ML20069C469

From kanterella
Jump to navigation Jump to search
Amend 12 to License NPF-12,changing Tech Specs by Adding Containment Penetration Conductor Overcurrent Protective Device for Steam Cleaning Machine Permanent Power Source
ML20069C469
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/04/1983
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20069C471 List:
References
NUDOCS 8303170611
Download: ML20069C469 (5)


Text

,

'"9 1

S SOUTH CAROLINA ELECTRIC 5 GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.12 License Mc. NPF-12 1.

The Nuclear Regulatory Commission (the Ca7 mission) has found that:

4 A.

The application for amendment to the Virgil C. Sumner Nuclear Station, Unit No.1 (the facility) Facility Operating License No. NPF-12 filed by the South Carolina Electric & Gas Company acting for itself and South Carolina Public Service Authority (the licensees), dated December 17, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Camnission's regulations as set forth in 10 CFR Chapter I:

B.

The facility will operate in confornity with the application, as amended, the provisions of the Act, and the regulations of the Canmission; C.

There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Canmission's regulations set forth in 10 CFR Chapter I:

D.

The issuance of this license anendment will not be inimical to the canmon defense and security or to the health and safety of the public; E.

The issuance of this license amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is hereby amended by page change to the Technical Spec-ifications as indicated in the attachments to this license amendment.

Paragraph 2.C(2) of Facility Operating License No. NPF-12 is hereby amended to read as foll ows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.12, are hereby incorporated into this license.

South OFFICE)

.u - eaoa ao m eaoaor

oa^oockosooom NRC FORM 318 (10-80) NRCM O24o OFFICIAL RECORD COPY usceo
mi-32s. e0

O

-2 Carolina Electric & Gas Company shall operate the facility in accord-ance with the Technical Specifications and the Environmental Protection P1an.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

}

d

't Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing

Enclosure:

Technical Specification Changes Date of issuance: March 4, 1983 I

i d

<u4,A F

OELDefj pD:LIVI4 AD:L:DL

....L.A...:.D..Lh,B #4DL:LB

.............4...

crrice >

....mua.......ozuo.c

...aag.g.gi.n..;

am.e......... 6.M........

.s em......1.N.9.v v.......

se.n. m

....u@u.........u.nz.aa.. 3.......u..m...

)

....af... m.........u..m....

=.m.

OFFICIAL RECORD COPY um m mi-msa sac ronu ais tio-noi nacu o24o

ATTACHMENT TO LICENSE AMENDMENT NO. 12 FACILITY OPERATING LICENSE N3. NPF-12 DOCKET NO. 50-395 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains a vertical line indicating the area of change.

Amended Page 3/4 8-58 omes) sunnAue) oan >

NRC FORM 318 00-80) NRCM ONO OFFICIAL RECORD COPY usom ini_m.eea

TABLE 3.8-1 (continued)

~

49 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICE TEST SETPOINT CRITERIA

.E

[

EQUIP NO.-SYS/ DESCRIPTION DEVICE LOCATION TEST SETPOINT RESPONSE TIME 480 VAC MCC, CONTINUED:

161) XVG 80958-RC/ REACTOR HEAD VENT PRIMARY XMC1DB2Y/23FJ 225 Amps N/A VLV. TO PRESS. RELIEF TANK BACKUP XMC1DB2Y/23FJ 60 Amps 5 100 Sec. 162) XVG 8096A-RC/ REACTOR HEAD VENT PRIMARY XMC10A2X/7AE 225 Amps N/A VLV. TO PRESS. RELIEF TANK BACKUP XMCIDA2X/7AE 60 Amps 1 100 Sec.

co 163) XVG 80968-RC/ REACTOR HEAD VENT PRIMARY XMC1DB2Y/12IM 225 Amps N/A h

VLV. TO PRESS. RELIEF TANK BACKUP XMC10B2Y/121M 60 Amps 1 100 Sec. 164) XVG 7503-AC/CRDM COOLING PRIMARY XMCIDA2X/11IM 225 Amps N/A WATER OUTLET VLV.

BACKUP XMCIDA2X/111M 60 Amps 5 100 Sec. 165) XVG 7502-AC/CRDM COOLING PRIMARY XMC10B2X/7IM 225 Amps N/A WATER INLET VLV.

I BACKUP XMC1DB2X/7IM 60 Amps 1 100 Sec.

k 166) WELDING RECEPTACLE FOR STEAM PRIMARY XMC1C3X/9KM 300 Amps

< 200 Sec.

3 CLEANING MACHINE WE BACKUP XMC1C3X/9KM 300 Amps i 200 Sec.

if O

O O