Forward Minutes of 790830 Meeting W/Util in Reading,Pa Re Seismic Analysis Modeling
ML20069A252
Person / Time
Site: 05000000, Ginna
Issue date: 09/12/1979
From: Nelson T
LAWRENCE LIVERMORE NATIONAL LABORATORY
To: Levin H
Office of Nuclear Reactor Regulation
Shared Package
ML20069A188 List:
References
FOIA-82-399, TASK-03-06, TASK-3-6, TASK-RR EM79-746, NUDOCS 7909180332
Download: ML20069A252 (4)


Text

,

l i

- 43.

r

.,,.m,,

n1 3.,

LAViMENCE UVE MORE '_ABCRATOR' r

Drr9 746

)

l i

o i

September 12, 1979 y,

j h

. ~.4 Novard Levu

?'

t SystensticEvaluationProdrasBranch a.

.4 Division of Operating Reactors Offios.of plear. Seactori$agulation w g3 ~

W.S. Busfeer.Begulatory Consission "b>s g,a k u % i d, D.';C.;20955.

Heshiagten~ -

L -

a

~A d '

JDear Neward P " ?

4 "c

a L

y c Wi? *. f---

4 T 2'jpp" -

y;r: ! %30s August.30,1W9..$. Y. Lia,e r and I attended a meeting with asebester Oas 5%.f and Electrio' ama 084ert Assoaistes,~Ise. at needing, Fannsylvania.

We 1

G6mappfoofaded'theitrsiidor ' Kid 566peration in disonsasing the Ginna seisaie i

~

e fj '..ti; analysis modeling.

<M]is, d p,.

I y,. 5 g

M Jd[h t-information.' The everall eseoensos(sinutes,of[the meeting for your'>

[wt eodel was' essential to captunWrispiasi of this emeplex structum.

g

'" Qi

~

' 2 %*,

fc s' p

(.

. - v glaeopoly,

)

g g

vns g,2; <.g g,g,,,

.-4 4

j Strustiral gan h.,tica Gmup s.

Busteer Test Etagineerina Division i

j TAN:see j

[e, - /

n e,ener.y k

h-O. 8.lRg j

N(

C. T. Liaw, 3044 i

T. Cheng, WRC L

4 T. Weis. Im

[

I-C. Chen, Gilbert 7401b9 l

t L

D l

l o 5\\

c y

t'

$V

_ _. ~~

! lk q qaq w ; efc_ N R

(

t.

s,~.e, or :,.sen o o c n, m i,

-o,,

s..c

, m::

. ac e,;mue ::

. v : u-.m i : >..... v '

i

i e

r-v j

l 1

l I

Minutes on Ginna Meeting at Gilbert 8/30/79 I

i Discussed t.1.1. Seismic Model i

i l

Modeled all contributing beams and columns of turbine, auxiliary, an,:

~

2 i

intermediate buildings.

~

f

~Modeled diesel genkrator building as 4 springs in the N-S direction at.B. 270.

I Used original Gilbert model proper ies for concrete portions of N

auxiliary building and for control building, i.e., equivalent :>eas members.

D' "i

a

)

yf.

% vyn ? t

{

a Did not endel sorrios building, fuel pool, sub-tesement in j

a ~

internatiate building (below B '253), or emaillary building addition p/ ' :

at this time.

7 d,

..i a

[

y,~

  1. N, ;$'....

ra Floors are%R' rigid diaphragas modeled with mestar node at the C.G.

,e,,.

L T

Slave nodes are modeled cri the wall columns at their correct

~

I i

elevatica (i.e., betweis br'e' e points in some 1contions).

d c

e. 3 s..

s s

,.. c - 4 ; r..

T The slave;t.ie.to the coluent,ll'eiet prevent colmen rotation l

allow for rotation, assuming the floor beams and the floor itself wi y2?"

.. d'@;1td.1tR,7

'+

Three degress of freedom are provided at each floor master node.

i Maas at master rodes ineludes equipment, dead land, and aiding but no interior umils (yet). Rotational inertia is included in tartrine and s

auxiliary buildings.

'. +

p ny e.

t At presenE,lthe full area of both directions of the cross bracing is y

los3uded.

y..

The abord members of horisontal trusses 71, 72, and T3 are included as horisoetal beams in the east facade wall.

k.: :

i 1

l I

l t

I L

L I

i I

i

'Molb0 l

=

1 i

\\

l p

1 Discussed Questions Submitted to T

'a'e i s s V, E GAI provided drawings showing location of heavy equipment and tna r weights (note, this weight was previously included in unifor= load pmvided earlier which also included exterior wall weights).

Clarified uniform floor loadings.

Showed fabrication dr;svings for typical connections in turbine, 3

auxiliary and intermediate buildings. Beans are connected ty web

.,8 p

i angles to the columns in a shear connection.

Bracir.g members are

.y attached to gusset plates primarily by bolts. Where the bracing crosses, the angles ars cut and there are four connections to a

]

center plate.

In many cases the web angles were attached to the

%s beasa by welding then bolted to the coliaans in the field.

.t A

2 The providing of details for specific connections nas deferred until

'L9

+

LLL's analysis was complete and critical areas identified.

At that time, details on the connections in the critical areas would be W

reque sted. This was also the decision on the question of aseber Z

(

forces due to dead load.

p It was decided that LLL had sufficient information to model the 1

diesel generator building and control building. A set of plans were l

provided at the seeting.

l l

The concrete block walls in the intermediate building are sitting cm

.q l

girders and are olipped to the columns on 24' c/c. They are unreinforced and do not provide lateral stiffness. Their mass should

(

probably be included.

.g i

b."

i 7

It was felt that shear studs on girders were confined to semil local

[

j areas.

However, upon checking drawing fD-502-022, a note was found which states that "All girders and beams connecting to columns... to

'g aj have 3/4" o.d. welded studs..."

in the turbine building.

]

s The following safety related equipcent is located in the intermediate s

l building:

,;y J.

EL 273 ' & 278'-4*

4 steam line, feedwater line, and valves r

\\

i EL 296' containment isolation valve for purge systes

}

EL 315' filters for purge systa:

1 All Eleva tions Cable trays i

Also, the centrol roos Nuipment is located on f'oces suppcrted by

(

steel framing. These ites:s will seat likely experience amplified j

vertical excitation.

Thus, vertical spectra should te gunerated for t hem.

l

.u u 01 p.qyg.g..g_.

-J$-W

l l

Facade colwns en top of the turbine building wall ara

=w

.a::er than the building colt.mns. The splice at this juncture appars ts :e

}

a shear oonnecticn only.

The chords for the horisontal trusses fl, T2, and 73 are attached to the east facade wall coltans with four bolts through both flanges.

A field check was going to be conducted by RG&E to determine if any

,t..f i other horizontal members were present that were not shone on the

.J _

plans.

g' Plans for the " Super Wall" were sent by RG&E and were receivad at iLL f(

9/11/79 3'

Diecussed 011bert Model ff,

3

.1 %

The Gilbert model also includes all contributing beams and columns of g

the turbine, auxiliary, and intermediate buildings.

d

(

Includes a rough model of thei' service' building with rigid diaphragas connected to the ausilisry building diaphrases with a ocupied spring l

(in the form of a stiffness matrix).

j a.

r

.m Includes sub-basement of intermediate building.

'[ '

l L

Floors are rigid diaphrsgas eacept intermediate building whica is

?,

modeled with equivalent benas jros mass point at the o.G. to the fruming connections. The floor, diaphragas have six degrees of freedom.

r j

In g1neral, the asases of the floors were moved in elevation to k

eerrespond to those of braos points.

.?

i I

The connection of the floor members to columne is eensidered fixed due to the concrete placement around the coltans.

l 3

Eineestic condensation will be used (in STARDTIE) to reduce the gy k

number of (dynamic) degroes of freedom.

v.

@W

?

.. t l

Norisontal trusses in east faende wall omitted.

4 i

Model of internal structure (inside containment) is for piping input, not for l

analysing structurst integrity or equipment. They are trying to be conservative, perhaps too conservative for non-piping considerations. The l

equivalent sesber properties are still useful for our analyses. nerefore, we i

would like a copy of their model.

I I

i i

i l

i

< 101W

=

r: :

zrr:T~~~ :.

-