ML20069F573
| ML20069F573 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/27/1982 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20069F566 | List: |
| References | |
| TAC-47885, NUDOCS 8209280139 | |
| Download: ML20069F573 (2) | |
Text
.._
- )
a
)it 1
7590-01 1
l
'l UNITED STATES NUCLEAR REGULATORY CONNISSION 1
00CrET NO. 50-321 GEORGIA POWER COMPANY ET AL.
NOTICE OF ISSUANCE OF AMENOMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Comission) has issued Amendment No.90 to Facility Operating License No. DPR-57, issued to Georgia
'~'
Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Gsorgia, and City of Dalton, Georgia, which revised Technical Specifi- ~
cations (TSs) for operation of the Edwin I. Hatch fluclear Plant, Unit No. l
~
(the facility) located in Appling County, Georgia.
This amendment was authorized by phone on February 8,1982. It revised the TSs for a one-time change to permit an extension in the time interval, from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, before the oxygen concentration in the drywell need be reduced to 4%, after the reactor is placed in the Run Mode. The amendment was issued on an expedited.hasis to avoid termination of an already initiated startup. '
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, a.s amended (the Act),
and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Consnission's rules '-
and regulations in 10 CFR Chapter I,- which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.
8209280139 820827 DRADOCK05000g 1
- - L
- - -. = -...-~.-...
n.-.....;.
4 7590-01 i
- The Commission has detennined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental imp 4ct appraisal need not be prepared in connection with issuance of this amendnent.
For further details with respect to this action, see (1) the request for amendment dated February 8,1982, as confirined by application dated April 5,1982, (2)athe Commission's letters to th,e,
licensee dated February 10, 1982 and August 27,1982, and (3) Amendment No. 90 to License No. DPR-57. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the Appling County Public Library, Parker Street, Baxley, Georgia 31513. A copy of items (2) and (3) may be obtained upon request addrer, sed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555,_ Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this 27th day of August 1982.
FOR THE NUCLEAR REGULATORY CO M ISSION oh T. Stolz, Chief Ope ating Reactors Branch #4 slon of Licensing
-.. -