Similar Documents at Byron |
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20149M2951996-11-29029 November 1996 Exemption from Requirements of 10CFR50.60 Re Safety Margins Recommended in ASME Boiler & Pressure Vessel Code Case N-514 TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20059C2351993-12-17017 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication ML20044A8111990-06-27027 June 1990 Comment Opposing Closure of Lpdr of Rockford Public Library ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20214X1871987-06-11011 June 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000 Based on Four Severity Level III Violations Noted During 860721-0808 Insp ML20205Q1711987-04-0202 April 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000. App Re Evaluations & Conclusions Encl IR 05000812/20100311987-02-26026 February 1987 Order Imposing Civil Monetary Penalty in Amount of $100,000 Based on Violations Noted During Insps on 850812-1031 ML20210T7321987-02-11011 February 1987 Unexecuted Amend 6 to Indemnity Agreement B-97 Substituting Item 3 of Attachment to Indemnity Agreement in Entirety W/ Listed License Numbers,Effective 870130 ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20213G4381986-10-24024 October 1986 Unexecuted Amend 5 to Indemnity Agreement B-97,substituting Item 3 of Attachment to Agreement in Entirety W/Listed License Numbers,Effective on 861106 ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 IR 05000506/20070221986-05-0202 May 1986 Order Imposing Civil Monetary Penalty in Amount of $25,000 for Violations Noted During Insp on 850506-0722.Violations Noted:Failure to Establish Radiological Safety Procedures & to Adequately Train Personnel ML20138C7301985-12-0909 December 1985 Order Imposing Civil Penalty in Amount of $25,000 Per 850606 Notice of Violation & Proposed Imposition of Civil Penalty.Licensee May Request Hearing within 30 Days of Date of Order ML20205E8741985-10-28028 October 1985 Exemption from GDC 4 of 10CFR50,App a Requirement to Install Protective Devices Associated W/Postulated Pipe Breaks Primary Coolant Sys.Topical Rept Evaluation Encl ML20102A2981985-01-0707 January 1985 Petition Requesting Aslab Grant Intervenor Appeal & Order Further Hearings on Safety of Plant ML20099L2581984-11-27027 November 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20099G5381984-11-23023 November 1984 Supplemental Appeal Brief in Response to Intervenor 841106 Supplemental Brief on Appeal & in Support of ASLB 841016 Supplemental Initial Decision Authorizing Issuance of Ol. Certificate of Svc Encl ML20100K0411984-11-22022 November 1984 Submits Concerns Re Safety of Local Residents in Event of Accident & Excessively High Cost of Projected Operation of Facility ML20107H7841984-11-0606 November 1984 Supplemental Brief on Appeal of ASLB 841016 Supplemental Initial Decision Granting Authority for Issuance of Ol. Decision Should Be Reversed.Certificate of Svc Encl ML20140E4081984-10-31031 October 1984 Executed Amend 1 to Indemnity Agreement B-97,deleting Items 2A & 3 in Entirety ML20098G8841984-10-0202 October 1984 Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl ML20098G8681984-10-0202 October 1984 Answer to Intervenor Motion to Reopen Record Re Bechtel Independent Design Review.Motion Should Be Denied ML20098G8901984-10-0202 October 1984 Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp ML20098G8911984-10-0202 October 1984 Joint Statement of Cw Dick & EM Hughes Re Independent Design Insp ML20098G8821984-10-0101 October 1984 Affidavit of Kj Green Re Integrated Design Insp Concerning Mechanical Engineering Work ML20098G8741984-10-0101 October 1984 Affidavit of Br Shelton Re Integrated Design Insp ML20098G8881984-09-29029 September 1984 Affidavit of RW Hooks Re Integrated Design Insp Concerning Structural Design ML20098G8831984-09-28028 September 1984 Affidavit of W Faires Re Findings 3-15 & 3-16 of NRC 830930 Integrated Design Insp Rept ML20098G8811984-09-28028 September 1984 Affidavit of Cw Dick Re Independent Design Review ML20098G8791984-09-28028 September 1984 Affidavit of RP Tuetken Re Readiness for Fuel Loading ML20098G8781984-09-28028 September 1984 Affidavit of RW Manz Concerning Findings 3-11 Through 3-14 & 3-17 of NRC 830930 Integrated Design Insp Re Westinghouse ML20098G8871984-09-28028 September 1984 Affidavit of EM Hughes Re Idvp ML20098G8851984-09-27027 September 1984 Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation of Unit 1 ML20098E2371984-09-24024 September 1984 Reply to Intervenor 840918 Proposed Supplemental Initial Decision.Certificate of Svc Encl ML20097E7221984-09-13013 September 1984 Agreed Motion for Time Extension Until 841101 to File Petition for Hearing Re Emergency Planning Commitment W ML20097C5311984-09-12012 September 1984 Motion to Reopen Record to Include Plant Design as Issue. Supporting Documentation & Certificate of Svc Encl ML20097B7791984-09-10010 September 1984 Proposed Supplemental Initial Decision Re Reinsp Program. Certificate of Svc Encl ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6441984-08-28028 August 1984 Notice of Withdrawal of Appearance in Proceeding.Related Correspondence ML20112D5271984-08-24024 August 1984 Applicant Exhibit A-R-4,consisting of Feb 1984 Rept on Bryon QC Inspector Reinsp Program ML20112D5031984-08-24024 August 1984 Applicant Exhibit A-R-5,consisting of June 1984 Suppl to Rept on Bryon QC Inspector Reinsp Program ML20112D7441984-08-23023 August 1984 Intervenor Exhibit I-R-1,consisting of Undated List of Teutken Safety Category Insp Types ML20112D7511984-08-21021 August 1984 Staff Exhibit S-R-1,consisting of 840813 Instruction for Walkdown of Cable Tray Hanger Connection Welds ML20112D4641984-08-21021 August 1984 Intervenor Exhibit I-R-11,consisting of Undated Chronological Date Listing of Util Responses to Interrogatory 12.VA Judson to Mi Miller Re Interrogatory 12 & Supplemental Responses Encl 1999-03-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:DEPOSITIONS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] |
Text
s A Materials received included masonry block, sand and coarse aggregate concrete, s tructural s teel reinforcements , post-tensioning tendons, and bolts.
Q With respect to steel that was received on site, what types of- items would this encompass ?
A Primarily structural steel beams and embedments..
Q What would you do when the materials arrived on site?
A I would assure that the applicable documentation accompanied the shipment, specifically relating to heat lot numbers, traceability to the origin of the steel and insure that nothing was broken, bent or misformed, and they were coated properly if applicable.
Q How did you determine whether the items conformed to the requirements?
A 1 did a visual inspection of the items as they were received and examined the paperwork.
Q Was there ever a time when the paperwork or documentation did not match what the material was supposed to be?
A Yes, this happened frequently.
8303220198 830316 PDRADDCK05000gg T
A
n
- ~
Q Could you describe for me what you would do in this instance?
A I followed Mr. Barnhart's practices, which I learned from him, especially relating to Mid-City trchitectural iron and structural embedments. Many times the paperwork would not show up, but steel would be accepted, a phone call would be made to Mid-City and usually the next day or the day after that, the right paperwork would arrive for the truckload of steel. I would then fill out the paperwork in such a way that it would appear that the steel had arrived on site with the paperwork, and the shipment would be shown to have been accepted on the date the steel actually arrived on site, although it was not actually acceptable until several days later when the documents arrived. In other words, I would postdate the Receiving and Inspection (R&I) report for the shipment.
Q When you say the material would be " accepted"on the day it was actually physically received at the plant, what does that mean?
A It was allowed on site.
Q Were you instructed to place a quarantine tag on such material?
A No, I wasn't.
Q Have you reviewed the portions of Blount's QA/QC receiving and storage inspection manual which Commonwealth Edison produced to you?
n
. -l4-A Yes, I have. It is marked as Exhibit E to my testim 6ny.
Q Do you now know of any way in which the manner you were instructed or trained to do these inspections deviated from the requirements of that manual?
A Yes, I do.
Q Please describe that deviation.
A According to the manual, the steel should have been rejected and/or accepted but quarantined. The way I was told and taught to do it was easier and generated less paperwork. According to 58.2 of the manual, I should have quarantined a shipment, but then I would have had to write up a second R&I. report and a letter explaining the quarantine and release. I assume that this, in turn, would have generated even more work for and by Mr. Donica, since he was to review and sign all R&Is and related reports.
Q Who showed you how to receive and document this type of shipment?
A Mr. Barnhart.
Q You also mentioned that you were responsible for receiving inspections of concrete blocks. Can you describe how you did receiving inspections for concrete blocks?
i i
A All or nearly all of the concrete blocks came from Eller & Wylie i
m Block Company in Ohio. Mr. Wylie was an extremely uncooperative individual when it came to quality conformance of block. He.was told on numerous occasions that he was to have the applicable block-tarped and completely weather sealed but he often did not do so.
Many times'the block would arrive wet or dirty because of snow, rain, road salt, etc.
Q What would happen when the b?ock would arrive wet, dirty or with road salt on it?
A Mr. Donica instructed me to receive block to be segregated and tagged for Category II construction only. Ile instructed me not to document that the block was not tarped, and instructed me to accept wet Category I block.
Q Do you believe that the practice you were trained to do is in conformance with the way the manual states that concrete block is to be received and inspected?
A I don't know, but I have concerns about what actually happened to the block once it was on the site.
Q Please describe the nature of those concerns.
A My concern is based on the fact that Category II block was of ten stored in a location which was more convenient for Category I use, indeed often right next to Category I construction such as in the fuel handling or auxilliary buildings.
Category I block was not marked. Block which, because of I
its condition upon receipt, was to be used only in Category II construction was marked with yellow tape; however yellow tape i
i t _
m o a was also used to mark many other parts of_the construction project, for example, an open stairwell.
In addition, block which was wet on receipt was put in different places, such as the turbine building,- to dry out. I did not supervise the drying process and I do not know who, if anyone, did.
I do not know whether this block was eventually used in Category I construction. Category I block was stored in not one specific location but in a variety of locations, often quite-a distance from where Category I construction was going on.
In short, I know of no way of assuring that block that was segregated for Category II use or was wet did not end up in Category I use because the marking system was no inadequate and Category II block was often more convenient to Category I construc-tion than Category I block was.
Q Whose job was it to make sure Category II block was restricted-to Category II construction?
A I do not know whose responsibility it.was; however, I know that I did not have the means to insure this. Because of the location of storage, and my other duties throughout the construction site, I was physically unable to make sure that Category II block was used only in Category II construction.
Q You also stated previously, and also brought up in your affidavit, i
that you were responsible for receiving and storage inspections
, of tendons. Could you describe for me what a tendon is?
i A A tendon is a bundle of quarter-inch wires, some more than l 200 feet long. Tendons are used in post tensioning of concrete I
u
w containment buildings.
Q Can you describe for me what pos t-tensioning is?
A Post-tensioning is a process involving stressing of steel wires. The tendons are installed after the concrete is in place in order to provide additional strength to the concrete.
Q Please describe for me how you performed your receiving and storage inspection of tendons?
A Tendons arrived two to a bundle, two bundles per truck. They were tarped and sealed in plastic bags. The tendons were separated by wood beams. Upon arrival I would first check to make sure all the applicable paper work was there. The second step was opening the bag to insure that there was no dirt, rust,or nicked or bent wires . Also, I would place a drainage slit in the bottom of the bag. From there the tendons would be taken to one of the authorized tendon storage areas where they were unloaded and stored for future use. About one-fourth of the time I would accompany the tendons to the storage area to watch them being unloaded.
Q llave you reviewed portions of Blount's QA/QC materials receiving manual which deals with how tendons were to be inspected on receipt?
A Yes. I have. Two versions of it are marked as Exhibits F-1 and F-2 to this testimony, and were exhibits 5 and 6 respectively to my deposition.
__-