OPERATING DATA REPORT DOCKET NO. 50-287 DATE 8/15/80 COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 OPERATING STATUS Oconee Unit 3 N"I'5

1. Unit h.ame.

July, 1980 Year-to-date and cummulative

2. Reporting Period: e h-2568 lated using a weighted
3. Licensed Thermal Power 15 twt):

934 average for maximum dependablo

4. Nameplate Rating (Gross MWel:

886 capacity.

5.. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):

899

~ '

7. Maximum Dependable Capacity (Net MWe):

860 ,

5. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None _

9. Power Level To Which Restricted. If Any (Net Mwel: None
10. Reasons For Restrictioru,if Any:

1 t.

This Month Yr..to.Date Cumulative 744.0 . 5 111.0 49 319.0 II. Hours in Reporting Period 686.5 3 564.2 35 458.1

12. Number Of Hours Reactor Was Critical -
13. Reactor Reserve Shutdown Hours 666.9 3 492.2 34 553.8 ,
14. Hours Generator On.Line -
15. Unit Reserve Shutdown Hours 1 629 818 8 802 107 83 183 713
16. Gmss Thermal Energy Generated (MWH)

_.5.12 600 3 042 240 28 793 504

17. Gross Electrical Energy Generated (MWH) _ _ ,

534 818 2 897 936 27 394 492

18. Net Electrical Energy Generated (MWH) 89.6 68.3 70.1
19. Unit Service Factor
20. Unit Availability Factor 89.6 68.3 70.1 83.6 65.9 64.3
21. Unit Capacity Factor (Using MDC Net) 81.1 64.0 62.7
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outsge Rate 10.4 15.6 17.9
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

Refueling - December 28, 1980 - 15 Weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast s Achieved

\

INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8211030278 000815 I I PDR ADOCK 05000287 R PDR

Pega 1 of 2 lINil Sililll> OWNS AND POWI R Hi utJCitoNs DOCKET NO. 50-287 UNIT NAME Ocnnee Unit 1, DATE R/19/nn July, 1980 COMPLETEl) BY T- A- Renvist Itt:pOR I MON HI TELErilONE .f,2nA)17 hrs 0 p e.

=- <e iu - E

-., .i e  : , E ~4 l. n.enser 5 -t, c"L Cause & Correceive N. i . D.it e 3, 3g g ,g g y Even, p? $3 Attion to -

H

$E d j5g Repois n 80 Preveni Recussence

[' ,

6 4 . _ _ .

2 80-07-01 F 56.30 A -

CB HTEXCH "A" steam generator tube leak repair completed.

2a 80-07-03 F 3.77 H 3 CH ZZZZZZ Transient in feedwater caused reactor trip. Unit not on line.

5p 80-07-03 F -

B -

HB HTEXCH Holding in power due to problems in opening valve (3 MS 76), steam supply to moisture separators.

6p 80-07-03 S -

B -

HB HTEXCH Holding in power for scheduled moisture separator reheater test.

7p 80-07-04 F -

B -

HH PUMPXX Holding in power for maintenance on 3 "B" hotwell pump.

8p 80-07-04 S -

B -

HB HTEXCH Holding in power for scheduled moisture separator reheater test.

/

I 2 .I l I- 1.nsed Reason - Meshud: Exhibit G -Insisustiims S. Ssheduled .tl'quipnieni I:.idnic II splain) i Manual for Preparation of Data II.Mainten.ini e os l~rst :f Manual Sessin.

l Entr> Sheets fo 1.icensee C ltelucting - 3 Ausinnate S(sam. Evens Repint II.I'R) I'de INllRI.G-D Regulatin) Resinition 1 Oilwe liarlaini 0161)

IIIpt*fJlol llJallitig et I OCCflW I %altitilJlltHI j l' Ad1138tilallJilVe , b C OperJtItHIJi i llest IlhplJillt E %Ilibil 1 - Same SoutW i'If II I II Oilles ll5 mpI.atte)

I

Page 2 ot 2 .

IINil Silll1 DOWNS ANI) PowlIt Rt purgloNS DOCKET NO. 50-287 UNIT NAME Oconee Unit 3 UATE 8/15/80 COMPLETEI) BY J. A. Renvis HEl'UR I AIONill . July, 1980 TELEPHONE (704)373-8552 I

E- *e 3 ue : .

6*

233

~

IILCH5CC Cause & Cunective y' , ' p' , ', y fE 5 5'( E .,

y y.5 6 5ge Even 3,3

'^ U El' Attiini to -

OO k j Ui RCP'"I " , Prevent Recurrence 3 80-07-10 F 5.28 A 3 HB INSTRU High level indication on MSRH's caused turbine / reactor trip.

4 8Q-07-11 F 11.75- H 3 RB FUELXX Power transient (flux / flow imbalance) caused trip.

h

[ .

I 2 1 l

1. l'inicil Reason: Meiln 1: Exhibit G Insiinceiinis S Silicshiteil A.l'iguipinen I:.nh.ie (l splaini l Manual for Pseparathni of Data ll Mainten.nise en lest e l M.anual Scram Ents) Sheets few l.icensec C.ltelucinig .l Autonutic S uni. I! vent Repost II.l:Ril'ileINilRI.G-D Itegulatin) Itesisistnen .l.Oshe II.splaisil OIblI I. Openalos Isann"t A Iisenw I unnnais .n li Ailininist saine . 5 G Opes.stional I s eus 11'spl.iin) Esliitus 1 - Same Siniree l'8/771 11 Othen libel.un!

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-287 UNIT Oconee Unit 3 04TE 8/15/80 CONIPLETED BY J. A. Reavis TELEPHONE (704)373-8552 July, 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net t g ywe.Seg, 1

17 847 2 -

18 846 3 98 19 843 4 533 20 845 5 797 21 847 6 840 22 847 [

t 7 849 23 846 8 849 24 845 9 848 25 846 10 670 26 848 11 135 27 847 12 677 23 848 13 814 29 848 14 847 30 847 l

844 31 846 15 16 R50

!NSTRUCTIONS On :his format, list the sserage daily unit power leselin MWe-Net for each ds) in the reporting month. Compute to the nearest whole megawstt.

19177)

- - 4 e. . - ,cy. g

. MOSTHLY REFUELING INFORMATION REQUEST Oconee Unit 3 ,

1. Facility name:

December, 1980

2. Scheduled next refueling shutdown: ,
3. Scheduled restart following refueling: February, 1981 .
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? NA .

If no, when is review scheduled? NA .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: September 1. 1980 + .
6. l=portant licensing considerations (new or different design or s pplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). None l

I l

l

7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 441 .

8. Present licensed fuel pool capacity: 474 .

Size of requested or planned increase: None .

9. Projected date of last refueling which can be accommodated by present
  • licensed capacity: .

l i

DUKE POWER COMPANY Date: August 15, 19'80 ,

I Name of

Contact:

Jerel Reavis ,

i l

DOCKET NO: 50-287 UNIT: Oconee Unit 3 DATE: 8/15/80 NARRATIVE

SUMMARY

MONTE: July, 1980 .

Oconee 3 began the month of July in heatup. During heatup, a reactor trip was experienced on July 3 at 0818 due to a feedwater swing while unblocking the main feedwater valves. The reactor was critical again and the unit on line at 1204 the same day. After necessary holds for maintenance problems and planned tests, the unit reached near rated power at 1315 on July 5.

On July 10 at 1914, the unit tripped due to a MSRH high level indication. It was returned to service on July 11 at 0031. Another trip occurred at 0835 from a power imbalance. The unit was in service again at 2020 and increasing in power. Near rated power was reached on July 13 and continued the remainder of the month.

.+

l l \

4 4

e l .. _. -_-

OCONEE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of June, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit. ~
2. The total station liquid release for June has been compared with the Technical Specifications annual value of 15 curies; the total release for June was less than 10 percent of this limit. .

i The total station gaseous release for June has been compared with the derived Technical Specifications annual value of 51,000 curies; the total release for June was less than 10 percent of this limit.

.+

i l

I l

, _ _ . s