OPERATING DATA REPORT DOCKET NO. 50-302 DATE 3/2/83 COMPLETED BY D. Bocart TELEPHONE (904) 795-6486 OPERATING STATUS Notes
- 1. Unit Name:
Crvaral River ifn4, 43
- 2. Reporting Period:
2/1/83 - 2/28/83 2544
- 3. Licensed Thermal Power (MWt):
890
- 4. Namepiste Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
825 850
- 6. Maximum Dependable Capacity (Gross MWe):
811
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N /A
- 9. Power Level To Which Restricted,if Any (Net MWe):
2475 MW thermal.
- 10. Reasons For Restrictions,if Any:
Pump Power Monitors in bypass.
1his Month Yr to-Date Cumulative f
- 11. Hours in Reporting Period 672 1416 52296 t
l
- 12. Number Of Hours Reactor Was Critical 672 1416 33623.2
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On.Line 672 1416 32882.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1660729 3438674 73963629
- 17. Gross Electrical Energy Generated (MWH) 583219 1206204 25172821 556918 1151496 23896376
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 100%
100%
62.9%
100%
100%
62.9%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) -
102.2%
100.3%
58.0%
- 22. Unit Capacity Factor (Using DER Net) 100.5%
98.6%
55.4%
- 23. Unit Forced Outage Rate 0%
0%
25.2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Refuel outace beginnine 3/19/83. sch'eduled to last 16 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A 2t,. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 I
COMMERCIAL OPERATION 3/13/77 8303160325 83d311 PDR ADOCK 05000302 R
PDR (9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 3/2/83 COMPLETED BY D-Bocart TELEPHONE (904) 795-6486 MONTH February 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 1 810 17 832 2
822 gg 830 812 825 3
g9 4
832 20 825 5
816 23 833 830 834 6
22 h
7 833 23 832 8
828 832 24 831 9
gy 10 829 26 829 832 029 33 27 12 28
'829 13 839 29 832 14 30
~~
IS 834 3g 16 832 INSTRUCTIONS l
On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) e
O DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 3/7/83 COMPLETED BY ff.W. Culver REPORT MONTH 2/83 TELEPHONE (9041 795-6486 f3
.!?
}
[
Licensee
,E*
1, Cause & Corrective No.
Date R
E8 a
.s 3 oc Event u?
o.
Action to
$E 5
j di g Report #
<#G u
Present Recurrence H
6 83-04 830205 F
H N/A N/A EA TRANSF Problem in the transmission system prevented it handling full load, reduced power to approx. 800 MWe.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I-Same Source (9/77)
Il Other (Explain) e
t MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 3/7/83 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH vnbruirv 198 't
SUMMARY
STATEMENT:
The unit operated at full power all month with the exception of one major power reduction.
~
l l
l l
I
=
l
-