e..
-g gvg w- --=yy = -- y, - - - , - ,
y_ ,, - --
g e
. r 1
+
ro.s.Nen.so
- 1 I
j NUMBER ATTACNetENT TITLE REVISION 4 4.18 RM-14 CONVERSION FACTOR --
01 1
l
., A TTACHMENT ,
MGE 3, .
i 3 -
l of f 3
1
.t
- 'E* ~. *M P l
- . - . .L - == t.
_=
= _ :.=-a . .- .
,_ .---.- .. .=- . ==- .
.:..:=
. . :- -.- - -= - . = _ -. _ . = . - . . .
j :--.._.. -
i -
ao.n;_w.s:._wr == = - - - -
~~i _-
i -__ - .- ,
._~'
1
.. .__.. .. e h I &
, , . .,/ , ,
,4 12 . . . , .
13 . i . . . . i , e
=_
0.' 4 3 7 - N G O J
_.m,__
-=
,gg '
. ne. s .. . o , , . . i y - e. .
1 4
.ame_ :e. ._ m-m s -. . . -
fe- a, a. m . ~ .f. ,- -
. _ m y =
.=.: --
CONVEA310N _
FACTOR ,.
w.
f f
f i I = E I g I . f I 1 e i
! ! l e / 1 I 9 3
l
, , ,, , i , , . . .
. 11 2 a :
h
... Aar. ;; ,.
f r- . 'i g g, y' .n .b . 1 ; v c
r /
P; .* - [Q7 i,; ,=
.3.c<
g 4.
= ,
7:
4
,-=z +,x- L m _ - >k . '_ _
. .,. Wb **
W "
t t --
a l t . i 1
- , i.
- 1. io
- l l l1 4
- , ;
v . - . ~ . . . - ~
10, . - . . . - .
10 i..
I VOLUME (ft )
we e . w. A 4 .m n .- 4g mWW e n .* . 44 gmee - e e ww *we e ese e. oe e oe -._.e. .- .a.
I em e
4
..,-- ~ --. , _ ~ r ., .. .,~ ,g._,,.-,,.,,_..,w , _v, - . , , . , ,..w. . , .,,m. . , . . . . . -.. ,
+ '
i .
- eso, s7se7sso 1 , s ir i NUMBER ATTACHMENT TITLE REVISION
' n 4.18 01
( AIR SAMPLE DATA SHEET
! x A TTACHMENT PAGE
' 4 .
1 of 1 i
}
}
J i
m,
{
1
.; ( -
?
h 1
i i
1 m
l l
l J _
e oe -s e =es em ee e e==a--
m e
_ _ . .y,.,.,.
e .sts9fase
- VIRGINIA ELECTRIC AN3 POWER COnAPANY SURRY POWER STATION EMERGENCY Pt.AN !MPt.EMENTING PROCEDURE O.
PROCEDURE TITLE REVIS10N NUNGER n,
EPIP-4.19 USE OF RADIOS FOR HEALTH PAGE PHYSICS MONITORING (With No Attachments) 1 of 5 ,
PURPCSE Explain use of portable and mobile radios, and the radiophones in the emergency centers (H. P. Count Room TSC, EOF). .
USER Radiological Assessment Director, Radiation Protection Director, OR_ r,ay emergency team member.
ENTRYCOMOITIONS Any one of the following:
- 1. Upon activation of the TSC. !
l
- 2. Activation by offsite, onsite, inplant monitoring EPIP's.
- 3. Whenever radio communication is deemed necessary.
- REVISION RECOR0 REV. 00 PAGE(S): Entire Procedure DATE: 07-29-82 REV. 01 PAGE(S): 1 of 5, 2 of 5, 3 of 5, 4 of 5, 5 of 5 DATE: 11-04-82 REV. 02 PAGE(S): 1 of 5, 2 of 5 DATE: FEB 3 41p.3 REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
~AWR0VAI, MCONNENDED APPROVED DA TE
.' ,3 /V%
/
FE8 2 4 m tHAIRMANSTA TICM NUCLEARSAFETY AND OPERATING CONNITTEE
. e ae. . ...m 6i.. .w . . ... . . , , , . _ , .. ._
' de. snsrato' NUk'8ER PROCEDURE TITLE REVISION
. 02
(-~.
EPIP-4.19 USE OF RADIOS FOR
- '40#
HEALTH PHYSICS MONITORING '
2 of 5 -
l
- STEP --
ACTION / EXPECTED RESPONSE RESPONSENOT08TA)ATD \
- 1. INITIATE PROCEDURE:
a) BY:
DATE:
TIME:
- 2. LOCATION OF RADIOS:
a) Location of PORTABLE RADIOS:
- 1) Four portalle radios are located in H.P. Super-visors office -
<- b) Location of mobile radios:
- 1) Health Physics truck #3088 .
- 2) Health Physics truck #1449
~
- 3) Station Management Vehicle #1155 *
- 4) Station Vehicle #1150
- 5) Station Vehicle #1151
' 6) Spare mobile units may be obtained from corporate staff manning the EOF c) Location of radiophone:
- 1) H.P. Count Room (HP-1)
- 2) TSC (HP-2)
- 3) EOF (HP-3) f FOTE: Il[ FAILURE of mobile or portable radio occurs under field conditions, use public telephone as backup communications.-
w .efestase'
- .- Y!RGINIA ELECTRIC AND POWER COMPANY l SURRY POWER STATION EMERGENCY PLAN IMPt.EMENTING PROCEDURE i r
- PROCEDURE TITLE REVISION NUMBER ,
j EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT OF 01 CONTAMINATED INJURED PERSONhTL PAGE 1 of 7 (With 4 Attachments) 1 6
1 1 PURPOSE i
l To provide guidance for health physics personnel accompanying a contaminated i injured individual to an offsite medical facility.
i i
I 1 USER
}
j Health Physics Technician.
1 1
l ENTRYCONDITIONS i
Any one of the following:
l
- 1. Activation by Station Abnormal Procedure. -
- 2. Activation by Station Health Physics Procedure.
A
- 3. Activation by another EPIP.
q i
l 1
! l 1
REVISION RECORD i REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 i REV. 01 PAGE(S): 1 of 7, 6 of 7, and 7 of 7 DATE: Ft3 2 41933 l REV. PAGE(S): DATE:
REV. FAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
APPROVED DA TE APPROVAL RECOMMENCE 0
.J
} l vsA 1 v- FEB 2 41833
,HAIRMANSTAMON NUCLEAR SAFETY l AND OPERATING COMMITTEE
~
\
--..e, + + . - . , - . * - . , . , + .
. . . - e -
e
~
no.ne bsto NUMBER PROCEDURE TITLE REVISION
- 01 PIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT PAGE OF CONTAMINATED INJURED PERSONNEL '
6 of 7
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINEO
- 11. (CONTINUED) b) IF members are found to be b) IF members are NOT contam-contaminated: inated, CO TO Step 12.
- 1) Use protective clothing to minimize spread AND
- 2) Request use of decon-camination facilities at MCV upon arrival
- 12. RELAY RADIOLOGICAL INFORMATION: ,
a) Upon arrival at MCV: a) E the Emergency Plan for MCV is NOT initiated:
- 1) Relay radiological infor-
- mation to the Incoming ,
- 1) Contact the MCV Hospital t
Monitoring Specialist in Superintendent .
i Area A 'see Attachment 4) pR
- 2) Radiation Safety Director in Area B,
, b) Request the need for further assistance or information required by the Radiation Safety Director c) Report arrival time at MCV to
~
Surry Control Room .
- 13. MONITOR TRANSPORTING VEHICLE:
a) Survey the vehicle inside and outside V
. e er e
l l
o
- No.97887210 -
NUMBER PROCEDURE TITLE REVISION EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT PAGE i OF CONTAMINATED INJURED PERSONNEL '
7 of 7
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTQBTAINED l
- 13. (CONTINUED) b) IF,the F vehicle is found contaminated outside
- 1) Decon before return to ,
the station c) IF vehicle is found to be contaminated on the inside:
- 1) Return to the station for further decontamination
- 14. ADMINISTRATION:
l a) Gather all information and survey resulta b) Present all informatica and survey results to the Radio- s logical Assessment Director upon arrival at the station ,
- 15. TERMINATE EPIP-4.20:
a) COMPLETED BY:
DATE:
TIMT,:
END
'GF-
, ,a,e .
O -@ 4 - e f's% e4 e T O
y- y- - r -
r - .- _
~
~
. , s 0
~
No.%7845130'
. y VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE f
h NUNDER
.. PROCEDURE IiTLE REVIS10N 01 i EPIP-4.21 EVACUATION AND REMOTE PAGE ASSEMBLY AREA MONIIORING (With 3 Attachments) 1 of 9
. PURPOSE Collect personnel dosimetry, monitor station personnel evacuating from the site, and decontaminate as necessary.
i USEP Evacuation and remote assembly area monitoring.
ENTRYCON0lTIONS l Any of the following:
- 1. Initiation by EPIP-4.01, Radiological Assessment. Director Controlling
^
Procedure;
- 2. Initiation by EPIP-4.02, Radiation Protection Supervisor Controlling Procedure.
4 l
. REVI510N RECORD
! REV. 00 PAGE(S): Entire Procedure DtTE:07-29-82 REV. 01 PAGE(S): 1 of 9, 4 of 9 DATE: Fgg g 4 g REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REY. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
A ROVED DA TE APPROVAL RECONNENDEO SW
- . c.- -
_ _N,,_N_ m..,-
AND OPERATING COMMITTEE m . . .,
e em ,e-3 % e --
t )
. )
- j ro.sne3x:o l
NUMBER PROCEDURE TITLE REVISION 01
{
EPIP-4.21 EVACUATION AND REMOTE ASSEMBLY AREA MONITORING ,
4 of 9
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
- 6. PROCEED TO REMOTE ASSEMBLY AREA:
a) Using Attachment 1 proceed a) Proceed on Rt. 650 to Hog on Route 650 to intersection Island wildlife management of Routes 650 and 617 area if instructed.
GO TO Step 7.
- 7. EVACUATION WITHOUT RADIOLOGICAL EMERGENCY:
a) IF emergency is non-radio- a) IJ, emergency H logical in nature: radiological in nature:
- 1) Continue with this pro- GO TO Step 8.
cedure b) Collect all dosimetry:
- 1) Securely fastening the self-reading dosimeters i
to TLD's c) Release individuals after -
collection of dosimetry d) GO TO Step M
- 8. EVACUATION WITH RADIOLOGICAL EMERGENCY:
a) Collect all dosimetry:
- 1) Securely fastening the self-reading dosimeters ,
to the TLD's b) Instruct individuals:
- 1) Remain in vehicles until survey complete l
l l
- s M.'s7 setase '
- ^ VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE O NUMBER PROCEDURE TITLE NEVISION 01 EPIP-4.22 POST ACCIDENT SAMPLING OF CONTAINMENT AIR PAGE (With 1 Attachment) 1 of 10 PURPOSE
- 1. To collect a post accident sample of containment air from Unit 1 O_R, R Unit 2 Containment.
USER In-plant Monitoring Team or Sample Analysis Ter.m.
ENTRYCONDITIONS
- 1. Entry directed by Radiation Protection Supervisor.
s REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1 of 10, 10 of 10 DATE: FEs a 4 REV. PAGE(S): DATE:
REY. PAGE(S): DATE:
l REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
APPROVE 0 QATE APPROVAL RECOMMENDED 3&
FEB $ 4 W
?HAIRMAN STAMON NUCLEAR SAFETY AND GPERATING COMMITTEE
s
, e ,
e Nag97867210
., 't NUMBER PROCEDURE TITsE REVISION O 01 l
\ EPIP-4.22 POST ACCIDENT SAMPLING OF
- 68 CONTAINMENT AIR '
10 of 10
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED
- 18. (CONTINUED)
- 4) Date
- 5) Saeple Time 19 .. NOTIFICATIONS:
a) Notify the following that sampling completed
- 1) Radiation Protection Supervisor
- 2) Shift Supervisor
} - 3) Station Emergency Manager
- 20. TERMINATE EPIP-4.22:
a) COMPLETED BY:
TIME:
DAI2:
- 21. FORWARD PROCEDURE:
a) Forward procedure to SNSOC j
for review 4
l
. l
t e
- eee.t7s&7sso
- " VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE
{ NUMBER PROCEDURE TITLE REVISION 01
- EPIP-4.23 POST ACCIDENT SAMPLING OF REACTOR COOLANT PAGE (With 1-Attachment) 1 of 14
\ PURPOSE i
i
- 1. To collect a post accident sample of reactor coolant from the hot leg of Unit 1 OR Unit 2 Reactor Coolant Systems.
USER Chemistry Team Leader AND Chemistry Team Member.
ENTRYQNDITIONS l
- 1. Entry directed by Radiation Protection Supervisor.
. REVis10N RECORO REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1, 13, 14 DATE:FEB 2 4 1983 REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REY. PAGE(S): DATE:
REV. PAGE(S): DATE: i REV. PAGE(S): DATE: l AMROVE0 CA TE AWR0 VAL RECOMMENDEC f l // W FEB 3 4 m f
- lHAIRMANSTAT10M NUCLEAR SAFETY AND GPERATING COMMITTEE
- % . g
~
Ng97ss721b NUMBER PROCEDURE TITLE REVISION l b EPIP-4.23 POST ACCIDENT SAMPLING OF
- A8f REACTOR COOLANT ,
13 of 14 ;
- STEP ACT10N/ EXPECTED RESPONSE RESPONSENOTOBTAINED
- 45. TRANSPORT PIG TO HOT LAB: ,
a) Roll pig to Chs=istry Hot Lab b) Place shielded sample pig in corner by the A.A.
- 46. RECORD SAMPLE DATE/ TIME a) Date b) Time
- 47. HAVE SAMPLE TRIP VALVES SHUT:
a) Notify Shift Supervisor that '
( sampling completed b) IF sampling Unit 1, have a) IF sampling Unit 2_, have control Room shut TV-SS-106A Control Room shut TV-SS-206A AND TV-SS-106B AND TV-206B
- 43. NOTIFICATIONS: -
a) Notify following that sar.pling completed
- 1) Radiation Protection Supervisor
- 2) Station Emergency Manager -
49 SAMPLE ANALYSIS:
a) Request initiation of RWP to dilute sample b) Consider initiation of EPIP-4.26, High Activity Sample Analysis, upon
, termination of procedure 6 -6*
O
~.. .u..y,p NUMBER PROCEDURE TITLE REVISION n 01
\
EPIP-4.23 POST ACCIDENT SAMPLING OF PAGE
' REACTOR COOLANT '
l 14 of 14
~
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED {
- 50. TERMINATE EPIP-4.23:
J a) COMPLETED BY:
TIME:
DATE:
b) Forward procedure to SNSOC for revizw b
6 1
t D
6 b
e l
b e
e - - - y -
~.
l
( "
No.*S74S?S30'
)
l VIRilNIA ELECTRIC ANO POWER COMPANY
~
, A SURRY POWEM STATION !
EMERGENCY PLAN IMPLEMENTING PROCEDURE m REVIS10N
. \,' NUMggy PROCEDURE TITLE
! 01
- EPIP-5.03 PERSONNEL ACCOUNTABILITY FAGE 1
(With 1 Attachment) 1 of 7
} rVRr0SE
] 1. To determine the personnel who are inside the protected area and unaccounted for within 30 minutes following declaration of Site Emergency, or General Emergency.
l 2. To provide a periodically updated list of all personnel inside the i protected area.
USER j Security Team Leader.
i ENTRYCONDITIONS i
Any one of the following:
I . .
- 1. Activation by another ZPIP; E
- 2. Declaration of a Site Emergency, or General Emergency; 9.E
- 3. Any time deemed necessary by the $tation Emergency M nager.
I i
REVIS10N RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1 of 7, 2 of 7. 6 of 7 DATE:FE8 3 41983
-l REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
> APPROVAL COMMEN0 APPROVEU DATE
, m - #N fLads~ , , , ,
C AIRMANSTATIONNUCLEARSAFETY AND QPERATING COMMITTEE e e4 s=-e a- mumumexamme= *==e-- --= *==e ,.
, .m
- - - - - a -- , - ,. n -,- -
~ -
B
, 'No 978$7210
- - 4; ,
I NUMBER PROCEDURE TITLE REVISION l 01 h EPIP-5.03 PERSONNEL ACCOUNTABILITY PAGE 2 of 7
- STEl ? ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
- 1. INITIATE EPIP-5.03:
a) INITIATED BY:
TIME:
DATE:
- 2. VERIFY EVACUATION STATUS:
a) Evacuation - NOT ORDERED a) IF evacuation ordered, Go TO Step M.
i NOTE: Each Emergency Assembly Area will have an Emergency Assembly Area Leader. This person will be a supervisor or other
( cognizant person normally working in the Emergency Assembly Area.
Each Emergency Assembly Area Leader will immediately take steps to determine who is missing from their Emergency Assembly Area that shot d be there, and who is present that should not be there. .
Each Emergency Assembly Area Leader will record the above information and forward it to Security.
- 3. INITIATE ACCOUNTABILIIY WITHOUT 7.VACUATION: l a) M31.e announcement on station Gai-Tronics system as follows: ,
- 1) " Emergency Assembly Area
- Leaders - TAKE ACCOUNT-ABILITY"
- 2) " Emergency Assembly Area l
~
Leaders deliver results of accountability to security" i i_
t
- I
+se , .--
_n.. .m . - - - . - - v
~ '
.Ns. 97pF210 ,
- )
NUM8[R PROCEDURE TITL2 REVISION
~
EPIP-5.03 PERSONNEL ACCOUNTABILITY PAGE 6 of 7
- STEP ACTION / EXPECTED RESPONSE -
RESPCNSE NOTCBTAINED
- 15. FORWARD LIST:
a) Forward list of all a) E TSC NOT manned, forward personnel within the lists to Station Emergency Protected Area to Manager in Control Room.
Emergency Administrative '
Director in TSC b) Forward list of all pe,rsonnel within the Protected Area indicated missing to Emergency Administrative Director in TSC
- 16. RUN COMPUTER LISTINGS:
- a) Produce a list of all a) E computer is inoperable, personnel within the perform manual logging of Protected Area all personnel SE As directed by Emergency Administrative Director
- 17. VERIFY EMERGENCY STATUS: -
a) Emergency - NOT terminated a) _IF terminated, C0 TO Step
-18.
b) C0 TO Step 16
- 18. TERMINATE EPIP-5.03:
a) Close-Out
- 1) COMPLETED BY: l TIME: _
DATE:
- .i I
r . .
l, - ** .
i . No.o7ecrase
. ; VIP.0lNIA ELECTRIC AND POWER COMPANY
- SURRY POWEM STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE i
PROCEDURE TITLE REVISION NUNGER f 01
- EPIP-5.05 SITE EVACUATION PAGE 1 (With No Attachments) 1 of 5 1
}
PURPOSE i
i j Insure steps are taken to provide for a quick and orderly evacuation. t i
4SFR i '
Station Emergency Manager OR, Emergency Administrative Director.
ENTRYCONDITIONS i
i l Any on'e of the following conditions exist:
- ( .__.
) 1. Activation by another EPIP; I
i OR j 2. Upon determining evacuation is imminent;
! 3. At any time deemed necessary by the Station Emergency Manager.
1 1
i REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1 of 5, 3 of 5 DATE: FEg 2 41983 I REV. PAGE(S): DATE:
REV. PAGE(S): , DATE:
i REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
OMMERO APPROVED CATE APPROVAL FEB 3 4123 WAIRMANSTA TION NUCLEARSAFETY v AND QPERATING COMMITTEE
- ,aee Sm*M *es e++e.owg, = mm e, g7 m, .. . .,,4,%_ ww ,
,=p.es. '*M4eum**** hee.=*
. Wr &@
- 6 e e>mWee emme. m .
l
Ns. nash:o ,
- , p-3 a NUMBER PROCEDURE TITLE REVISION 01 i
C EPIP'-5.05 SITE EVACUATION PAGE 3 of 5 l - STEP ACTION / EXPECTED RESPONSE RESPONSE NOT08TAINE0 l 5.. CALL TP.AINING CENTER:
1 i a) ~ Notify training personnel i by Statica PBX - #270, 271, or 272 .
b) Inform evacuation ordered c) Advise which assembly area is to be used j 6. INPLANT NOTIFICATION:
a) Verify primary remote assembly a) E NOT, GO TO Step 7.
area to be used (Rt. 650 & 617) b) Sound Emergency Alarm 4
C.'
c) Make announcement on statuon j Gai-Tronics as follows:
i 1) " Personnel NOT responding
, to emergency evacuate the j station" 2)." Turn in security badge, 4 keep pocket dosimeter and gn
- 3) " Proceed to intersection of Routes 650 and 617"
- 4) " Remain in vehicle for further instructions" l .
d) Repeat Steps 6 THEN, GO TO Step 8_
- 7. INPLANT NOTIFICATION:
a) Verify alternate remote assembly area to be used (Hog Island) b) Sound Emergency Alarm
~
1
)
me e k
e es ,
era.treenw' 1 VIRilNIA El.ECTRIC AND POWER COMPAkV
- * # SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE C NUM ER PR0CEOUn nrLE u visiaN c 01 r EPIP-5.07 ADMINISTRATION OF RADI0 PROTECTIVE DRUGS ' PAGE (With 2 Attachments) 1 of 4 PURPOSE To administer, with proper authorization, radioprotective drugs.
USER Radiological Assessment Director or Senior Health Phy::1cs personnel onsite. t ENTRY CONDITIONS Any one of the'following conditions exist:
Os
- 1. Activation by another EPIP; -
t 8
- 2. Survey results indicate inhalation dose may have exceeded 10 Rem; M
P h
t REVIS.'ON RECORO REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1 of 4, 2 of 4 DATE:FEg 8 4123 REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
REV. PAGE(S): DATE:
l REV. PAGE(S): DATE: 1 REY. PAGE(S): DATE:
APPROVAL M MMENCEO I APPR VEC CA TE
! '. y brK% ' /
FEB 2 41983 Q IRMANSTAn0N NUCLEAR SAFETY AND OPERATING COMMITTEE 6
4
. No 1'esirio ,
, ..,.i.
~
quMBER PROCE00RE TITLE REVISION 01
{ EPIP-5.07 ADMINISTRATION OF RADI0 PROTECTIVE DRUGS PACE 2 of 4
- STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED
- 1. INITIATE PROCEDURE: -
a) INITIATED BY:
DATE:
TIME:
- 2. AUTHORIZATION:
a) Review data from EPIP-4.01 with the Station Emergency Manager b) Request approval for use of radioprotective drugs from
{_,,. Station Emergency Manager
- 3. OBTAIN MEDICAL ADVICE:
a) Contact VEPCO Medical a) IF_ medical approval is NOT Director available within 30 minutes administer the KI7ablets.
office -
office -
home - i beeper -
k
\
CAUTION: Potassium iodide should not be used by people allergic to iodine.
.e 6
e g 4- .e e e +
6
.. ._ ..