ML20069G124
| ML20069G124 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/13/1982 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20069G103 | List: |
| References | |
| TAC-10836, NUDOCS 8209280457 | |
| Download: ML20069G124 (2) | |
Text
,
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL i
NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE I
The U. 5. Nuclear Regulatory Comission (the Comission) has issued Amendment No.57 to Facility Operating License No. DPR-72, issued to the Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimee, City of Leesburg, City of New Sntyrna Beach and Utilities Comission City of New Smyrna Beach, City of Ocala, Orlando Utilities Comission and City of Orlando, Sebring Utilities Comission, Seminole Electric Cooperative, Inc., and the City of Tallahassee (the licensees) which revised the
~
Technical Specifications (TSs) for operatio'n of th'e Crystal River Unit..No.-.
3 Nuclear Generating Plant (the facility) located in Citrus County, Florida.
The amendment becomes effective 30 days after its date of issuance.
This amendment modifies the Techn. al Specifications to reflect an expanded Plant Review Committee membership, an expanded procedural review and current title designations for CR-3 management.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the' Act),
and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in B209280457 820913 PDR ADOCK 05000302 P
PDR 1
7590-01
. the license amendment. Prior public notice of this amendment was not required since the amendmen't does not involve a significant hazards consideration.
The Commission has dethrmined that the issuance of this amendnent will not result in any significant environmental impact and that t
pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.
For further details with respect to this action, see (1) the application for amendment dated December 3,1980, as revised January 19, 1982, (2) Amendment No. 57 to License No. DPR-72, and (3) the Commission's related Safety Evaluation. All of these iteins are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, DC 20555, and at the Crystal River Public Library, 668 N.W. First Avenue, Crystal River, Florida. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
Di rector, Division of Licensing.
Dated at Bethesda, Maryland, this 13th day of September 1982.
R THE NUCLEAR REGULATORY COMMISSION j
j fJohjiF.Stolz, Chief i
Operating Reactors Branch #4 Division of Licensing
!l
- - - - - - - - -