Procedure Q, Response to Void in Reactor VesselML20067D400 |
Person / Time |
---|
Site: |
Beaver Valley |
---|
Issue date: |
12/07/1982 |
---|
From: |
DUQUESNE LIGHT CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20067D395 |
List: |
---|
References |
---|
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.1, TASK-TM 1.6.4, NUDOCS 8212130245 |
Download: ML20067D400 (8) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212G1611999-09-22022 September 1999 Proposed Tech Specs,Requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing ML20212F6611999-09-20020 September 1999 Proposed Tech Specs,Revising Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 ML20210B8771999-07-15015 July 1999 Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by ML20210B8981999-07-15015 July 1999 Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115 ML20210B8401999-07-15015 July 1999 Proposed Tech Specs Revising Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 ML20209C1941999-06-28028 June 1999 Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196G3871999-06-22022 June 1999 Proposed Final Tech Spec Pages for LARs 259 & 131 ML20196F0191999-06-17017 June 1999 Proposed Tech Specs Pages for LARs 262 & 135 ML20196F6881999-06-17017 June 1999 Proposed Tech Specs Updating Heatup,Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 EFPYs ML20195K1821999-06-15015 June 1999 Proposed Tech Specs Pages for LAR 109 Re RCS ML20207E1851999-05-27027 May 1999 Proposed Tech Specs,Revising Frequency Notation for Manual Functions Specified in ESFAS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20207E2331999-05-27027 May 1999 Proposed Tech Specs 3/4.3.3.3,relocating Seismic Instrumentation Requirements to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20207E2081999-05-27027 May 1999 Proposed Revised Tech Specs for LARs 259 & 131,revising Qualifications for Operations Mgt & Incorporating Generic Position Titles ML20205H5121999-03-31031 March 1999 Proposed Tech Specs Changes to Index Page Xvii,Changing Wording of Title for Table 3.7-1.Table 3.7-2 Will Be Changed to Be Consistent with Title of Table 3.7-3 ML20211N6651999-03-25025 March 1999 Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing (IST) Program for Pumps & Valves ML20204E4381999-03-16016 March 1999 Proposed Tech Specs Bases Section 3/4.7.13,adding Wording Which Discusses Design Bases of Sys in Greater Depth ML20204E3851999-03-16016 March 1999 Proposed Tech Specs LCO 3.7.1.3,increasing Min Vol in Primary Plant DW to 127,500 Gallons,Adding New Footnote & Revising Wording Contained Action Statements ML20207K1331999-03-0303 March 1999 Proposed Tech Specs Changing Qualifications for Operations Mgt & Incorporating Generic Titles to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20207E6261999-02-26026 February 1999 Proposed Typed,Final Tech Specs Pages for LAR 111 ML20199G5431999-01-18018 January 1999 Proposed Tech Specs Re Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1 ML20198F9661998-12-24024 December 1998 Proposed Tech Specs Section 3/4.8.1, AC Sources, Clarifying EDG Fuel Oil Storage Requirements by Addition of Term Usable & Increasing EDG Largest Single Load Rejection Test Requirements ML20206N9541998-12-24024 December 1998 Proposed Tech Specs,Modifying Applicable Sections by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor ML20198D6711998-12-14014 December 1998 Proposed Typed,Final Tech Specs Pages for LARs 246 & 116, Consisting of Editorial Changes Due to Pagination,Changes Incorporated by Previous Amends & Corrected Typos ML20205F6961998-11-30030 November 1998 Revs to Offsite Dose Calculation Manual ML20211K6871998-11-30030 November 1998 Issue 2,Rev 1 to Inservice Testing (IST) Program for Pumps & Valves ML20155J0161998-11-0303 November 1998 Proposed Tech Specs Page 3/4 1-15,re Reactivity Control Sys ML20155B9681998-10-23023 October 1998 Proposed Final,Typed Tech Specs Bases Pages for LARs 260 & 133 Re Limiting Safety Sys Settings ML20154Q8021998-10-15015 October 1998 Proposed Tech Specs,Deleting Two License Requirements, Modifying One LCO Applicability,Modifying Three Definitions, Changing Action Statement Number & Deleting Meteorological Monitoring Spec ML20154Q4341998-10-15015 October 1998 Proposed Tech Specs,Adding Discussion That Explains Why Use of Time Constants,Expressed as Equality,Such as T = X Seconds,Are Acceptable ML20154D6381998-09-30030 September 1998 Proposed Tech Specs Re Revised Typed Bases for LAR 235 ML20154C6501998-09-24024 September 1998 Proposed Tech Specs Section 3.1.2.8,eliminating Potential for non-conservative Interpretation of Values of RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls ML20197C5711998-09-0808 September 1998 Proposed Typed,Final TS Pages Re Surveillance Requirements for LAR 235 ML20154D5241998-08-14014 August 1998 Issue 2,Rev 0C to Inservice Testing (IST) Program for Pumps & Valves ML20202G9831998-07-22022 July 1998 Issue 3,rev 2 to BVPS Unit 1 IST Program for Pumps & Valves ML20236S4921998-07-15015 July 1998 Proposed Tech Specs 3/4 3 Re Reactor Trip Sys & ESF Sys Instrumentation ML20236S2881998-07-13013 July 1998 Proposed Tech Specs Revising BVPS-1 UFSAR Pages 9.7-7 & 8 & BVPS-2 UFSAR Pages 3.6-11 & 12 Re Potential Flooding of Intake Structure Pump Cubicles ML20236P8051998-07-0909 July 1998 Proposed Tech Specs Revising TS 3.7.1.1, Svs, Incorporating Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory 94-01,dtd 940120 ML20236P7761998-07-0909 July 1998 Proposed Tech Specs 3/4 3-2,3/4 3-11 & B 3/4 3-1b,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors ML20249C4531998-06-23023 June 1998 Final Tech Specs Pages for LARs 256/126 ML20249C3161998-06-19019 June 1998 Proposed Tech Specs Modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements ML20248M1901998-05-19019 May 1998 Proposed Rev 2F to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves ML20247L3071998-05-14014 May 1998 Proposed Tech Specs,Final Pages for License Amend Requests 249/118 & 254/123,as Amends A-249,A-118,A-254 & A-123, Respectively ML20247J2851998-04-20020 April 1998 Alternative Request BV1-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (RC-R-1-C-8) ML20247J6761998-04-20020 April 1998 Alternative Request BV2-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (2RCS-REV21-C-4) ML20216J9771998-04-13013 April 1998 BVPS Unit 1,Cycle 13 Startup Physics Test Rept ML20248K3061998-03-20020 March 1998 Rev 1,Issue 3 to Inservice Testing Program for Pumps & Valves ML20237B9721998-03-19019 March 1998 Rev 1 to Procedure Npdap 2.14, Fitness-For-Duty for Duquesne Light Employees ML20216G7011998-03-17017 March 1998 Proposed Tech Specs,Revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section ML20216G1011998-03-16016 March 1998 Proposed Tech Specs Adding New LCO 3.0.6 to Section 3/4.0, Applicability ML20216G0801998-03-16016 March 1998 Proposed Tech Specs,Exempting Neutron Flux Detectors from Channel Calibr Requirements 1999-09-22
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211N6651999-03-25025 March 1999 Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing (IST) Program for Pumps & Valves ML20211K6871998-11-30030 November 1998 Issue 2,Rev 1 to Inservice Testing (IST) Program for Pumps & Valves ML20205F6961998-11-30030 November 1998 Revs to Offsite Dose Calculation Manual ML20154D5241998-08-14014 August 1998 Issue 2,Rev 0C to Inservice Testing (IST) Program for Pumps & Valves ML20202G9831998-07-22022 July 1998 Issue 3,rev 2 to BVPS Unit 1 IST Program for Pumps & Valves ML20248M1901998-05-19019 May 1998 Proposed Rev 2F to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves ML20247J6761998-04-20020 April 1998 Alternative Request BV2-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (2RCS-REV21-C-4) ML20247J2851998-04-20020 April 1998 Alternative Request BV1-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (RC-R-1-C-8) ML20248K3061998-03-20020 March 1998 Rev 1,Issue 3 to Inservice Testing Program for Pumps & Valves ML20237B9721998-03-19019 March 1998 Rev 1 to Procedure Npdap 2.14, Fitness-For-Duty for Duquesne Light Employees ML20249A8671998-03-0606 March 1998 Rev 1H to BVPS Unit 1 IST Program for Pumps & Valves ML20217K0591997-12-31031 December 1997 Offsite Dose Calculation Manual for Units 1 & 2 ML20217G7261997-12-15015 December 1997 Relief Request 1-TYP-2-B5.40-1,Rev 0 to Pressurizer Nozzle to Safe End Welds ML20202B2511997-10-0303 October 1997 Pressure Testing Program for Third Ten-Yr Interval at Bvps,Unit 1 & Second Ten-Yr Interval at Bvps,Unit 2,Relief Request BV3-IWA-2,Rev 1, Re Class 1,2 & 3 Bolting Removal Due to Leakage ML20217B2941997-07-0202 July 1997 Rev 0 to 1TYPP-3, ISI Ten Year Plan for Third Interval at Beaver Valley Power Station Unit 1. W/22 Oversize Drawings ML20140C0151997-05-30030 May 1997 Issue 2,Rev 0 to 2nd Ten-Year Interval Update of BVPS-2 IST Program ML20196G3181997-04-17017 April 1997 Rev 16 to IST Program for Pumps & Valves ML20137T2201997-04-0909 April 1997 Rev 8 to 2OM-53C.4.2.6.4(ISS1A), SG Tube Leakage ML20137T2331997-04-0909 April 1997 Rev 8 to 1OM-53C.4.1.6.4(ISS3A), SG Tube Leakage ML20148A9501997-03-21021 March 1997 Rev 0,Issue 3 to IST Program for Pumps & Valves ML20137G4551997-03-12012 March 1997 Relief Request BV2-B3.110-2,Rev 0 to Pressurizer Nozzle-to-Vessel Welds ML20137G4221997-03-12012 March 1997 Relief Request BV1-B3.120-2,Rev 0 to Pressurizer Surge Nozzle Inner Radius Section (RC-TK-1-RADIUS-6) ML20137G4081997-03-12012 March 1997 Relief Request BV1-RV-WELDS,Rev 0 to Reactor Vessel Circumferential Welds (RC-R-1-C-1 & RC-R-1-C-8) ML20137G4351997-03-12012 March 1997 Relief Request BV1-B9.31-2,Rev 0 to Reactor Coolant Sys Branch Connection Welds ML20137G4651997-03-12012 March 1997 Relief Request BV3-IWA-1,Rev 0 to Insulation Removal for Class 1 & 2 Bolted Connections Located Inside Containment ML20137G4591997-03-12012 March 1997 Relief Request BV2-D2.20-1,Rev 0 to Svc Water Sys Welded Attachments ML20137G4791997-03-12012 March 1997 Relief Request BV3-IWA-2,Rev 0 to Class 1,2 & 3 Bolting Removal Due to Leakage ML20137G4441997-03-12012 March 1997 Relief Request BV2-B1.11-1,Rev 0 to Reactor Vessel Lower Circumferential Weld (2RCS-Rev21-C-4) ML20141D2021996-04-26026 April 1996 Rev 14 to Updated IST Program Issue 2 ML20101L7871995-10-11011 October 1995 Unit 2 Offsite Dose Calculation Manual ML20096D3811995-09-26026 September 1995 Issue 1,Rev 15 to Beaver Valley Unit 2 Inservice Testing Program for Pumps & Valves ML20093D6751995-09-19019 September 1995 Rev 0 to BVPS SSFI Technical Assessment Plan for Unit 1 - Safety Injection Sys ML20096D3301995-07-24024 July 1995 Issue 2,Rev 13 to Beaver Valley Unit 1 Inservice Testing Program for Pumps & Valves ML20095B5171995-07-0707 July 1995 Proposed Rev 2E to BVPS Unit 2 IST Program for Pumps & Valves ML20095B5091995-07-0707 July 1995 Proposed Rev 1G to BVPS Unit 1 IST Program for Pumps & Valves ML20085J6021995-04-28028 April 1995 Issue 1,Rev 14a to BVPS Unit 2 IST Program for Pumps & Valves ML20085L0211995-03-24024 March 1995 Rev 12A,Issue 2 to Duquesne Light Co Beaver Valley Power Station Unit 1 IST Program for Pumps & Valves ML20078G9671994-09-30030 September 1994 Rev 13,Issue 1 to Beaver Valley Power Station Unit 2,IST Program for Pump & Valves ML20072Q9281994-07-18018 July 1994 Proposed Rev 2D to BVPS Unit 2 IST Program for Pumps & Valves ML20072Q9191994-07-18018 July 1994 Proposed Rev 1F to BVPS Unit 1 IST Program for Pumps & Valves ML20065S3781994-03-25025 March 1994 Proposed Rev 2C to Beaver Valley Power Station Unit 2 IST Program for Pump & Valves ML20029D8541994-03-25025 March 1994 Proposed Rev 1E to BVPS Unit 1 IST Program for Pump & Valves. ML20063H2051993-11-19019 November 1993 Rev 11,Issue 2 to Inservice Testing (IST) Program for Pumps & Valves ML20067A3261993-11-18018 November 1993 Rev 12,Issue 1 to Beaver Valley Unit 2 IST Program for Pumps & Valves ML20058P8591993-10-20020 October 1993 Bvps,Units Odcm ML20058P9231993-09-14014 September 1993 IST Program for Pump & Valves, Issue 1,Rev 11 ML20045E2291993-06-17017 June 1993 Odcm. ML20045E1201993-03-25025 March 1993 Issue 2,Rev 9 to Bvps,Unit 1 IST Program for Pump & Valves. ML20045E1191993-01-29029 January 1993 Revised Proposed Rev 1D to Bvps,Unit 1 IST Program for Pump & Valves. ML20116B3271992-08-24024 August 1992 Issue 1,Rev 10 to Inservice Testing Program for Pump & Valves 1999-03-25
[Table view] |
Text
9 6 e e c
G I
OPERATING MANUAL PROCEDURE Q RESPONSE TO VOID IN REACTOR VESSEL 4
4 1
- )
8212130245 821207 PDR ADOCK 05000334 PDR P
BVPS - OM 1.6.4 Q. Response to Void in Reactor Vessel This procedure describes response to a detected, or suspected void, (condensible, or non condensible) in the Reactor Vessel.
The specific accident which caused the void to be formed will not be discussed, instead, it will be assumed that a void exists regardless of the specific accident scenario.
Symptoms
- 1. Variations from the normal pressurizer pressure and level response due to normal charging and spraying operations.
The pressurizer level may decrease during a RCS pressurization from charging due to RCS void contraction, and level may rise rapidly during spray operations due to RCS void expansion.
- 2. Reactor Core Cooling Monitor (SCM-RC-100] or the Margin to Saturation Meter [ SCI-RC-100] indicate departure from sub-cooled conditions.
- 3. A plant evolution that may result in the introduction of significant amounts of non condensible gases to the RCS, such as accumulator tank discharge has occured.
Automatic Actions - None Required.
Immediate Manual Action - lbne Required.
Follow Up Actions A. If the symptoms of a Reactor Coolant System Void Exist, attempt to determine the void size as follows:
- 1. Achieve a constant pressurizer level and pressure condition.
- 2. Place the RCS wide range pressure, and the pressurizer level on trend recorders. The scale for i pressure should be 150 psig pressure and for level,10%
of pressurizer span.
I 3. Record the following parameters.
- a. RCS Pressure PSI
- b. PZR Level %
- c. Charging Rate GPM
- d. Total Seal Injection Flow GPM
- e. Total Seal Leak Of f Flow GPM 1
- f. Time Readings Taken
BVPS-0M 1.6.4
- 4. Isolate the RCS letdown flow, turn off all pressurizer heaters, and terminate the pressurizer spray.
- 5. Allow the RCS charging ficw to either increase RCS pressure 100 psi or increase pressurizer level 5% of span.
- 6. Record the RCS pressure, pressurizar icval and time at the completion of the charging transient.
- a. RCS Pressure PSI
- b. PZR I4 vel %
- c. Time Readings Taken
- 7. Reinitiate F.CS letdown flow and restore normal pressurizer pressure and level control.
- 8. Calculate the initial and final pressurizer vapor space volumes as follows:
r sudzer =
,fa g (1-PZR. Level % x 528 FT *)+200 FT **
3
= FT
(,,I y,
= (Initial Volume)-(Change in PZR I4 vel x 528 FT *)
3
+200Fh**
, g
- 9. Determine the total volume of water charged to the RCS as follows:
Charged Volume =
(Charging Flow Rate Seal Injection Flow Rate, Seal Leak Off Flow Rate)
[ Step 3.c.] [ Step 3.d.] [ Step 3.e]
X Elapsed Time X 1
[Diff. Step 6.c. and 3.f.] 7.45 GAI,.
FT' 3
= FT
- 10. Calculate the expected change in pressurizer level from the volume charged as deteremined in Step 9.
3 100 %
Expected (Step 9.] Vol. FT ) X ( 528 FT **}=
Pressurizer, (Charged 3 Level Change
- A Voldme of pressurizer spanned by level instruments
- Volume of pressurizer above spanned level
g -
L',
~
BVPS-0M
\
/ j 5,,
J
- 11. If the actual pressurizer level change is less than the expected level change then a gaseous void exists in the ,
RCS. Perform step 12 to determine the volume of the RCS ~
void. '
^
12.
The initial and final RCS gaseousevoid volumes can be cal-
/, /
culated from the ,following equations: ,' h ,, <
- o Initial RCf'"(Cha'rgedVo1U'I" *1 Y"E # Y 1"*" Final Vapor Volume Void
- [ Step 8] Mtep 8'
[ Step 9]
( Initial Pressure. (Step 3? )
/'
~
g' Final Pressure [ Step 6] / ,
3
= FT
FM RCS (Initial CS V id' ) 4 Void
=
[ Determined Above} [ StepX (I 3] itial Pressure) ,
(Final Pressure) ,
[ Step 6.a.L '#
- B. If a gaseous void is indicated by perfonnance of Step A, attempt '
to condense the void as described below. This attempt will g
ultimately succeed if the RCS void 'is steam.
- CAUTION: Do not stop any running RCPs or start any stopped <- *1 ~ t RCPs until completion of this procedure. , ,
, p
- 1. Record RCS pressure as indicated by trend recorder. '
RCS Pressure __ PSI
'( .s )
- 2. Verify that the RCS is in a stable condition by eradring that:
- a. Pressurizer level is between 40% and 60% ,' j] ^.g
- b. RCS pressure is stable '
j f, ,
- c. RCS hot leg temperature is st&ble ,,
i r,
These stable RCS conditions must be achieved prior to '
) /,
proceeding with this procedure.
f <
- 3. Turn on all pressurizer heaters and increase' RCS pressure 50 psi while maintaining a balanced charging arid letduwt flow I and while maintaining pressurizer
- level greater tFan 20%. -
/
W NOTE: If pressurizer level drops below 20% of span, turn off the pressuri::er heaters and return the RCS to the stable conditica described in Step 2.
j .c '
('
),
i '
,=- , ,
f A [
)
, y
. s 5
n.
/
. 's
)
[
BVPS-0M 1.6.4 a
'j '
- 4. Af ter raising RCS pressure 50 psi, perform step A to determine if the attempt to condense the steam bubble
, 1.hss been effective.
t 3
- a. If no further indication of an RCS void exists,
, 'this procedure is complete.
, b. If a RCS void is still indicated it umst be assumed
, ,the void consists of non condensible gas, and an
? RCS vent is required.
, /
/ C. Preparation of Containment for Vessel Head Vent.
(
- 1. Verify the Containment Purge and Exhaust system is not in 6
~
i operation, and is isolated.
t .
/'}'
C i
/
\ ,- i 2.- St2rt all available containment air circulation equipment.
I ( *
- 3. Monitor containment hydrogen concentration and if required place the hydrogen recombiners in operation ou BVPS 0.M.
Chapter 46 Sect. 4 Procedure A, B and C.
D. Determine Maximum Allowable Venting Period as follows:
- 1. Convert the containment free-volume to containment volume
, at standard temperature and pressure conditions.
Cont. Pressure ** 492 'R
, ('ont. Volume (STP)=[1,890,000 FT *] X [ 14. 7 PSIA ] X [ Cont. Temp.***]
~
=
FT
- 2. Recor,d the containment hydrogen concentration.
H2A-HY-101A' % H2A-HY-101B %
' ,~ 3. Calculate the maximum hydrogen volume that can be vented to j the containment which will result in a containment hydrogen concentration of less than or equal to 3 percent volume.
Cont. H Conc % Cont. Vol.
Max. H 2
Vol.= (3.0% - [Highes$ Reading from Step 2. ]) x ([ Step 1.])
l 10 0 %
, g 3
- 4. From Curve #1 (RCS Pressure vs. H2 Flow Rate) determine the allowable venting period which will limit the containment s hydrogen concentration to 3% volume.
Max. H p
VentingPeriod=[ Step $] Vented =
Mins.
~ H Flow Pete lberve#1]
- Containment Volume = 1,890,000 FT
- If containment pressure has increased above 14.7 psia then use
}
14.7 psia as pressure for conservatism.
- Temperature in degrees Rankine (*F + 460)
- l l
.- , . - - - . ~ _ -- _ _ , -.
,' BVPS-0M 1.6.4 E. Vent Termination Criterion.
- 1. If any vent termination criterion listed below is reached or exceeded while venting, immediately stop venting.
- a. Containment hydrogen concentration greater than 3%
as observed on Containment Hydrogen Analyzers [H2A-HY-101A or 101B].
- b. Reactor Coolant Sub-cooling decreases below 50* as determined from Figure 53-1 or 53-1A.
- c. Pressurizer level decreases below 20% of span.
- d. Maximum vent duration determined in step D.4. is reached.
- e. Expected vent duration determined by Curve 1 and the RCS void volume calculated in Step A.12.
- f. RCS pressure decreases by 200 psi.
NOTE: Venting of hydrogen to containment through the direct path or through a ruptured PRT rupture disc will cause an increase of containment hydrogen concentration. If large quantities of hydrogen must be vented, the recom-biners must be in operation and even then hydrogen con-centration may approach combustible levels. If the concentration approaches combustible levels, the decision will have to be made to continue venting, or to secure venting until containment hydrogen levels decrease. The decision to continue venting should be based on full con-sideration of all plant conditions including the status of core cooling and containment hydrogen level.
Venting the reactor vessel should take priority over containment hydrogen limits due to the potential for interruption of core cooling with hydrogen in the vessel.
Venting the pressurizer should not take priority over containment hydrogen limits unless the pressurizer bubble is interferring with the ability to maintain pressure control.
F. Determine the optimum vent path using the following guidelines.
- a. With only one power source available, vent through the powered solenoid valves to containment.
- b. With power available to both valves and the PRT rupture disc blown, vent to the PRT if there is water in the tank to take advantage of the cooling provided by this water.
- c. If there is no water in the PRT, vent to atmosphere.
The location of the atmospheric vent will provide more complete mixing with the containment atmosphere and quicker access to the hydrogen recombiners.
~
, , BVPS-0M 1.6.4
- d. With power availcble to both paths and the PRT rupture disc intact, small quantities of gas may be vented to the PRT snd thus not enter the containment atmosphere.
- e. Large quantities of gas should be vented directly to containment.
G. Vent the reactor vessel as follows:
- 1. Increase the RCS subcooling to 50* as determined from Figure 53-1 or 53-LA by either initiating an RCS pressurization or by dumping steam from the non-faulted steam generators.
- 2. Isolate letdown and manually control charging to raise pressurizer level to greater than 50% and less than 90% of span.
CAUTION: The venting operation may result in pressure dropping below the SI setpoint.
- 3. Manually block the low pressure SI circuit if RCS pressurizer is less than 2000 psig, and the "PZR SI BLOCKED" status light is illuminated.
CAUTION: The circuit will be automatically unblocked if the RCS pressure increases above 2000 psig. If this occurs, the blocking will have to be repested when pressure is again reduced below 2000 psig.
- 4. Immediately before initiating vessel vent, manually raise charging flow to maximum. This limits the pressurizer pressure and level decrease during the vent.
- 5. Vent the reactor vessel to containment or the PRT by opening:
- a. [SOV-RC-102A or 102B] Reactor Vessel Vent Valves and
[SOV-RC-104] Vent to PRT Isolation Valve jyt [SOV-RC-105]
Vent to Containment Isolation Valve.
i 6. Stop venting by shutting valves opened in previous step when
- one of the vent termination criterion is met.
- 7. Return RCS pressure control and PZR level control to normal.
Verify RCS is stable.
- 8. When vent is complete and RCS is stable perform step A.1-12.
to determine the effectiveness of the vent on void removal.
If RCS void is still indicated repeat steps D, E, F and G until no further voiding is indicated.
.r. ..
2000 . -
BVPS-OK..' 1.6.4 CURVE #1 1500 _
E v
- a 3 1000 -
- w d
i x c.,
m
. o M
I l
t i
500 -
4 f
j r
- l 1000 2000 3000 4000 '000 5
HYDROGEN H 0W iLATE
(
-- -. SCn!).
. -._____-... . _ .