ML20065Q451
| ML20065Q451 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 12/07/1990 |
| From: | Fitzpatrick E GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20065Q454 | List: |
| References | |
| C321-90-2028, NUDOCS 9012170209 | |
| Download: ML20065Q451 (3) | |
Text
i
e GPU Nuclear Cogeratl5n G U Nuclear
- == %x.
~
201 316-7000 TELEX 136-482 Wnters Durect Dial Numbee C321-90-2028 December 7,1990 U.S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 Dear Sirst Subjc:ts Oyster Creek Nuclear Generating Station Docket No. 50-219 Updated Final Safety Analysis Report Pursuant to 10CFR50.71(e), CPUN is forwarding one signed original and 10 copies of the Updated Final Safety Analysis Report, Update #5.
Update 5 contains changes made to the facility or procedure changes as previously described in the UFSAR; safety evaluations supporting license amendments or other changes that did not involve an unreviewed safety question; and analyses of new safety issues up through June 30, 1990.
As stated in our correspondence to you dated December 27, 1989, GPU Nuclear recognized that discrepancies existed in the Updated TSAR, and efforts were initiated to upgrade its accuracy.
While we have a continuing program to upgrade the FSAR, the enclosed update includes significant improvemente particularly in the following areas:
a)
Containment spray /Emorgency Service Water System b)
Environmental Qualification of Equipment c)
Seismic Analysis for As-built Safety Related Piping Systems e)
Organizational Structure f)
Radioactive Waste Management g)
Chapter 1-15 Figures
>Q%
4 0 \\ 2 R() 7q13g,PU Nuclear Corcoration is a subsidia$ of General Pub;ic Utihties Corporation
.4 Page 2 J
C321-90-2028 1
Please note we are transmitting the Oyster Creek FSAR in its en'.irety and.
therefore any and all UFSAR documents in your possession must be destroyed.
Also, please note even though all pages have " Update, 5, 12/90" in the lower right corner, those pages that have changed since tne last update are shown by the bar in the right hand margin.
If you have any questions regarding this se'3mittal, please contact He. Patty Arcaro at 201-316-7748.
Very truly yours,-
(
E. E.
Fitzpa ick Vice President Oyster Creek EEF/pa cct Administrator, Region I Sworn to and Subs bed Senior NRC Resident Inspector before me this 7 day Oyster Creek NRC Project Manager of December, 1990.
A
/
JUDf7H M, my l
Notary Public of Near
(
' - %mmission Empires / ~
T-C c
y
,m_,
,,,_.._.,,,,,,y,.,y
,,m.,...
.._,,,cw
.-,..y_.__..,,,#,
y
f
' OYSTER CREEK FSAR UPDATE 5.
'12-20-90 Date Return To:
Betty Nash I
Procedure Distribution Control-l Room 130 Unit 2 Admin. 31dg.
TM.I NRC Document Control Desk 1
.I office of1 Nuclear ReactorLRegulatier.
U. S.= Nuclear Regulatory Commission Washington, DC 20555 Please replace the eight volumes of the Oyster Creek FSAR with the enclosed nine volumes (Update 5).
Remove and destroy the frontal and spinal inserts of the eight superseded volumes along.with the contents of these-volumes.
The binders may be used for other items at your discretion.
Also, within 10 days of receipt of the enclosed Update 5, please sign the acknowledgment at the bottom of this memo and return to Betty Nash at the above address.
Any questions should be directed to Patty Arcato-(Administrator, FSAR) Parsippany Extension 7748.
- #(,
]
4
-R.
E. Nevling TMI IMC Mgr.
i I hereby acknowledge receipt of the items above and have. complied with the instructions.
(Signature)
(Ext. No e )..
.(Date) 10-DCFORMS.105 go 5d6 -
240001 n