ML20069C439

From kanterella
Jump to navigation Jump to search
Forwards Nuclear Power Program Mgt Manual, Update to 821115 Submittal
ML20069C439
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/09/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20069C442 List:
References
0982-L, 982-L, NUDOCS 8303170548
Download: ML20069C439 (2)


Text

--

/LLINDIS POWER COMPANY 0982-L IP CLINTON POWER STATION, P.O. BOX 678, CLINTON. ILLINOIS 61727 March 9, 1983 FRINCIPAL STAFF 1

"[

Docket 50-461 g3 A/RA PA0 Mr. J. G. Keppler g

4 g ggp 6%0 Regional Administrator f.yr Ac U.

S. Nuclear Regulatory Commission

.be.a isp Region III OE 799 Roosevelt Road ML o

Glen Ellyn, Illinois 60137 OL F6LL /4

Subject:

Illinois Power Company (IPC) Nuclear Power Program

Dear Mr. Keppler:

On November 15, 1982 Illinois Power Company submitted the Illinois Power Company Improvement Program for your review and concurrence (

Reference:

D.

P. Hall letter to J.

G.

Keppler, 0982-L, dated 11/15/82).

The attachment Manual contains a more complete description of the IPC Nuclear Power Program and is forwarded as an update to our November 15, 1982 submittal.

The Manual is provided for your information and Illinois Power Company representatives are available to discuss any questions which may arise.

Si erel

ours, P.

Hall Vice President REC /jb Attachment cc:

U.S.

NRC Senior Resident Inspector Manager-Quality Assurance Director-Office of I&E, Washington, DC 20555 Illinois Department of Nuclear Safety MAR 11 1983 e303170548 8303o9 PDR ADOCK 05000461 A

PDR

r l

l-March 2, 1983

('

TO:

DISTRIBUTION

SUBJECT:

Nuclear Power Program ha~agement Manual n

This letter promulgates the Illincis Power Company Nuclear Power Program Managerent Manual.

Nuclear Power Program Management is the process that assures that all requirements are met to', manage, construct, operate and maintain Clinton Nuclear Pcwer Station properly.

[rL This Manual contains programs, commitments, and schedules that constitute documentation of Nuclear Power Program Management within Illinois Power Company.

The Illinois Power Company Improvement Program (Quality Recovery Program, Verification' Program, Nuclear Program Management Plan) andisupporting efforts are included.

The Manual contains changes from material prepared in November, 1982.

The major change is the addition of milestones addressing the Training Recovery Plan, Procurement Stop Work Recovery Plan and schedule updating.

Only summary schedules are, presented in this manual; where appropriate, detailed'scliedules are available in individual programs that support the goals described in the Manual.

The Nuclear Power Program Management Manual will be maintained in accordance.with Section 2.

Depart-ment Heads are responsible for application of resources L

within Illinois Power Company in support of the Nuclear

,1

{

Power Program.

.. Hall l

DPH/jb DISTRIBUTION s

3 TO:

J. H. MacKinnon T.

F.

Plunkett J.

D.

Geier

'd W. Connell i

J. E.

Findley A. J.

Budnick L.

S.

Brodsky I

cc:

W. C.

Gerstner i

fJ

, _.