YlltOINIA El.ncTuic Axn Pownu COMPANY lllCit M ON'), Vi tt u t NI A 202G1 February 14,1991 U. S. Nuclear Regulatory Commission Serial No.91-078 Attention: Document Control Desk NL&P/JMJ:jm]
Washington, D.C. 20555 Docket Nos.
50 338 y
4 h
50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operatirg Report for North Anna Power Station Units 1 and 2 for the month of January 1991.
Very truly yours, 17/ /6 1 y
- W. L. Stewart -
- Senior Vice President - Nuclear Enclosures-cc:
U.S. Nuclear Regulatory Commission-101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser
.NRC Senior Resident inspector North Anna Power Station f.
IEa+
4L
.1
+
i
+
VIRGINIA-POWER COMPANY.
' NORTH' ANNA-POWER STATION MONTHLY-OPERATING REPORT
_MONTHt. January
-YEAR 1 1991 l
Approved:
g'.
/Stfati'on Manager r:
a
DOCKET No.:
50 338 DATE: February 4, 91 COMPLETED BY:
C. Mladen PHONE: (703) 894 2537 OPERATING STATUS 1.
Uni t N ame s................................ Nor t h Anna 1 2.
R eport i ng Per i od t........................ January 1991 3.
Licensed Thermal Power (MWt).............
2,893 4 Nameplate Rat ing (Gross MWe).............
947 5.
Design Electrical Rating (Net MWe):.......
907 6.
Maximum Dependable Capacity (Gross MWe)..
959 F.
Maximum Dependable capacity (Net MWe)....
911 8.
If changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe): _ N/A
-10. Reasons for restrictions, if any:
N/A This Month YtD Cumulative
- 11. Hours in Reporting Period...............
744.0 =
744.0 110,556.0
- 13. Number of Hours Reactnr was Critical....................
264.9 264.9 80,255.8
- 13. Reac tor Reserve Shutdown hours...........................
4.5 4.5 6,608.1
- 14. tlours Generator 0n-Line..................................
264.9 264.9 77,484.9
- 15. Uni t Reserve Shut down Hours..............................
0.0 0.0 0.0
- 16. Groso Thermal Energy Generated (MWH)....................,. 330,095.7 330,095.7 205,316,331.7
- 17. Gross E lec t r i cal ~ Energy Generat ed (MW4 )..................
106,174.0 106,174.0 67,447,512.0
- 18. het E l ect r i cal Energy Genera t ed (MWH)....................
96,3M ^
96,374.0 63,825,126.0
.19. Unit service factor......................................
35.6%
35.6%
70.1%
- 20. Uni t Avai labi li t y F ac tor................................
35.6% '
35.6%
70.1%
- 31. Unit Capacity Factor (using HDC Net).....................
14.2%
14.2%
64.5%
- 23. Unit Capacity Factor (using DER Net).....................
14.3%
14.3%
63.7%
23r F o r c ed Ou t a g e R a t e.......................................
0.0 0.0%
12.5%
- 24. Shutdowns. Scheduled Over Next 6 Months -(Type, Date, and Duration of Each):
_ 60 day Refueling Outage ccamonced 1/12/91
- 25..If Shutdown at end of Report Period, estimated time of Startup:
March,11,,1991
'26. Units in Test Status (Prior to Corrmercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.=
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unitt NA-1 y
Dates
- Febiuarv 4.
'91 Completed by:
C. Mladen Phonet-(703) 894-2537-MONTH:
January 1991 L
DAY AVERAGE DAILY, POWER DAY AVERAGE DAILY LEVEL l
LEVEL (MWe-Net)-
. LEVEL (MWe-Net)
- 1~
382 17 0
2 380' 18 0
3
-3<
379 19 0
._ -378 20 0-
'5
-376-21 0
6 365 22 0
7-349 23 0
8~
353 24 0
9 353 25
-0
- 10..
353 26-0 11 1--
345 27 0
12 :-
2 28; O
-13 0 --
29 0
c.14
'O 30-0 115
~ 31 0-1.
16-
'O l
Instruction's 1,?On this format, list-the average daily unit power level in MWe-Net?for each day in the reporting month.
Compute to the nearest c q!
wholeEmegawatt..
a 1
,.. f.,...............
' ~ ' - - " ^ ^ - - - - - ^ ' ^ - - - - - ~ ~ ^ ~ - ~ ~ ~ ~ - - - - - - ~ - - ~ ~ ~
~
7
.:n
- .1.:, % -
~
.s-nUNIT' SHUTDOWNS AND..: POWER. REDUCTIONS-DOCKET NO.:,,
- 50-338.-
f!
~
UNIT NAME:
. NA-1s
~
.. DATE: January"3;c1991 i
REPORT MONTH:' January.
21991 COMPLETED BY:
C..Mladen.:
PHONE:.
(703):-894-2537--
'i
-1
-2:
3
.4' S
! No.
Date Type ~ Duration Reason Methodiof Licensee System. Component Cause &-Corrective
~(hrs).
Shutting Event Code Code Action to Down. Reactor ~ Report./
Prevent Recurrence-i:
.91-01 910112 S
479.2 C-1.
'N/A N/A-N/A S/G~ Maintenance scheduled' during upcoming outage, i
4 4
1: Type 2: Reason 3:-Method 4:
F= Forced
'A= Equipment--Failure (explain) 1= Manual Exhibit'F - Instructions.
S= Scheduled-B= Maintenance or: Test-2= Manual' Scram for-preparat. ion of~ Data
'C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory. Restriction-4= Continuations Event ~ Report (LER) File
-E= Operator Training & License Examination' 5= Load Reduction (NUREG-0161)
.F= Administrative c9=Other g
,.. a -
--.=
=
s.
n i
F Page 1
o f,,__1 UNIT SHUTDOWN nrD POWER REDUCTIONS Explanation Sheet
. Docket _No.
50-338
- Report Month January Unit Name:
NA-1 Yeart
-1991:_
Dates February 4.
' 91-completed by cathie Mladen
-#91-1'.-
January 12,-1991 LMain ~ Generator taken off-line at - 0050- houra.
-Unit entered Mode3 at.0123-hours.
Unit ~ entered Mode 4 at-1210' hours.-
4
)
.l
.-4..,
=..
- 4 4
NORTH ANNA POWER STATION UNIT NO.!
1-MONTH:
Januarv
SUMMARY
OF OPERATING EXPERIENCE
. Listed-below: in chronological sequence _is a
sur. mary of operating experiences for this month which' required _ load reductions
. or resulted in significant non-load related incidents ~.
'Qatt Time Data
' January. 01,=1991 0000 Began month with unit at 45%, 415MW, in coastdown.for refueling.
2B,'3B,-
and 4B teedwater' heaters are out of:
service due to tube leaks in 3B
^
January 12, 1991
'0050_
- Main Generator taken off-line.
0123
- Entered-Mode 3.
t
.1210 Entered. Mode 4..
' January 13,: 1991-0550
' Entered Mode 5 :f or Refueling Outage.'
January-21, 19911 0435-
~ Entered ~ Mode 6.
J a n u a r y.;3 1_,
_1 9 9 1 2400; Ended month with unit in Mode ~6.
i 1
>v l
[-
?[
e DOCKET No.:
50 339 DATE: February 4,91 COMPLETED BY C. Mladen PHONE: (703) 894 2537 OPERATING 11ATUS 1.
Unit Names................................ North Anna 2 2.
Report {ng Period:......................... January 1991 OPERATik0 DATA PEPORf 3.
Licensed Thermal Power (MWt):.............
2893 4 Nameplate Rating (0ross MWe).............
947 5.
Desiga E!ectrical Rating (Wet MWe).......
907 4.
Maximum Dependable Capacity (Gross MWe)..
957 7 Maximum Dependable Capacity (Net MWe)....
909 8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since Last report, give reasota N/A 9.
Power level to which restricted, if any (Net MWe): _ N/A
- 10. Reasons for restrictions, lf any:
N/A This Month YtD Cumulative
-11. Hours in Reporting Period................................
744.0 744.0 88,824.0 12, Number of Hours Reactor was Critical.....................
744,0 744,0-71,878.3'
- 13. Reactor Reserve Shutdown Hours...........................
0.0 0.0 :
5,949.6 14.- Hours Gene ra t or 0n-L i ne..................................
744,0 744.0 70,978.3
- 15. Uni t R es erve Shutdown Hours............... -...............
0.0-0.0 0.0.
- 16. Cros: Thermal E nergy Generat ed (MVH)..................... 2,151,760.?.
2,151,760.2 189,400,873.6-
- 17. - Gross E lect r ical Energy Generated (MWH)..................
715,285.0 715,285.0 62,017,871.0-18.' Net Electrical Energy Generated (MWH)....................
681,295.0 681,295.0 59,406,775.0
- 19. lini t S e rv i c e f ac t o r......................................
100.0%
100.0%
79.9%
- 20. Unit Availability Factor.................................
100.0%
100.0%
79.9%
- 21. Unit Capacity Factor (using MDC Net).....................
100.7%
100.7%
74.5%
- 22. Unit Capacity Factor (using DER Net).....................
-101.0%
101.0%
-73.9%
.23. F o r c ed Ou t a g e R a t e......................................
0.0%
0.0%
6.3%
i
- 24. Shuidowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
,,,,,N ON E
- 25. If Shutdown at end of Report Period, estimated time of Startup _
N/A'
- 26. Units in Test Status (Prior to Comnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.. -z
=
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
'50-339 Units:
NA-2 Dete*
February 4.'91 Completed by:
C.
Mladen Phone:
_(J.0 3 ) 894-2537 MONTH:
January 1991 DAY.
AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL
' LEVEL'(MWe-Net)
LEVEL (MWe-Net)-
1-917 17-916--
2-917 18 916
- 3 917 19 916 4-906
'20 916 5
917 21 916
. 6.
-917 22 915'
~7 915 23-915
'8 -
916 24 915 9l 916 25.
-916
-10:
916=
26 916
.11-
=915 27
=916
~ 12 -
-916 28:
916
-13 916 29 916-
-14 917 30 916'-
~15 916 31 916-16 916 Instructions:
i On this' format, list the average daily unit power level in MWe -
- i
' Net for;each day in the. reporting month.
Compute to the nearest 1.
iwhole megawatt.
i
u-Ui.IT ' SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE:
February 4, 1991 REPORT MONTH: Jan: ary 1991 COMPLETED BY:
C. Mladen PHONE:
(703) 894-2537 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence
- No entry this month l 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)
F= Administrative 9=Other 5:
G=Operaticnal Error
~
H=Other (explain)
Exhibit H - Same Source
g.
'l '
. y.,
Page 1
of
,_l-UNIT SHUTDOWN AND POWER REDUCTIONS Explanation 6iteet Docket No.t-50-339 Report Month January Unit Names.
'NA-2 Year 1991-Date:
S IS ruarv 4 91
~
4 Completed by:
Cathie_Mladen
'*NoLentryLthis; month.
i
)
4 h
4 i.
} :. '
I '-
I..
l
NORTil ANNA POWER STATION UNIT No.:
2 MONT}!!.. January HMMbRY OF OEEBATING IKEEBJIME Listed below in chronological sequence is
+
. mmary of operating experiences for this month which required Ic uctions or resulted in significant non-load related incidents.
DJ!Lt9 tie.R DAIA c
January 04, 1991 0000 Bogan month with unit at 100%,
957MWo.
January 04, 1991 0918 Commenced unit ramp down to 885 MWo fer TVFT.
1127 Completed 2-PT-34.3, TVFT.
q 1210 Unit at 97.5% power awaiting return of 2-SD-P-2A, low pressure heator drain
- pump, from maintenance activities.
1505 Commenced ramp up to 100% power.
1524 Unit stabi.lized at 100% power.
January 31, 1991 2400 Ended month with unit at 100%, 963 MWe.
,