OPERATING DATA REPORT DOCKET NO. 50-302 DATE 3/2/83 COMPLETED BY D. Bocart TELEPHONE (904) 795-6486 OPERATING STATUS Notes

1. Unit Name:

Crvaral River ifn4, 43

2. Reporting Period:

2/1/83 - 2/28/83 2544

3. Licensed Thermal Power (MWt):

890

4. Namepiste Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

825 850

6. Maximum Dependable Capacity (Gross MWe):

811

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N /A

9. Power Level To Which Restricted,if Any (Net MWe):

2475 MW thermal.

10. Reasons For Restrictions,if Any:

Pump Power Monitors in bypass.

1his Month Yr to-Date Cumulative f

11. Hours in Reporting Period 672 1416 52296 t

l

12. Number Of Hours Reactor Was Critical 672 1416 33623.2
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 672 1416 32882.9
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1660729 3438674 73963629
17. Gross Electrical Energy Generated (MWH) 583219 1206204 25172821 556918 1151496 23896376
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100%

100%

62.9%

100%

100%

62.9%

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) -

102.2%

100.3%

58.0%

22. Unit Capacity Factor (Using DER Net) 100.5%

98.6%

55.4%

23. Unit Forced Outage Rate 0%

0%

25.2%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Refuel outace beginnine 3/19/83. sch'eduled to last 16 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A 2t,. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 I

COMMERCIAL OPERATION 3/13/77 8303160325 83d311 PDR ADOCK 05000302 R

PDR (9/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 3/2/83 COMPLETED BY D-Bocart TELEPHONE (904) 795-6486 MONTH February 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 810 17 832 2

822 gg 830 812 825 3

g9 4

832 20 825 5

816 23 833 830 834 6

22 h

7 833 23 832 8

828 832 24 831 9

gy 10 829 26 829 832 029 33 27 12 28

'829 13 839 29 832 14 30

~~

IS 834 3g 16 832 INSTRUCTIONS l

On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) e

O DOCKET NO.

50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 3/7/83 COMPLETED BY ff.W. Culver REPORT MONTH 2/83 TELEPHONE (9041 795-6486 f3

.!?

}

[

Licensee

,E*

1, Cause & Corrective No.

Date R

E8 a

.s 3 oc Event u?

o.

Action to

$E 5

j di g Report #

<#G u

Present Recurrence H

6 83-04 830205 F

H N/A N/A EA TRANSF Problem in the transmission system prevented it handling full load, reduced power to approx. 800 MWe.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I-Same Source (9/77)

Il Other (Explain) e

t MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 3/7/83 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH vnbruirv 198 't

SUMMARY

STATEMENT:

The unit operated at full power all month with the exception of one major power reduction.

~

l l

l l

I

=

l

-