_
6
-pYYDy f{
PillLADELPIIIA ELECTRIC COMPANY e
Wkfy.
PTACil IKWlOM AIOMIC POW 1.R $'IATION g
N R D.1. Box 208 bin jeM Delt.t. l'ecnmy lvania 1*'31I roun normutur rou ea os s xuittsu
(?!?) 1% 7014 D. B. Millet, Jr.
Yke hesident Decmber 14, 1990 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1990 forwarded pursuant to Technical Specificatica 6.9.1.d under the guidance of Regulatory Guide 10.I, Revision 4.
Sincerely,
/.
~
[
(
pk w ars p i DBM/AAF/fBC/DRM/MJB: cmc Enclosure ec:
R.Ac Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident inspector R.
McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC I-l.C. Schwemm, Atlantic Electric J. Urban, Delmarva Power INPO Records Center CC1191NRC l
/V
?
9012200141 901130 PDR ADOCK 05000277 R
PDR I
{
t-
,hI'.
NRC blonthly Operations Summary Peach llottnm Atomic Power Station November 1990 i
UNIT 2 The unit began the month at 100% power The first significant power reduction occurred on November 10, when power was reduced to 62% for rod pattern adjustment, waterbox cleaning, and minor maintenance. Activities were completed and power was restored to 100% on November 13 and remained there until November 15, when problems with the 4KV emergency switchgear undervoltage relays required the unit to be placed in shutdown.
A 2150 hertz noise signalin the switchgear caused the emergency bus voltage relays to trip lower than tech spec requirements. The relays were modified to filter the noise, and startup began on November 19. The unit began power production on November 20, increases in power continued over the next several days. By November 25, power had increased to and was held at 98% because maxirrum core flow had been reached. After a control rod pattern adjustment was made on November 26, power was increased to 100"o where it remained through the end of the month.
UNIT 3 The unit began the month shut down for the mid cycle outage. Outage activities were completed and power generation resumed on November 23. Startup testing and computer acceptance testing were completed, and the unit achieved power levels above 85% by November 27, A reductbn to 75% became necessary because of a degrading coupling on the 'C" reactor feed pump. Power was held below 80% through November 29 while maintenance activities were completed.' On November 30 power increases of 10 blwe per hour were in progress.
CC1191NRC
I Docket No. 50 277 Attachment to Monthly Operating Report for November 1990 UNIT 2 REFUEt,ING INFORM ATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
- January 12,1991 3.
Scheduled date for restart following refueling:
, March 21,1991 4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
Yes.
'If answer is yes, what; in general, will these be?
Safety limit MCPR for cycle 9.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
January 1991
- 6. -
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, signilicant changes in fuel design, new operating procedures:
~ 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
.(a)
Core - 761 Fur 1 Assemblics -
-(b)
- Fuel Pool' 1734 Fuel Assemblics,58 Fuel Rods C lW.NRC
1 J
DocLei No. 50 277 Attachment to Monthly Operating 4
Report for November 1(M)
Page 2 liNIT 2 RITUEt,1NG INFORM ATl@ (Continued) l
~ 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 20(D without full core ofDoad capability, j
September 1997 with full core offload capability.
1 i
i CC119).NRC g
,4 9
Docket No. 50 278 Attachment to htonihly Operating Report for November 1930 UNIT 3 REFUELING INFORM ATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 8 scheduled for August 31,1991 3;
Scheduled date for restart following refueling Restart following refueling scheduled for November 29,1991 4.
Will refueling or resumption of operation thereafter rcquire a technical specification change or other license amendment?-
- Yes, if answer is yes, what, in general, will these be?
Safety limit htCPR for cycle 9 fuel.
5, Scheduled date(s) for submitting proposed licensing action and supporting information:
January 19)1
- 6. -
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
7.
The number of fuel assemblics (a) in the coro and (b) in the spent fuel storage pool:
(a)
Core 764 Fuct Assemblies (b)
Fuel Pool 14% Fuel Assemblics,6 Fuel Rods CCllMNRC f
e *.
Docket No. 50-278 Attachment to Monthly Operating.
Report for November 1990 Page 2 UNIT 3 REFUEL,ING INFORM ATION (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.
The spent fuel pool storage capacity has been relicensed for 3819 Net assemblies. hiodification of the fuel pool is expected to be complete in the second quarter of 1991.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
With the current fuel pool capacity (prior to the completion of the fuel pool rcracking modification):
September 1996 without full core of00ad capability.
End of next cycle with full core of00ad capability (est. January 1991).
With increased fuel pool capacity (subsequent to the completion of the fuel pool rcracking modification)-
September 2004 without full core of00ad capability.
September 1998 with full core of00ad capability.
g 1
l CCit90.NRC l
l
AYlRAGt DAIL Y UN11 ID.'IR LtVIL DDCLt1 ND. d0 ???
UN11 FIACH [iOTfDM Uhlt 2 DAit DEEIMitR lt. 1990 00MF ANY FHIL ADELPHIA [LitiR10 CDMPAkt M. J. 6ARDN Su>tLY150R REPOR15 GRour PEACH l'.0 TION AICW10 00VtR 51Al!0N llLtPHDht (717) 450-7014 [XI. 3321 MONTH NOVtMfER 1090 DAY AvtRAGE DAILY t0Vt; ttvit DAY AvtR AGt DAILY F0VER LIVIL (MWE-Nit)
(Mit+hET) 1 1002 17 L
2 100B le 0
3 1052 19 0
4 1042 20 5
5 1041 21 215 6
1039 22 39B 7
1040 23 778 8
1047 24 9
1059 25 10tB 10 644 26 1042 11 706 27 1053 12 667 28 1071 13 1001 29 1075 14 1050 30 1007 15 007 16 0
____-.~._..m._.
...____..._,_..___-_m.m-1 d-4 AvtRAGE DA!LY UNIT P0vtR '.tvil
(
000Kl1 N3. $0 - 278 UNIT PIACH BOTTOM UNIT 3 1
3 q
Call OttiM(ER 15. 1990 COMFANY PHILADELPHIA (LECTRIC COMPANY M. J. BARON
$UP:RV!;04 REPORf5 GROUP PEACH B0ff0M ATOM!C POWIR $ tai!ON TILIPHONE (717) 456 7014 txt. 33?!
MONTH NOVEMBER 1990
'0AY 'AvtkAGC dally POWER Ltyll CAY Av[RASt DALLY P0vtt Ltvil I
(vst-htt)
(Mit. NET) 1 0
' !?
O t
0 IB C
l 3
0 19 0
4 0
20 0
5 0
21 0
6~
0 22 0
7 -
0 23 8
[
8 0
24 206 9
0 25 431 10 0
26 737 3
11 -
-0 27
~ 933 12
.0 28 760 13 0
29 905 14 -
0 30 924 15 0
i 16 0
l l
r L
I l
l
._,... ~.. _ _ _. _ _. _ _ _ _ _ _ _ _.
OP(RATING LATA REFORT DOCA [1 NO. $0 277 DATE OtttM!(R 15, IPLO COMPLITED BY FHIL A0tttHI A IL(CTRIC COMr Asy M. J. BARON Surt R VISOR RIPORTS GROUP FEACH BOTTOM ATOWIC F0Vik STATION TitlFHONE (717) 450-7014 [11. 3321 OrtRATING STATUS
- 1. UNIT NAw(: FIACH BOT 10w UNIT 2 NOT[5:
- 2. RtFORT!kG FIR 100: NOVtMftR, 1990
- 3. LICENSID THIRMAL POVIR(MJT):
3293
- 4. NAMtFL ATE RATING (GROS $ Hit):
11$2
- 5. D(51GN (LtCTR' CAL F A11NG (Nti Mit):
1005 C. HAXIMJW, DEFINDA!1t CAFACITY (GROSS MWE): 109E
- 7. MAtlMUM DEFIN0ABLE LAFAt!TY (Nti Pit):
h0kb B. 1F CHANGit CCCUR IN CAPACITY R&flh35 (!1[M5 NUMflR 3 UAOUGH 7) $1 Nil LAtt FIFORT, GIY( RIA50$i
- 9. F0VER LCvil TO VHlCH RESTRltitD, IF ANY (NCT WWE):
- 10. RI ASONS FOR R(51R!C110NS, IT ANY:
1H15 MLNTH YR fD DATE CUMJL All VI 11, HOURS IN REPORTING PIR100 720 B,010 143,232
- 12. NUME[R OF HOUR $ RE A 10R VAS CRITIC AL 034,7 0,429.4 E5,956,7
- 13. REACTOR Rl5[RVE SHUTDOWN HOUR $
0.0 0.0 0.0
- 14. HOURS GENERATOR ON.tlNE 593.3 6,235,6 82,641.1
- 15. UNIT RISERVE SHUIDDVN HOUR $
0.0 0.0 0.0 16, GROSS THLkMAL EN[RGY G[brR AllD (MWH) 1,758,640 18,725,424 244,021.017
- 17. GROSS [LIC1RICAL INIkGY GINERATED (MdH)
$73,100 0,148,700 B0,208,590 IB. NET [LECTRICAL (NERGY GENERATED (PWH) 653,609 5,921,41$
76,776,2f4 FAGE 1 CF 2
.m.
- - _ _.. ~. _ -. _. _ -. -
't a
OPtkAf!NG DATA REPORT (C0hilNUED)
DD(Klf h0. 50. ???
i i
I 1
DAtt OtttMBtR !$. 1990 TH15 MDhTH YR.TO.DAff CUHJLAT!vt
- 19. UNIT SCRylCC FACTOR 62.4 77.8 E7.6 I
- 20. UNIT AVAILAB!Lify FA0f0R 82.4 77.8 57.6
.I
- 21. Uhli CAPACITY FACfDR (U$1NG MDC htT) 72.9 70.0
$0.6 i
- 22. UN!1 CAPACITY FACTOR (011NG OCR hti) 72.2 09.4 50.1
.-t3. UNif FDRCCD OUTA$t RAf t
!?.6 14.8 14.$
l 24 $HJTDOWNS 5CHIDULt0 OVCR NEXT 6 MONTH $ (TYPt. Daft, AND DURAfl0N OF (ACH):
1 i
!$, IF $HUIDOWN AT (ND OF RCPORT PERIOD, t$11 MATED DATE Or STARTUPt i
t
- 26. UNIT 5 IN 1t$f_ $1ATUS (PRIDR TO COMM[RCIAL OPERAT10N):
FORICAST ACHitVID INITIAL CRITICAllTY' 09/10/73 IN!!!AL CLECTRICITY 02/1B/74 COMP.tRCIAL OPIRATION 07/05/74-i T
?
PAGE 2 0F i i
a E
\\
Ii 1
..__.a_..,.,__._.,_,,..-,_.__,_,---
k 1-0 PIRATING DATA RIPORT 4
i i
D0Citi NO. 50 278 DATI O(CCMistR 15, 1990 COMPLETED BT PHILADCLPHIA (LICTRIC COMPANY M J. BARON 1
$UPERv!SOR REPORTS GROUP PEACH BOTTOM AT0rlC POWER STATION itLEPH0h[ (717) 456 7014 LIT. 3321 OPtRATING STATU$
- 1. UNIT AAME: PEACH BOTTOM UNIT 3 NOT[5:
- 2. RtPORTING PCRIOD: NOVEMBER, 1990 3.LICIN5t0THERKALPOWER(MiT): -
3293 4.NAMCPLAftRATING(GROS $MdE):
1152 i
I
- 5. Ot$1GN [L(CTRICAL RATING (N[T H )
065
- 6. MAXIMUM DEPLNDABLE CAPACITY (GROSS Mit): 1098
- 7. MAXIMUM 0(PtNDABLE CAPACITY (NIT HWI):
1035
- 8. IF CHANGl5 0CCUR IN CAPACITY RATINGS (!T[M5 NUMBER 3 THROUGH 7) SINCE LAST RtPORT, GIVE PLA50NS:
t
- 9. POVER LIVtl TO WHICH RISTRICTED. IP ANY (Ntf FWE):
- 10. R( ASONS FOR RESTRICT!0SS, IP ANY:
THIS MONTH YR+TO-DATE CUMULATIVE ll,' HOUR $ IN RtPORTING PERIOD 720 8.016 139,728
- 12. NUMBIR OF HOUR $ RfACTOR WAS CRlilCAL 213.5 7,100.1 84,258,9
- 13. REACTOR R[$tRVE SHUTOOWN HOURS 0.0 0.0
- 0.0
- 14. HOURS GENERATOR ON-Llh[
-170.4 6.944.4 81.346.6
- 15. UNIT RIStRVE SHUTOOWN HOURS 0.0 0.0 0.0
- 16. GROS $ THERHAL ENERGY GENERAftD (KdH) 386.928 21.316.373 237,479.242
- 17. GROSS [LECTRICAL ENERGY G[NtRATED (KWH) 121,700 7.015,200-77,887,332 18 NET [LECTRICAL [NERGY GEN (RATED (PWH) 113.993 6.767,280 74.609,848 PAGE 1 0F 2 c
I f..
l-I l
i p'.
i e
e OPIRATING DATA ttPOR1 (CONtlNUCD)
DDClif NO, $0 278 l
DATE DECl*BER 15, 1990
+
THl$ MONTH YR.TO DAlt CuMJLAfivt t
19, UN!i. $tRVICC F ACIDR 23.7 66.6
$8.2 j-20 UNIT AVAILABilltf FACfDR 23.7 66.6
$8.2
!!. UN!f CAPAC!ff FAtt0R (U$!NG MDC Nti) 15.3 81.6
$1.6 t
- 22 UNIT CAPAC!ff FACTOR (U$1NG DER htt) 14.9 79.3
$0.1 g
- 23. UNIT FORCID OUTAGE RATE 0.0 5.5 12.6
. 24; $HUfD0VN$ $CHEDUL(0 OvtR Ntxt 6 MONTHS (TYPC, Daft, AND DURATION Or (ACH):
t$. If $ HUT 07WN AT (ND OF RtPORT PIRIOD, !$i!MAttD DATE OF $1ARTUP:
+
26i UNIT $ IN tt$1 $1Atus (PRIOR 70 COMMERCIAL OPtRATION):
FDRICA$1 ACHlIVED IN111AL CRITICAtttY 06/07/74
=
!Nii!AL (LECTRICITY 09/01/74 COMMERCIAL OPtRATION 12/23/74 i
9
'.a t
PAGE 2 0F 2 41 r
r t
1
~
l I
(.
N
+
< U - r-u.
.-,m.
we..%.,
.,,..-y,
,p.me,,
y_
.,we.,
,%m.,,,.,pngs,,,ny,,,--.
,ry,,-,,,-..y.
i l
l UNIT $HUTDOWNS AND POWER R(DUCTIONS 00CLtf NO. 50 - 277 UNIT NAME PIACH BOTTOM UNIT 2 DAtt DCCIMBER !$. 1990 RIPORT MONTH NOVirBER, 1990 COMPLITED BY PHILADELPHIA (LECTRIC COMPANY M. J BARON
$UP[RVISOR REPORTS GROUP PLACH BOTTOM ATOMIC POWER STAfl0N T[L(PHONI (717) 450-7014 EXI. 332)
METHOD OF LIC[N$tt
$YSTEM COMP 0NINT CAU$( AND CORRECTIVI TYFt DURAfl0N REASON
$ HUTTING 00WN EvtNT CODE C00C ACTION 10
- NO.
Daft (1)
(HOURS)
(2)
REACTOR (3)
REPORT f (4)
($)
PRtVINT RECURRCNCE 1
'22 901109 0.0 N
4
'N/A RB CONkOD CONTROL R00 PATTERN A0JU$7M[NT.
CLEAN VATERBOX TUPt $HEIT$.
RE ACTOR VA$ NOT $ HUT DJWN.
23-D_01115 F
126.7 H
1 2-90-35 (B
RELAYX INSTALL FILTER $ ON VARICUS 4KV UNotRVOLTAGE REL AYS.
126.7
.(1)
(2)'
(3)'
(4) -
'F - FORCID REASON METHOD.
EXHIBIT G - INSTRUCT!0NS
' $ - SCHEJUtt0 A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL.
FOR PREPARATION OF DATA -
B ~ MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY $HfETS FOR' LICENSEE i
C - REFUELING.
. AUTOMATIC $ CRAM.
EVENT RIPORT (LER) 0 - REGULATORY RC$TRICTION 4 - OTHER ([XPLAIN)
FILE (NUR[G-0161)
E - OP(RATOR TRAINING + LICINSE EXAMINAT!0N F - t,0MINISTRATIVE
($)
G - OPERAil0NAL [kROR (EXPLAIN)
H-OTHER([XPLAIN).
[?.HIBIT I - $Auf SOUR;E u
1' l
fL L'-
---.u-..
~.
1 4.
J UNIT $ HUT 00VNS AND POWER R(00C110NS DOCKET NO. 50 - 276 UNIT NAMt PEACH BOTTOM UNIT 3
\\
DAff DtCCMBtR 15. 1990 REPORT MONTH NOV[MS[R, 1990 COMPLETID BY PHILA0(LPHIA [LICTRIC COMPANY M. J. BARON surtRV150R RIPORTS GROUP P(ACH BOTTON ATOMit POWER $iAtl0N
'T(LIPHONE (717) 456-7014 CXI. 3321 MITHOD OF LIC[N$tt
$YST[M C0hPON(NT CAU$[ AND CORR [CilVI TYPt DURAi!0N REASDN
$ HUTTING DOWN IVINT C00(
CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PRtVINT RICURRENCE 18 901101 549.6 H
4 N/A ZZ ZZZZZZ-MID-CYCLt OUTAGE 19 90l!!7 F
0.0 H
4 N/A CH PUMPXX
- C" RfACTOR FE[0 PUMP COUPLING REPA!R.
RCACTOR WAS NOT $ HUT DOWN.
$49.6 (1)
(2)
(3)
(4)
F - FORCCD RfAt0N METHOD
[XHIB!T G - IN5iRUC110NS S - 5CHEDULED Aa EQUIPMF AT FAILURE ([XPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTE (ANCE OR TE$i
! - MANUA' $ CRAM.
(NTRY $H((TS FOR LIC[N5([
C - REFUELING 3 - AUTOMATIC $ CRAM.
(VENT R[ PORT (L(R) 0 - RIGUL ATORY R($TRICTION 4 - OTHER (EXPLA!N)
FILE (NUREG-0161)
E ~- OP(RATOR TRAINING + LICENSE (XAMINATION F - ADMINISTR.'.TIVE
($)
0 - OrtRATIONAL [RROR ([XPLAIN)
H-OTHCR(EXPLAIN)
EXHIBIT ! - SAME SOURCC o
(?
~
,