Monthly Operating Rept for Jan 1991 for Vermont Yankee Nuclear Power Station
ML20066G673
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/31/1991
From: Murphy W, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VYV-91-026, VYV-91-26, NUDOCS 9102200013
Download: ML20066G673 (6)


Text

,

w YERhiONT YANKEE NUCLEAR POWER CORPOR ATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 February 10, 1991 VYV 91-026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 DeTr Sir:

Submitted herewith is the Monthly Stctistical deport for the Vermont Yankee Nuclear Power Station for the month of January, 1991.

Very truly yours, l

VERMONT YANKEE NUCLEAR POWER CORP.

cW

"')! )

Warren P.

Mu hy

(/

Senior Vice resident, Operations cc:

1) USNRC Region I 475 Allendale Road King of Prussia, PA 19406
2) USNRC Resident Inspector, VYNPS DP 0411 Rev. 3 Page 1 of 1 9102200013 910131

[

1f PDP ADOCK O*000271 2t R

PDR

/f l

i l

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 91-01 FOR.THE MONTH OF JANUARY, 1991 l

DP 0411 Rev. 3 Page 1 of 1

OPERATING DATA REPORT

[

DOCKET NO.

50-271 DATE 910210 COMPLETED BY UTA. Wallin TELEPHONE (802)257-7711.

OPERATING STATUS 1.-

Unit Name:

Vermont Yankee NOTES:

2.

Reporting Period:

January _

3.

Licensed Thermal Power (MWt):

1593 4.

Nameplate Rating (Gross MWe):

540 5.

Design Electrical Rating (Net MWe): 514(oc) 504(cc) 6.

Maximum Dependable Capacity (Gross MWe):-535

'7.

Maximum Dependable Capacity (Net MWe):

'504-8.

If changes occur in capacity ratings (Items Number 3 through 7)since last report, give reasons:

N/A 9.

Power level to which restricted, if any(Net MWe):

N/A 10.

Reasons for restrictions, if any:

N/A This Month Yr-to-Date Cumulative 11.

Hours In Reporting Period 744.00 -

744.00 159264.00 12.

Number Of Hours Reactor was Critical

'744.00 744 00 128932.63 13.

Reactor Reserve Shutdown Hours-0.00 0.00 0.00 14.

Hours Generator On-Line 744.00 744.00 126115.60 15.

Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.

Gross Thermal Energy Generated (MWH)1158937.50 1158937.50 186474242.50 17.

Gross Electrical Energy Generated 390987.00 390987.00. _62138482.00 18.

Net Electrical Energy _ Generated (MWH)375133.00-375133.00 59007103.00

- 19.

Unit Service Factor 100.00-100.00--

78.35 H

20.

Unit Availability Factor 100.00

-100.00 78.35

21. ' Unit Capacity Factor (Using MDC Net) 100.04 100.04 72.73 22.

Unit Capacity Factor (Using DER Net) 98.10 98.10 71.32 L 23.

Unit Forced Outage Rate 0.00 0.00 5.49

-24.

Shutdowns scheduled over next 6 months (Type, Date, and-Duration-of Each): N/A l

25.

If shut down at end of report period,. estimated date of startup: N/A-26.

Units In Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL. CRITICALITY INITIAL ELECTRICITY i

COMMERCIAL OPERATION VYDPF 0411.01

'DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.19F

a q

l AVERAGE DAILY-UNIT-POWERLLEVEL-

- DOCKET NO.:50-271 q

UNIT ' Vermont Yankee.

D

-j DATE '910210

-COMPLETED BY' G.A. Wallin TELEPHONE (802)257-7711 MONTH

' January; 1

1 DAY AVERAGE DAILY POWER LEVEL DAY-' AVERAGE DAILY POWER LEVEL-'

(MWe-Net)-

(MWe-Net)

. [

' 1'.

517

'17..

517'

]

p 2.

517-18.

516' 3.

517 19.

517-4.

517-20.

516c 5.

517

21. --

516 6.

516

-22.'

516;

.i 7.

-516 23.

516 8.

517 2 4. -

518 9.

516

'25.

516 i

10.

-516 26.

516-

-11.

516 127.

516 i

L

~12.

516 28.

296 l

13, 516 29.-

361.

14. -

516

'3 0.

513-15.

516 31.

516-i l

l-16, 516 l-

. INSTRUCTIONS:

10n this format, list-theLaverage daily: unit: power. level in MWe-Net 3

~for each day.in theireporting; month.

Compute toLtheEnearest.whole T

L megawatt.

V_YDPF 0411.02 DP-0411-Rev. 3 Page:1 of-1

--RT No. 13..FOl~..18V.

!=

+

t i

h

..,.. ~,,,,, -.. -

.e,~.,---,ww..~..

...,..--..-,,--,-*,..-~.--a...

~..

,,,~.,~.-....~.~.a

l UNIT SHUTDOWNS AND POWER REDUCTIONS 4

i DOCKET NO 50-271 l

REPORT MONTH JANUARY UNIT NAME Vermont Yankee i

DATE 910210 l

COMPLETED BY G.A.

Wallin TELEPHONE (802)257-7711 1

1 2

Metnod of License system component Cause and corrective No.

Date Type.

Duration Reason Shutting Down Event Code Code Action to thours)

Reactor 3 Report #

4 5

Prevent Recurrence 91-01 910128 s

0.00 BH N/A N/A RS CONROD Turbine bypass valve testing, rod pattern exchange and scheduled maintenance.

1 F: Forced 2 Reason:

3 Method:

4 Exhibit G-Instructiocs St Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)' (NUREG 0161)

E-operator Training and License Examination F-Administrative 5 Exhibit I - Same Source VYDPF 0411.03 G-Operational Error (Explain)

DP 0411 Rev.

3' H-(Explain) - Rod pattern exchange Page 1 of 1

1 "8'

DOCKET NO. 50-271 UNIT Vornont'Yonkoo DATE 910210 COMPLETED BY G.A. Wallin TELEPHONE (802)257-7711 REPORT MONTH January

SUMMARY

OF OPERATING EXPERIENCES Highlights Vormont Yankeo operated at 97.8% of rated thermal power for the month.

Gross electrical generation was 390,987 MWHe or 97.3% design electrical capacity.

1 Op3 rating Summary The following is a chronological description of plant operations including othat pertinent items of' interest for the month:

At the beginning of the reporting period the plant was operating at'99.9%

of rated thermal power.

910128 At 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br />, initiated a power reduction to 50% flow to perform turbine bypass valve testing, a rod pattern exchange and scheduled maintenance on the 4B feedwater heater.

910128 At 0257 hours0.00297 days <br />0.0714 hours <br />4.249339e-4 weeks <br />9.77885e-5 months <br />, at 79% power initiated turbine bypass valve testing.

(See Unit Shutdowns and Power Reductions) 910128 At 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br />, completed turbine bypass valve testing.

Reducing power to 50% flow.

910128 At 0354 hours0.0041 days <br />0.0983 hours <br />5.853175e-4 weeks <br />1.34697e-4 months <br />, at 50% flow, initiated a rod pattern exchange.

(See Unit Shutdowns and Power Roductions) 910128 At 0517 hours0.00598 days <br />0.144 hours <br />8.54828e-4 weeks <br />1.967185e-4 months <br />, completed the rod pattern exchange. ' Remaining at 50% flow until 4B feedwater heater repairs are complete.

910129 At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, completed 4B feedwater heater repairs and a return to Zull power was initiated.

1 At the end of the reporting period the plant was operating at 99.9% of rotod thermal power.

VYDPF 0411.04 DP 0411 Rev. 3 PGgs 1 of 1 RT No. 13.F01.18X l