Letter Sequence Request |
---|
|
|
MONTHYEARML20065T4321990-12-19019 December 1990 Application for Amends to Licenses NPF-72 & NPF-77,changing Unit 2 Heatup & Cooldown Curves & Low Temp Overpressure Protection Setpoints & Shortening Applicability of Unit 1 Curves,Per Generic Ltr 88-11 Project stage: Request 1990-12-19
[Table View] |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20210J1711999-07-30030 July 1999 Application for Amends to Licenses NPF-72 & NPF-77,proposing Temporary Changes to TS Re Upper Temperature Limit for Ultimate Heat Sink ML20209B7301999-06-30030 June 1999 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,providing Correction to LCO Associated with TS Section 3.8.5, DC Sources - Shutdown & Deleting Various References to At&T Batteries in Braidwood TS Section 3.8 ML20204H9661999-03-23023 March 1999 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TSs to Support Installation of New Boral high-density SFP Storage racks.Non-proprietary & Proprietary Info Encl.Proprietary Info Withheld.Per 10CFR2.790 ML20204H4211999-03-22022 March 1999 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N3351998-12-29029 December 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising Twelve RTS & ESFAS Allowable Values Contained in ITS Table 3.3.1-1 & Table 3.3.2-1 ML20196B3941998-11-25025 November 1998 Application for Amends to Licenses NPF-72 & NPF-77, Facilitating Replacement of 125 Vdc At&T Batteries with New 125 Vdc C&D Batteries While in Mode 1-4 ML20195J4101998-11-19019 November 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising App C,Addl License Conditions,By Deleting & Adding License Conditions as Stated.Marked Up App C Pages, Encl ML20155H9941998-10-30030 October 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Design Features Description Contained in Section 5.6.2 ML20248C5301998-05-29029 May 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Bases Section 3/4.4.4, Relief Valves to Credit Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS ML20198L8701998-01-14014 January 1998 Application for Amends to Licenses NPF-72 & NPF-77, Respectively.Proposed Amends Revise TS Section 3/4.8.2 & Bases,To Allow Replacement of 125 Volt Dc At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries ML20198L7981998-01-14014 January 1998 Application for Amends to Licenses NPF-72 & NPF-77, Revising TS to Reduce Dose Equivalent I-131 Activity from Requested 0.1 Microcuries/Gram to 0.05 Based on Revised Total end-of-cycle 7 Projected Leak Rate Value ML20198C2961997-12-30030 December 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS 3.7.1.3, Condensate Storage Tank & Associated Bases for Plants to Raise Min Allowable CST Level ML20199A4651997-11-0707 November 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively.Amends Would Revise TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.b & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20202F4481997-10-10010 October 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,requesting to Convert Byron & Braidwood Current Tech Specs to Byron & Braidwood Improved Tech Specs ML20211D9341997-09-24024 September 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising Allowable Time Interval for Performing Turbine Throttle valve.Non-proprietary & Proprietary Trs,Encl.Proprietary Info Withheld ML20216G8341997-09-0808 September 1997 Application for Amend to TS 4.5.2.b & Associated Bases to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,to Bring Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20216F1141997-09-0202 September 1997 Application for Amends to Licenses NPF-72 & NPF-77,revising TS Section 3.4.8, Specific Activity. Rev 0 to Calculation BRW-97-0798-M & Rev 3 to Calculation 95-011 Encl ML20148P7041997-06-30030 June 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Section 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3041997-06-24024 June 1997 Suppl to 970524 Application for Amends to Licenses NPF-66 & NPF-77,revising TS 4.5.2.b Re Venting of ECCS Pump Casings & Discharge Piping High Points Outside of Containment.Proposed Changes to Bases Revised to Delete Ref to Pressure ML20141B7551997-06-17017 June 1997 Application for Amend to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Sections 3/4.6.1.6,4.6.1.2,6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a ML20148J3031997-06-0909 June 1997 Application for Amend to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,reflecting Latest Rev of Waste Gas Decay Accident Dose Calculation ML20141K8961997-05-24024 May 1997 Application for Exigent Amends to Licenses NPF-37,NPF-66 & NPF-77,revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20141K8891997-05-23023 May 1997 Suppl to 970523 Application for Emergency Amend to License NPF-72,revising TS Surveillance Requirement 4.5.2.b.1 Re ECCS Pump Casings & Discharge Piping High Points Outside Containment.Changes Proposed Limit to End of Cycle 7 ML20148D6721997-05-23023 May 1997 Application for Emergency Amend to License NPF-72,revising Surveillance Requirement 4.5.2.b.1 for Unit as It Relates to Requirement to Vent ECCS Pump Casings & Discharge Piping High Points Outside Containment ML20141J9781997-05-21021 May 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,requesting to Allow Licensee Control of RCS Pressure & Temp Limits for Heatup,Cooldown,Low Temp Operation & Hydrostatic Testing ML20196G0401997-04-25025 April 1997 Suppl to 970130 Application for Amends to Licenses NPF-37, NPF-66,NPF-72 & NPF-77,revising TS for Containment & RCS Vol.Encl marked-up Improved TS Pages Were Not Included in Original Submittal ML20137N9801997-03-24024 March 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,removing Values of cycle-specific Core Operating Limits from TS & Relocating Values to Operating Limit Rept ML20135E6791997-02-28028 February 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,replacing Original Westinghouse D4 SG at Byron & Braidwood W/B&W International SGs ML20135B5571997-02-24024 February 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,from Current TS to Improved TS Consistent w/NUREG-1431,Rev 1, STS - W Plants, Dtd Apr 1995 ML20134N8381997-02-18018 February 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,requesting Rev to Support Steam Generator Replacement ML20134E8451997-01-30030 January 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77 to Revised TS 1.0, Definitions, 3/4.6.1, Primary Containment & Associated Bases & 5.4.2, Reactor Coolant Sys Volume, for Bs & Bs to Support SG Replacement ML20134D0321997-01-20020 January 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Section 3.6.3 Containment Isolation Valves for Byron & Braidwood Unit 1 to Support Replacement of Original W Model D4 SGs W/Babcock & Wilcox Intl SGs ML20133B5851996-12-13013 December 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77 Requesting Conversion to Improved Standard TSs ML20134N7661996-11-0505 November 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS 3.9.11,5.6.1.1 & 6.9.1.10 to Allow Util to Take Credit for Soluble Boron in Spent Fuel Pool Water in Maintaining Acceptable Margin of Subcriticality ML20132A0241996-11-0404 November 1996 Application for Amends to Licenses NPF-37 & NPF-72,revising TS 3.6.1.6 to Allow one-time Exemption to Requirements of SR 4.6.1.6.1.e.1 ML20117K3141996-08-30030 August 1996 Application for Amends to Licenses NPF-72 & NPF-77,modifying App A,Ts 3/4.4.5 by Adding Footnote Specifying Repair Criteria for Top of Tube Sheet Indications If Found as Part of Reviewing Previous Unit 1 Oct 1995 EC SG Data ML20117D1451996-08-23023 August 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77 Requesting Rev to Appendix a TS 3/4.7.7, Non-Accessible Area Exhaust Filter Plenum Ventilation Sys ML20117J0141996-08-19019 August 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,renewing 3.0 Volt Bobbin Coil Probe,Sg TSP Interim Plugging Criteria Limit for Outside Diameter Stress Corrosion Cracking ML20116F0791996-08-0202 August 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,eliminating Corrosion Testing Requirement for SG Tube Sleeving ML20108E7791996-04-29029 April 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Section 3/4.7.1, Turbine Cycle Safety Valves & Associated Bases ML20100L2271996-02-27027 February 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,implementing 10CFR50,App J,Option B That Allows Use of Performance Based Surveillance Frequencies for Type A,B & C Tests Rather than Predetermined Intervals ML20100H8841996-02-21021 February 1996 Submits Suppl Info Re Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,proposing to Revise Ten of Line Item TS Improvements Recommended by GL 93-05 ML20096C0161996-01-11011 January 1996 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising TS 3.3.1, RT Sys Instrumentation, Table 3.3-1,Functional Unit 6, Source Range,Neutron Flux, Consistent W/Improved STS ML20095J5081995-12-21021 December 1995 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,expanding Plant Operating Limits Rept to Include Limits Suggested by GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts ML20095D6191995-12-0606 December 1995 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Section 3/4.6.1, Primary Containment, to Incorporate Requirements of Revised 10CFR50,App J,Which Became Effective on 951026 ML20098C6751995-10-0303 October 1995 Application for Amends to Licenses NPF-37 & NPF-66,revising Allowable Time Intervals for Performing Certain TS Surveillance Requirements on Plant Components During Power Operation,Per GL 93-05 ML20098A3851995-09-20020 September 1995 Suppl Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,modifying TS 3.6.1.7, Containment Purge Ventilation Sys ML20092H3151995-09-14014 September 1995 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS 5.3.1, Fuel Assemblies to Allow Use of Alternate Zirconium Based Fuel Cladding,Zirlo & TS 5.4.1.a to Refer to UFSAR Rather than FSAR ML20087H6881995-08-15015 August 1995 Application for Amends to Licenses NPF-72 & NPF-77,revising Ts,By Renewing Current 1 Volt SG Tube Plugging Criteria Per GL 95-05 ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys 1999-07-30
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217N3631999-10-13013 October 1999 Amends 111,111,104 & 104 to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising Requirements Related to cross- Tie DC Power Buses Between Units & Removing Refs to At&T Batteries Which Have Been Replaced at Braidwood Station ML20212A8121999-09-0808 September 1999 Amends 103 & 103 to Licenses NPF-72 & NPF-77,respectively, Changing Max Allowable Temp of UHS in TSs from 98 Degrees F to 100 Degrees F ML20210J1711999-07-30030 July 1999 Application for Amends to Licenses NPF-72 & NPF-77,proposing Temporary Changes to TS Re Upper Temperature Limit for Ultimate Heat Sink ML20209B7301999-06-30030 June 1999 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,providing Correction to LCO Associated with TS Section 3.8.5, DC Sources - Shutdown & Deleting Various References to At&T Batteries in Braidwood TS Section 3.8 ML20207F1181999-06-0202 June 1999 Amend 102 to Licenses NPF-72 & NPF-77,revising TS 3.9.3 Re Use of Gamma-Metrics post-accident Source Range Neutron Flux Monitors as Alternative to Westinghouse Source Range Neutron Flux Monitors During Mode 6 Operations (Refueling) ML20206G5961999-05-0303 May 1999 Amends 108,108,101 & 101 to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising TS Requirements for Spent Fuel Pool Inadvertent Draindown Elevation ML20206B6841999-04-23023 April 1999 Amends 100 & 100 to Licenses NFP-72 & NPF-77,respectively, Changing TS Tables 3.3.1-1 & 3.3.2-1,to Revise Allowable Values for 12 Functions of RTS & Efsas ML20205D6511999-03-26026 March 1999 Amends 99 to Licenses NPF-72 & NPF-77,respectively,changing TS to Support Online Replacement of Vital Batteries ML20204H9661999-03-23023 March 1999 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TSs to Support Installation of New Boral high-density SFP Storage racks.Non-proprietary & Proprietary Info Encl.Proprietary Info Withheld.Per 10CFR2.790 ML20204H4211999-03-22022 March 1999 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6 ML20198N3351998-12-29029 December 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising Twelve RTS & ESFAS Allowable Values Contained in ITS Table 3.3.1-1 & Table 3.3.2-1 ML20196B3941998-11-25025 November 1998 Application for Amends to Licenses NPF-72 & NPF-77, Facilitating Replacement of 125 Vdc At&T Batteries with New 125 Vdc C&D Batteries While in Mode 1-4 ML20195J4101998-11-19019 November 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising App C,Addl License Conditions,By Deleting & Adding License Conditions as Stated.Marked Up App C Pages, Encl ML20195D5081998-11-0404 November 1998 Errata to Amends 96 & 96 to Licenses NPF-72 & NPF-77, Respectively,Correcting TS Page ML20155H9941998-10-30030 October 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Design Features Description Contained in Section 5.6.2 ML20154P1571998-10-15015 October 1998 Amends 97 & 97 to Licenses NPF-72 & NPF-77,respectively, Revising TS Re non-accessible Area Exhaust Filter Plenum Ventilation Sys to Reflect Design Lineup ML20151T2001998-09-0303 September 1998 Amends 95 & 95 to Licenses NPF-72 & NPF-77,respectively, Changing TS Limits on RCS Dei ML20237D4471998-08-18018 August 1998 Amends 94 & 94 to Licenses NPF-72 & NPF-77,respectively, Revising TS to Support Replacement of 125 Volt Direct Current At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries ML20248C5301998-05-29029 May 1998 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Bases Section 3/4.4.4, Relief Valves to Credit Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS ML20248F4521998-05-26026 May 1998 Amends 93 & 93 to Licenses NPF-72 & NPF-77,respectively, Revising Surveillance Frequency for Turbine Throttle Valves & Turbine Governor Valves from Monthly to Quarterly ML20203B7231998-02-0303 February 1998 Amends 92 & 92 to Licenses NPF-72 & NPF-77,respectively, Revise TS to Reflect Forthcoming Replacement of Original Steam Generators ML20199E6871998-01-29029 January 1998 Amends 99,99,90 & 90 to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising TSs to Update Containment Vessel Structural Integrity to Meet Provisions of Recent Rev to 10CFR50.55a ML20199K4681998-01-23023 January 1998 Amends 89 & 89 to Licenses NPF-72 & NPF-77,respectively, Relocating RCS Pressure & Temperature Limits for Heatup, Cooldown,Low Temperature Operation & Hydrostatic Testing & Associated LTOP Sys Setpoint Curves ML20199H7861998-01-22022 January 1998 Amends 88 & 88 to Licenses NPF-72 & NPF-77,respectively, Revising TS & Associated Bases Re Primary Containment Pressure & RCS Vol ML20199D2441998-01-15015 January 1998 Amends 87 & 87 to Licenses NPF-72 & NPF-77,respectively, Changing TS Requirements for SG Water Level to Support SG Replacement ML20198L7981998-01-14014 January 1998 Application for Amends to Licenses NPF-72 & NPF-77, Revising TS to Reduce Dose Equivalent I-131 Activity from Requested 0.1 Microcuries/Gram to 0.05 Based on Revised Total end-of-cycle 7 Projected Leak Rate Value ML20198L8701998-01-14014 January 1998 Application for Amends to Licenses NPF-72 & NPF-77, Respectively.Proposed Amends Revise TS Section 3/4.8.2 & Bases,To Allow Replacement of 125 Volt Dc At&T Batteries W/New Charter Power Sys,Inc (C&D) Batteries ML20198C2961997-12-30030 December 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS 3.7.1.3, Condensate Storage Tank & Associated Bases for Plants to Raise Min Allowable CST Level ML20203F6511997-12-0404 December 1997 Amends 86 & 86 to Licenses NPF-72 & NPF-77,respectively, Granting Partial Credit for Boron in Spent Fuel Pools to Maintain Subcriticality ML20199A4651997-11-0707 November 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively.Amends Would Revise TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.b & Bases to Allow Performance of 10CFR50 App J,Type a Testing ML20202F4481997-10-10010 October 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,requesting to Convert Byron & Braidwood Current Tech Specs to Byron & Braidwood Improved Tech Specs ML20211D9341997-09-24024 September 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising Allowable Time Interval for Performing Turbine Throttle valve.Non-proprietary & Proprietary Trs,Encl.Proprietary Info Withheld ML20216G8341997-09-0808 September 1997 Application for Amend to TS 4.5.2.b & Associated Bases to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,to Bring Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in ML20216F1141997-09-0202 September 1997 Application for Amends to Licenses NPF-72 & NPF-77,revising TS Section 3.4.8, Specific Activity. Rev 0 to Calculation BRW-97-0798-M & Rev 3 to Calculation 95-011 Encl ML20210K9661997-08-13013 August 1997 Amends 85 & 85 to Licenses NPF-72 & NPF-77,respectively, Authorizing Change to Realistic Dose Values for Process Gas Sys Rupture in Section 15.0 of Plant UFSAR ML20210M6581997-08-13013 August 1997 Amend 84 to License NPF-77,revising TS 4.5.2.b.1 to Clarify That Venting Only Required on ECCS Subsystems That Are Idle or Stagnant ML20149B7561997-07-10010 July 1997 Amends 91,90,84 & 83 to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising TS 3.6.3, Containment Isolation Valves, to Reflect Mods Associated W/Sg Replacement for Unit 1 of Each Station ML20148P7041997-06-30030 June 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Section 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of Subcriticality ML20141F3041997-06-24024 June 1997 Suppl to 970524 Application for Amends to Licenses NPF-66 & NPF-77,revising TS 4.5.2.b Re Venting of ECCS Pump Casings & Discharge Piping High Points Outside of Containment.Proposed Changes to Bases Revised to Delete Ref to Pressure ML20141B7551997-06-17017 June 1997 Application for Amend to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS Sections 3/4.6.1.6,4.6.1.2,6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a ML20148J3031997-06-0909 June 1997 Application for Amend to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,reflecting Latest Rev of Waste Gas Decay Accident Dose Calculation ML20141K8961997-05-24024 May 1997 Application for Exigent Amends to Licenses NPF-37,NPF-66 & NPF-77,revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves ML20148D6721997-05-23023 May 1997 Application for Emergency Amend to License NPF-72,revising Surveillance Requirement 4.5.2.b.1 for Unit as It Relates to Requirement to Vent ECCS Pump Casings & Discharge Piping High Points Outside Containment ML20141K8891997-05-23023 May 1997 Suppl to 970523 Application for Emergency Amend to License NPF-72,revising TS Surveillance Requirement 4.5.2.b.1 Re ECCS Pump Casings & Discharge Piping High Points Outside Containment.Changes Proposed Limit to End of Cycle 7 ML20141J9781997-05-21021 May 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,requesting to Allow Licensee Control of RCS Pressure & Temp Limits for Heatup,Cooldown,Low Temp Operation & Hydrostatic Testing ML20138K0291997-05-0606 May 1997 Amends 89,89,81 & 81 to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,respectively,revising TS to Permit Removal of Containment Tendon Sheathing Filler Grease in Up to 35 Tendons for Plants in Advance of SG Replacement Outages ML20196G0401997-04-25025 April 1997 Suppl to 970130 Application for Amends to Licenses NPF-37, NPF-66,NPF-72 & NPF-77,revising TS for Containment & RCS Vol.Encl marked-up Improved TS Pages Were Not Included in Original Submittal ML20137Y0661997-04-16016 April 1997 Amends 80 to Licenses NPF-72 & NPF-77,respectively, Relocating Certain cycle-specific Parameter Limits from TSs to Operating Limits Rept ML20137N9801997-03-24024 March 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,removing Values of cycle-specific Core Operating Limits from TS & Relocating Values to Operating Limit Rept ML20135E6791997-02-28028 February 1997 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,replacing Original Westinghouse D4 SG at Byron & Braidwood W/B&W International SGs 1999-09-08
[Table view] |
Text
l Ccrnmonw:alth Edison L,
1400 Opus Place Downers Grove, HHnois 60515 December 19, 1990 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regul/tlon U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn:
Document Control Desk
Subject:
Braidwood Station Units 1 and 2 Application for Amendment to facility Operating License NPF-72 and NPF 77 RRC_DotheLNom50dM_and_50-A57
Reference:
TAC # 71465 and 71466
Dear Dr. Murley:
Pursuant to 10 CFR 50.90, Commonwealth Edison (CECO) proposes to amend Appendix A, Technical Specification of facility Operating License NPF-72 and NP."-77.
The proposed amendment changes the Braidwood Unit 2 heatup and cooldown curves, the power operated relief valve Low-Temperature Overpressure Protection (LTOP) setpoints, and their bases.
The proposed amendment also shortens the applicability of the Unit I heatup and cooldown curves.
These changes resulted from the NRC Generic letter 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations.
A detailed description of the proposed change is presented in Attachment A.
The revised Technical Specification pages are contained in Attachment B.
The proposed change has been reviewed and approved by both on-site and off-site review in accordance with Ceco procedures.
CECO has reviewed this proposed amendment in accordance with 10 CFR 50.92(c) and has determined that no significant hazards consideration exists.
This evaluation is documented in Attachment C.
An Environmental Assessment Ms been completed and is contained in Attachment D.
The Braidwood Unit 2 heatup and cooldown curves in the Technical Specification are valid until 2.2 Effective Full Power Years is reached.
The earliest the Unit can reach this has been calculated to be June 27, 1991.
Therefore, CECO requests that this proposed amendment be approved by June I, 1991 to allow for the implementation of the LTOP setpoints and for the controller setpoint change for the PORVs.
r 0
9012280120 901219 PDR ADOCK 05000456 P
PDR 4g
.us 4
Dr. T.E. Hurley December 19, 1990 During the NRC review of a similar submittal for Byron Station several additional questions were asked of CECO.
The answers to those questions, as they pertain to Braidwood, are contained in Attachnent E.
It is permissible to distribute copies of the Letter Reports, MT/ Smart 216 (88) and 078 (89), prepared by Westinghouse Electric for CECO.
CECO is notifying the State of Illinois of our application for this amendment by transmitting a copy of this letter and its attachments to the designated State Official.
Please direct any questions regarding this matter to this office.
Very truly yours, hnk led W A. R. Checca Nuclear Licensing Administrator
Enclosures:
- 1) HT-SMART-216(88)
- 2) HT-SMART-078(89)
- 3) September 12, 1990 letter from G.P. Toth to C.A. Hoerle cc:
Braidwood Resident Inspector R. Pulsifer - Project 'lanager, NRR Region III Office Office of Nuclear facility Safety - IDNS
/scl:ID615:1
i i
ATTACHMENT A TECHNICAL SPECIFICATION CHANGE REQUEST I
i Er_opondlhannel The following is a brief description of the changes proposed to the Technical specifications, and the bases for these changes:
Specification 4.4.9.1.2 is being revised to address both heatup, cooldown, and cold overpressure protection setpoint figures as they exist in the Technical Specifications.
These changes are administrative in nature and have no impact on the manner in which either unit is, or will be operated.
Figure 3.4-2a and 3.4-38, Unit I heatup and cooldown limitations, are being revised to address shortened applicability.
This change is based on an evaluation that was performed by Westinghouse to determine the applicability v:tes of the current Technical Specification curves.
The results of this evaluation have shown that the heatup curve applicability must be shortened to 4.5 EFPY, while the cooldown curve is applicable for 12.0 EFPY, figure 3.4-2b and 3.4-3b, Unit 2 heatup and cooldown limitations, are being revised in their entirety.
New curves have been generated based on the guidance given in Reg. Guide 1.99 Rev. 2.
These new curves for Unit 2 will be applicable for 16 EFPY.
The cold overpressure protection setpoint curve has also been revised appropriately.
Specification 3.4.9.3 has been revised to address unit specific cold overpressure protection curves.
Figure 3.4-4a is the curve that has been in effect for both Unit I and 2 so far to date.
This curve is applicable to Unit 1, and will be revised based on the evalt,ation to be done on Unit 1 prior to 4.5 EFPY.
Figure 3.4-4b is applicable to Unit 2, and is required as a result of the reanalysis performed on Unit 2 in accordance with Reg. Guide 1.99 Rev.
2.
Specification 4.4.9.3.1.b has been revised to delete a note that has expired.
This change is administrative in nature.
The bases section for specification 3/4.4.9 has been revised to address unit specific heatup and cooldown curves, and reference to requirements resulting i
from the reanalysis performed on Unit 2 in accordance with Reg. Guide 1.99.
Revisions have been made to Reactor vessel material toughness tables B 3/4.4-la and B 3/4.4-lb to address the nickel content for three (3) vessel weld locations found tc be limiting on both units.
Table 3/4.4-16 is also being revised to correct the heat numbers.
A transcription error occurred in l
the original submittal of the table.
1 1
7tE N15-2 i
- D11tuiS10D In Generic letter 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations, the NRC called attention to Revision 2 to Regulatory Guide (RG) 1.99, " Radiation Embrittlement of Reactor Vessel Materials," a document which became effective May 1988. A technical analysis was performed to determine heatup and cooldown limit curves and the reference temperature for pressurized thermal shock (PTS) based on RG 1.99 Rev. 2 methodology.
Revised heatup and cooldown curves for Br W wood Unit 2 are proposed as a result of evaluating the analyses.
Add 14 ly, licensees were to evaluate the possibility for the need to revise Low-Temperature Overpressurization (LTOP) setpoints and enable temperatures, as they are determined from the P-T limits which are revised as a result of RG 1.99 Rev. 2.
The GL 88-11 stated that the Standard Review Plan (SRP) 5.2.2 "Overpressurization Protection" and the associated Branch Position RSB 5-2, in particular, paragraph II.8, was changed and might prevent overly restrictive operation based on LTOP setpoints.
The revision date of the SRP was November, 1988.
Appendices G and H of 10 CFR Part 50 describes specific requirements for fracture toughness and reactor vessel material surveillance that must be considered in setting pressure / temperature limits.
Appendix G also requires that reactor vessel beltline materials in the surveillance capsules be tested in accordance with Appendix H.
These tests define the extent of vessel embrittlement at the time of capsule withdrawal in terms of the increase in reference temperature. Appendix G also requires the licensee to predict the effects of neutron irradiation on vessel embrittlement by calculating the adjusted reference temperature (ART) and Charpy upper shelf energy (USE).
Generic Letter 88-11, requested that licensees use the methods in Regulatory Guide 1.99 Revision 2 to predict the effccts of neutron irradiation on reactor vessel materials.
This guide defines the ART as the sum of the unirradiated reference temperature, the increase in reference temperature resulting from neutron irradiation, and a margin to account for uncertainties in the prediction method.
As a result of the revision made to Reg. Guide 1.99, revised heatup, cooldown, and cold overpressure protection curves for Braidwood Unit 2 are proposed, and the appilcability date for the heatup and cooldown curves for Unit I have been reduced to 4.5 and 12.0 Effective full Power Years (EFPY) respectively.
The Unit I curves are conservative for operation untl) their applicability dates are reached.
A Technical Speelfication change for the Unit i heatup, cooldown, and cold overpressure protection curves will be submitted prior to the Unit reaching the more restrictive of the two applicability dates.
Based on current data, Unit I will reach 4.5 EFPY by approximately December of 1993.
Bales _of_thLptop.oieLChBMe The changes made to the Unit 2 heatup, cooldown, and cold overpressure
[
protection system curves are a result of two changes incorporated into Reg, i
Guide 1.99 Rev. 2.
The analytical methods used to develop these changes are identical to those described in Byron Unit 1 & 2, Amendment 37 submitted on November 17, 1989 and approved on February 8, 1990 (TAC Nos. 71422 and 71473).
The first of these two changes was a change in the methods used to determine the adjusted reference temperature (ART), and the second was a change made to the chemistry factor (CF) due to a reduced importance placed on the phosphorus term in this factor.
MLD615-3 I
1
)
l !
UniL1 CECO evaluated the effect of neutron irradiation embrittlement on each beltline material in the Braidwood 1 reactor vessel.
The amount of irradiation embrittlement was calculated in accordance with RG 1.99, Revision 2.
As shown in enclosure 1, Table 1, page 8, Ceco has determined that the material with the highest ART at 4.5 EFPY is the circumferential weld WF562 with 0.04% copper (Cu), 0.67% nickel (N1), and an initial RTndt of 40'F.
CECO has removed one surveillance capsule from Braidwood 1.
The data was published in HCAP 12685 which was submitted October 22, 1990. All surveillance capsules contained Charpy impact specimens and tensile specimens made from base metal, weld metal, and HAZ metal.
For the limiting beltline material, weld HF562, the calculated ART is 109'F at 1/4T (T - reactor vessel beltline thickness) and 84*F for 3/4T at 4.5 EFPY, Fluence values are presented in Table 2 on page 11 of enclosure 1.
In addition to beltilne materials, Appendix G of 10 CFR Part 50 also imposes P/T limits based on'the-reference temperature for the reactor vessel closure
. flange materials.
Section IV.2 of. Appendix G states that when the pressure exceeds 20% of the preservice system hydrostatic test pressure, the temperature of the closure flange regions highly stressed by the bolt preload must exceed the reference temperature of the material in those regions by at least 120*F for normal operation and by 90'F for hydrostatic pressure tests and leak tests.
The flange reference temperature of-10*F is found in Table B 3/4.4-la, page B3/4 4-11 in the Braidwood Technical Specification.
Section IV'B of Appendix G requires that the predicted Charpy USE at end of life be above 50 ft-lb.- The unirradiated Charpy USE is 80 ft-lb for the upper to lower shell girth weld metal. This is also found in Table B3/4.4-la of the Technical Specification.
UniL2-CECO evaluated the effect of neutron irradiation embrittlement on each beltline material in the Braidwood 2 reactor vessel.
The amount of irradiation embrittlement was calculated in accordance with RG 1.99, Revision-2.
As'shown in enclosure 2 Table 4, page 12, CECO has determined that the material with.the highest ART at 16,0 EFPY is the circumferential weld (HF562)'
between the upper and lower shells with 0.04% copper (Cu), 0.67% nickel (N1),
and an ini.tlal Rindt of 40*F.
The) licensee has removed one. surveillance capsule from Braidwood 2.
All surveillance capsules contained Charpy impact specimens and tens 11e specimens made from base metal, weld metal, and HAZ metal.
The results of this capsule are not:yet available.
For the limiting beltline material', (WF562), the calculated the ART is 146.5'F at1/4T-(T= reactor-vesselbeltlinethickness)gnd122.8' Fat 3/4 Tat 160 EFPY. Ceco used a neutron fluence of 9.5E18 n/cm at 1/4T and 3.4E18 n/cm8at 3/4T. The ART was determined using Section 1 of RG 1.99, Revision 2.
See enclosure;2i Table 4, page 12.
IN1@615-4
,,i.,,-.,,,.
_z-_-_-.---_,-.-,
_ In addition to beltilne materials, Appendix G of 10 CFR Part 50 also imposes P/T limits based on the reference temperature for the reactor vessel closure flange materials.
Section IV.2 of Appendix G states that when the pressure exceeds 20% of the preservice system hydrostatic test pressure, the temperature of the closure flange regions highly stressed by the bolt.preload must exceed the reference temperature of the material in those regions by at least 120*F for normal operation and by 90*f for hydrostatic pressure tests and leak tests.
The flange reference temperature of 20'F la found on Table 2, page 10, of enclosure 2.
Section IV.D of Appendix G requires that the predicted Charpy USE at end of Ilf e be above 50 f t-lb.
The unirradiated Charpy USE is 80 ft-Ib for the upper to lower shell weld metal is found on Table 2, page 10 of enclosure 2.
T N1.[i615-5
..,_..,