OPERATLNG DATA REPORT 50-317 DOCKET NO.

DATE 11/15/82 COMPLETED BY Elaine lotito TELEPHONE 1301)78L5363 OPE RATING STATUS Notes

1. Urd: Name: Civert Clif fs #1 October, 1982 L Reg ortereg Period.

2,700

3. Licenwd Thermal Power a\1Wt1:

0

4. Nameplate Rating (Gross Sibe r
5. Design Electrical Rai:ng iNet \1heI:
6. Maximum 1]ependable Capacity (Gross MWet:

E

7. Maximum Dependab!c Capacity (Net MWe);
8. Il Changes Oecur in (.apseity Ratings illems Nurnber 3 Throgh 7) Since Last Report. Gise Reasons.

9 Poaer Lese! To which Re. icted,if Any INet Alba:

10. Reasor.s For Re>triefe:a. !! Any :

This Month Yr -to Dat.- Cumubtive i1. t! curs In Reporting Period 745.0 7.2%.0 . 65.605.0

12. Numter Of Iloun Resetor Was Critical 745.0 5,055.3 51,655.0
13. Reactor Resene Shutdown !!ours 0.0 3.1 1,795.5
14. Ifours Generator On Line 745.0 __

5,000.6 50,602.3

15. Unit Resene Shutdown flours 0.0 0.0 ,_,,

0.0 -

16. Gross Thermal Energy Generated (MWill 1,W8,804 12,997,539 122,917,017 .
17. Gross Electrical Energy Generated (%1Will D7I'198 -

4,733,464 __40,727,461 t)4), i20 4,l'.1,159 38,443,192

18. Net Electrical Energy Generated IMWill
19. Unit Senice Factor 100.0 63.5 77.1
20. Unit Availability Factor 100.0 68.5 77.1
21. Unit Capacit y Factor (Using \fDC NetI --

105.1 68.8 72.3

22. Unit Capacity factor IUsmg DER Ner 102.6 67.2 69.4
23. Urit Forced Outage Rate 0.0 5.8 8.6
24. Shutdowns Scheduled Over Nest 6 Montin (Type. Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi. Forecast Achiesed INITIA L CRITICA LITY _

INITIA L ELECTRICITY COMMERCI AL OPER ATION R

(t j

. . )

OPER ATING D A T A REPORT DOCKET NO. W318 DATE 11/15/82 COMPI.ETED BY Elaine Iotito TELEPflONE T30T) /s/-y303 OPERATING STATUS N 8"

1. Unit Name: Clavert Cliffs #2 October, 1982 2 Herortmg Period.
3. Li:ensed Thermal Pow er 131Wti; 2,700 911 '
4. Nameplate Rating (Grw \then 845 l S. Des 4n Elestrical Raimg (Nec Muc h
6. Matimum Dependable Capacity (Gross Mbek 860 825
7. Maximum Dependible Capacity (Net Much
8. If Changes Occi.r in tapaat) Ratings iltems Ner,ter 3 Throt.ph 7) Sinse Last Repost.Gise Reasons.
9. Pouct Lesel To bhich He.t6cted. If Any (Net Af h d:
10. Reasons For Re>tna tras. If Any : _

1his Enth Yr.-to.Date Ct.rnulative 745.0 7,296.0 48,960.0

11. Ilot.rs in Reportin;; Perm..1 362.8 6,532.9 42,100.9
12. Number Ot' Houn Reactor Was Critial 13 Reactor Reune Shutdown liours 0.0 81.0 795.2 361.8 6,498.5 41,542.9
14. Ifours Generator On Line 0.0 0.0 0.0
15. Unit Resene Shutdown linurs
16. Gross Thermal Energ) Generated (Mkill 848,820 16,176,201 102,220,757 .

269,611 5,240,801 33,656,204 17 Gross Electrical Energv Generated (MWill ~

252,797 5,004,951 32,090,762

16. Net Electrical Energy Generated (MWili _

.! 48.6 89.1 84.9

19. Unit Senite factor 48.6 89.1 84.9
20. Un'. A>:alability Factor 41.1 83.1 80.1
21. Unit Capacity Factor iUsing \lDC Neti 40.2 81.2 77.6

) 22. Urit Capacity Tsetor ICsia DER Nett _

l 0.0 6.0 5.5

23. Ucit I orced OutJhe Rate
24. ShutJawns Scheduled Oscr Sest 6 Montin i Type. Date, ard Duration of Exhl No. 2 Plant is on a planned outage frcxn 10/17/82 until 2/14/83 for reactor refueling, unit general inspection and condenser retubing.
25. If Shut Down At End Of Rep..rt Perm L 1stimated Date of Startup: 2/14/83 26 Units In Test Status (Prior to Commercial Oper tion) Forecast Achiesed INITIA L CRIT!C 4 LITY

!NITI 4L El EC TRiCITY C0\f st ERCl 4 L OPER A TION (9/77)

r

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50.-317 Calvert Cliffs #1 DATE COMPLETED BY Elaine latito TELEPHONE (301) 787-5363 October 1982 MONTil DAY AVERAGE ILY I'OWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net!

3 865 g7 867 2 E g 866 3 865 868

, 9 I 4 E 20 873 a

5 E 21 875 6 865 877 22 7

865 879 23 8

E 863 74 9 865 861' 25 10 8D 9 l 26 867 881 ll 27 12 E7 881 j 28 13 866 875 29 14 30 E  %

15 3g 16 865 INSTRUCTIONS On this format,hst the aserage daily unit power levelin MWe Net for each day in the rey.rting month. Compute to

the nearest whole megawatt.

I l

(9/77)

I

-o., .... .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50.-318 UNIT Calvert Cliffs #2 DATE 11/15/82

' COMPLETED BY Elaim Lotito TELEPf!ONE (301) 787-5363 MONTil October, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.

(MWe-NetI (MWe Neti I 685 -

17 706 -

2 18 3 672 -

19 4 675 -

20 5 720 -

21 718 -

6 22 798 J 7 23

' 786 _

8 9 730 _.

10 630 -

- 26 623 _

11 p 12 N -

! 28 I3 809 _

14 7M -

30 670 _

IS 3i __

16 INSTRUCTIONS On this format, list the average daily unit power level in MWe. Net for ea:h da) in the reporting month. Compute to the nearest whole megawatt.

(4/77) a

DOCKETNO. #I7 Gilvert Clitis gl -

UNIT SHUTDOWNS AND POWER REDUCT10NS UNIT NAME DATE 11/15/82 t ber 1982 COMPLETED BY Elaine totito REPORT MONTil TELEPHONE (301) 767-5303

e. -
, .$E 3 h E) Licensee ,Ev.

aT b

8.4 Cause & Corsective Action to Nii. Date R 5? 5 2 s cE Esent

  • Report , gc Ed Prevent Recurrence

$E cE e~5g

~

o o

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A Fquipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2-Manual Scrara. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulator) Restriction 4sContinuation Ol6l)

E-Operator Training A Ucense Esamination 5-Load Reduction F Admimstrative 5 9-Other Exhibis 1 Same Source G-Operational Error (Explam)

PJ/77)  !!4)ther ( Explain) i

DOCKET NO. 50.-318

  • UNIT SliUTDOWNS AND POWER REDUC 110NS UNIT NAME Calvert clitts #2 DATE 11/15/82 O COMPLETED BY Elaine lotiro REPORT MONT11 ctober 1982 TY.LLPHONE (301) 787 530 e.

- E c

.$? 3 j E~ Licensee [v, ja. Cause & Corrective M. Date h g { jg5 Event g? g3 Action to W yE 5 j ;f, g Report a mV g' Prevent Recurrence 6

82-09 821016 S 745.0 C 1 XX Fuel XX Reactor refueling, unit general inspection and condenser retubing.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S. Scheduled A-Equip:nent Failure (Explain) I Manual for Prepasation of Data B-Maintenance of Test 2-Manual Sciam. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporI (LE R) File (NUREG-D-Regulatory Restriction 4_ Continuation 0161) l' Operator Training & License Examination 5-Load Reduction F Administrative 5 9-Other Exhibit I - Same Source G-Operational Error (Explain)

(9/77) 11 Other ( E xplain)

9 November 9,1982 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. I
2. Scheduled date for next Refueling Shutdown: October 1,1983
3. Scheduled date for restart following refueling: December 11,1983
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

June 29,1983

6. Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 656 Spent Fuel Pcols are common to Units 1 and 2 l 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel j assemblies.

1830 Licensed 1358 Currently Installed l 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off loud.

April,1991 l

l 1 - . , . . . . _ . . - - - - -. . , - - . - - - - - . - - - - -.

November 9,1982 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2. Scheduled date for next refueling shutdown: October 15,1982.
3. Scheduled date for restart following refueling: January 12,1982.
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?

Resumption of operation af ter refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

October 11,1982

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 656 Spent Fuel Poolis common to Units 1 and 2.

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

1830 Licensed 1358 Currently Installed

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE OCTOBER 1982 10/1 At the beginning of this reporting period, Unit I was operating at 890 MWe with the reactor at 100% power.

10/10 Decreased load to 735 MWe at 0210 to test main turbine control valves.

Resumed fullload operation (895 MWe) at 0500.

10/24 At 0145 load was decreased to 750 MWe for main turbine control valve testing.

Load was increased to capacity (905 MWe) at 0530.

10/25 Decreased load to 740 MWe at 2240 to clean main condenser water boxes.

10/26 Resumed full load operation (915 MWe) at 0700.

10/31 At 0100 load was decreased to 815 MWe to clean main condenser water boxes.

Load was increased to capacity (905 MWe) at 1100. At the end of this reporting period, Unit I was operating at 905 MWe with the reactor at 100% power.

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE OCTOBER 1982 10/1 At the beginning of this reporting period, Unit 2 was operating at 720 MWe with the reactor at 85% power while investigating saltwater leakage into the main condenser.

10/6 Increased load to 840 MWe at 0500. Decreased load to 705 MWe at 1050 to remove a condensate demineralizer vessel from service.

10/7 Load was increased to 840 MWe at 0254. Remained at this load due to vibration problems with 22 Main Feed Pump.

10/8 At 1325 load was reduced to 705 MWe to investigate saltwater leakage into the main condenser. Resumed full load operation (850 MWe) at 2100.

10/9 At 1700 load was reduced to 615 MWe to investigate saltwater leakage into the main condenser.

10/12 Resumed full load operation (865 MWe) at 2200.

10/13 At 0600 load was decreased to 850 MWe due to high main condenser circulating water delta T. At 1900 load was decreased to 825 MWe due to high main condenser circulating water delta T.

10/14 At 2300 load was decreased to 700 MWe due to high main condenser circulating water delta T.

10/16 The unit was taken off the line at 0148 in preparation for the 4th scheduled refueling outage. The Reactor was shutdown at 0250. The Reactor was placed in cold shutdown at 2000.

10/19 Completed draining the Reactor Coolant System at 0400.

10/31 At the end of this reporting period, Unit 2 was shutdown for its 4th scheduled refueling outage.