ML20067C494

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 3.6.6.3 Re Containment Atmosphere Oxygen Concentration
ML20067C494
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/06/1982
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20067C493 List:
References
NUDOCS 8212100085
Download: ML20067C494 (1)


Text

b i

CONTAINMENT SYSTEMS OXYGEN CONCENTRATION LIMITING CONDITION FOR OPERATION 3.6.6.3

be less than 4% by volume during the period from:

a.

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER > 15% of RATED THERMA'L POWER, to b.

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to a scheduled reduction of THERMAL

~ POWER to < 15% of RATED THERMAL POWER.

APPLICABILITY: CONDITION 1.

ACTION:

With the oxygen concentration in the primary containment exceeding the limit, be in at least STARTUP within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.6.3 The oxygen concentration in the primary containment shall be i

verified to be within the limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER

> 15% of RATED THERMAL POWER and at least once per 7 days thereafter.

  • For the period commencing at 1800 on December 6,1982, a temporary exemption is allowed to operate BSEP-2 in Condition 1 with contain-3 ment oxygen concentration exceeding 4% by volume for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

l 8212100085 821206 PDR ADOCK 05000324 P

PDR l BRUNSWICK-UNIT 2 3/4 6-29

.