ML20072K355

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Availability of Amend 95 to License DPR-57
ML20072K355
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/22/1983
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20072K338 List:
References
TAC-49705, NUDOCS 8303300520
Download: ML20072K355 (2)


Text

,

~7590-01 '

UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-321 GEORGIA POWER COMPANY, ET AL.

NOTICE OF fSSUANCE OF AMENDMENT TO FACIL'ITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Comission) has issued Amendment No.9 5 to (Facility Operating License No. DPR-57, issued to Georgia Power Company, 091? thorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, wh1ch revis.ed Tr.chnical Speciff-cations (TSs) for operation of the Edwin I. Hetch Nuclear Plant, Unit No.1 (the facility) located in Appling County, Georgia.

l This amendment was authorized by phone on February 22, 1983.' It revised the TSs for a one-time' change to permit an extension in.the tim

  • interval,. from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, before the oxygen concentration in ~

the drywall need be reduced to 4%, after the reactor is placed in the Run Mode. The amendnent cas issued on an expedited basis to avoid tennination of an already initiated startup. '

The application for the amendment complies with the standards and requirements of'the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's. rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment doe,s not involve a significant hazards consideration.

The Ceanission has determined that the issuance of this amudment will not result in any significant environmental impact and that, pursuant to 1.0 CFR Section 51.5(d)(4) an environmental impact statement, or negative declaration "a 288!PJ888881 P

PDR

~

. 7590-01 and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the request for amendment dated February 22, 1983, as confirmed by applica-tion dated March 2,1983,(2) the Commission's letter to Georgia Power Company dated February 23, 1983, (3) Amendmerit No. 95 to License No.

DPR-57, and (4) the Commission's r01ated Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C.-and at the Appling County Public Library,'301 City Hall Drive, Baxley,' Georgia 31513. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 22nd day of March 1983.

FOR THE NUCLEAR REGULATORY COMMISSION d

Jo n *F. Stolz, Chief 0 rating Reactors Branch #4 vision of Licensing l

l l

94

.