ML20065K283

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1994 for Catawaba Nuclear Plant
ML20065K283
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/31/1994
From: Weber R, Robert Williams
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9404190277
Download: ML20065K283 (13)


Text

11 I

Duke 1% er Compny Flertnc Center PO LLu 10%

Charldtte. N C Mul l(G DL*KE POWER April 15, 1994 U.S. Nuclear Regulatory Ccnmission Attention:

Ir' curmnt Control Derk Washington, D.C.

20555 RE: Catawba Nuclear Station Docket No. 50-413 and -414

Dear Sir:

Please find attached information concerning the performance and operating status of the Cutawba Nuclear Station for the nunth of March,1994.

Very truly yours,

/

.C R. L. Weber, Manager Nuclear Business Support RIR/ raw Attachm?nts xc: Mark lesser Bob Martin Regional Adttinistrator/ Region II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory 0 nmission U.S. Nuclear Regulatory Ocmrti.ssion 101 N rietta Street, NW, Suite 2900 Washington, D.C.

2055L Atlanta, GA 30323 INPO Records Center Ms. f%rgaret Aucoin Suite 1500 Nuclear Assurance Corporation 1100 Circle 7: Parkway Suite 200 Atlanta, GA 30323 655 E'ngineering Drive Norcross, GA 30092-2843 American Nuclear Insurers R. J. Freudenberger c/o D."ie Sherman, ANI Library Senior Resident Inspector Town Lenter, Suite 300S Catawba Nuclear Station 29 South Main Street West Hartford, CI' 06107-2445 9404190277 940331 f

PDR ADOCK 05000413 R

PDR t '

,-.s,,

'\\

j 4

File: GS-801.01

. U.S. NRC - Catawba April 15, 1994 Page 2 bc: K.'S. Canady.(EC08H)

T. E. Macref -(EC05N)

B. J. Horsley (EC03U)

N. A.. Rutherford. (EC07I) '

E. C. Fisher (MNS)

B.' W. Walsh (PB02L)

Judy Smoak (CNS)

C. D. Denton (PB05E)

Candace Paton.(PB02L)

D. R. Groux (CN01VP)

D. W. Denani (ON0102)

G. A. Copp (EC050) (File' l

B. T. Paulkenberry (EC07C)

J. S. Forbes (CNS)

E. G. LaCasse (CNS)

Z, L. Taylor (CNS)

-r r

L I

4 t

i 5

t

i I

w y

t-m-

4'

==

F OFERATING DATA REPORT D0CrEi NO 50dj3 DATE htjJ JJ.1994 DPERATING STATUS COMPLETED BY R.A. WiljjjLas_,

TELEPM 704 382-5346

1. Unit kaset Catawha 1 2, Pepr,rting Period: March 1,1994-March 31,1994
3. Licensed Thersal Power (MWt):

3411

4. Nameplate Rating (6tess MWel:

13055 Notes aNameplate Rating

5. Design Electrical Fating (Net MWe):

1145 (Gross MWel calculated as

6. Manleus Depend e le Capacity (6ross MWe):

1192 1450.000 MVA x.90 power

7. Marisue Dependable Capacity (Net MWe):

!!29 factor per Fage iii,

8. If Changes Occur in Capacity Ratings litees Nusber 3 Through 7) Since last NUREG-0020.

Report. Give Reasons:

9. Foger Level To Which Ret,tricted, if Any (Net MWel:

-10. Reason For Restrictions, If any:

This Month Yr.-to-Date Coeulative-

11. Hours In Reporting Period 744,0 2160.0 76753.0
12. Number Of Hours Reactor Was Critical 744.0 -

2133.6 57911.6~

13. Reactor Reserve Shutdenn Hours

--0--

- ' --0--

14. Hours Generator On-Line 744.0 2122.1 56775.5
15. Unit Reserve Shutdown Hours

--0--

-~0--

~0--

16. Gross Thersal Energy Generated (MWH) 247563B 6952497 184195033
17. Gross Electrical Energy Generated (NH) 829640 -

2496035 64860170

15. Het Electrical Energy Benerated (MWH) 943624 2364579 60909208
19. Unit Service Facter 100.0 98.2 74,0
20. Unit Availability Factor 100.0 98.2 74.0
21. Unit Capacity factor (Using MDC Net) 100.4 97.0 70.0
22. Unit Capacity Factor (Using DER Net) 99.0 95.6 69.3
23. Unit Forced Outage Rate 0.0 1.7 10.0-
24. Shutdawn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. linits in Test Status (Prior to Ceasercial Operation):

Forecast Athle$ed-INITIAL CRITICALITY INII!AL ELECTRICITY COMERCIAL OFERATION

q 4

i OPERATING DATA REPORT DOCKET NO _

503 13 UNIT-Catada 1 DATE6gril15,1994 COMPLETED BY P.A. Willians TELEPHONE-701-192-5346-

- MONTH _ March. 1994 E

AVERASE DAILY POWER LEVEL M

AVERAGE DAILY F0WER LEVEL t

( % -Net)

(MWe-Net)

I

!!39' 17 1141 2

1]??

18

!!35 3

1130 19 I L3,3 4'

!!36 20 1131 5

1137 21

!!?9 6

1136 22 1130 I

7 1133 23 1130 B

1133 24

!!25 9

1136 25 1120 f

10

!!38 26

!!34 11 1112 27 1124 12

!!40 2B 1126 4

13 1139 29 1133 14 1133 30 1136 15 1134 31 1149 16 1139 y-r

M UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-4131 UNIT NAME carawr$a 1 t

DATE us/Ad/ss REPORT MONTH March 1994 COMPLETED BY K.

a.

williams _

- TELEPHONE

(/us; 362-dded (1)

(2)

(3)

(4)

(5)

R MET-E-

HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE

'O P

DURATION-O DOiKN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S n

1 (1)

(2)~

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S. Scheduled A-Equipment Failure (Exp.l ain) 1-Manual.

for Preparation of, Data B-Maintenance or test 2-ManualLScram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatorv Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator-Training & License Fxamination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain) 9-m..a.L. - -

. mam-

-u mm.

- aN

'M---Wiv fr M

tu v

+

dV-"Ti

f' w

m.

r

'h N

F a-.m

7-

.._~ _

__ ;f T+

j

? y.

(

,i b

DOCKET: 50-413 UNIT: Catawba 1 Date:.04/15/94-NARRATIVE SUI 44ARY J !

f4Xmi: March 1994 Catawba Unit 1 began the nonth of March operating at or near 97.5% reactor power due to mactor coolant flow. 3he unit mturned to 100% full power on 03/31/94 at 1023 and cparated at or near 100% power the retnainder of the nonth.

I 1

ii Pmpamd by: R. A. Williams Telephone: (704)-382-5346 l

l

^

.. ~

R MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: Catawba, Unit 1 2.

Scheduled next refueling shutdown: February 1995 4

3.

Scheduled restart following refueling: April 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

THROUGH 6 WIL.L NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

S.

Scheduled date (s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, j

significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 l

(b) in the spent fuel pool: 484 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ---

i i

9.

Projected date of last refueling which can be accommodated by l

present licensed capacity: September 2009 DUKE POWER COMPANY DATE:

April 15, 1994 i

i l

)

Name of

Contact:

P.

A.

Williams Phone:

(704)-382-5346 j

i l

~.

U l

l7 jp t

[

OPERAT]NG DATA REPORT i

DOCKET NO 50-414

. DATE Aprill5,1994 l:

OPERATINS STA M COMPLETEDIII R.A.Wilitaes

[

TELEPHQNE 704-302-5346

(;

1. Unit Nase Cataba 2 t-
2. Reporting Pericdi March 1,1994-March 31,1994
3. Licensed Theraal Power (MWt):

3411 i'

4. Naseplate Fating (6ross MWelt 13054 Notes *Naseplate Rating l'
5. Design Electrical Rating (Net MWe):

1145 (Bross Mue) calculated 25-

.6. Mutsue Dependable Capacity (Gross MWe)r 1192 1450.000 MVA r '.90 power

7. Mo isus Dependable Capacity (Net MWe):

1129 factor per Page.ill,

8. If Changes Occur in Capacity Patings tiless Nutter 3 Thrt< ugh 7) Since Last NUREG-0020.

Report Give Reasons:

9. Power Level To Which Festricted, if Any (Net MWe):'

4 l

10. Reason for Restrictions, If any I-This Month Yr.-to-Date Cueulative.

p ii

11. Hours In Reporting Peried 744.0 2160.0 66749.0
12. Number Of Hours Reactor Was Critical 744.0 2160.0

$2100.9 i

13. Reacter Reserve Shutdown Hours

--0--

--0--

--0--

l 14, Hours Generator On-Line 744.0 2125.5 51205.0 l.

15. Unit Reserve Shutdown Hours

- --0-- -

i

16. Gross Thereal Energy Generated (MWH) 2496121

.6915933 163904872 l

17. Brus Electrical Energy Generated (MWH) 897214 2483958 58061257
10. Net Electrical Eneigy Generated (MWH) 852555 2356162 54646219
19. Unit Service Factor 100.0 98.4 76.7 l;
20. Unit Availability Factor 100.0 93.4 76.7 l-
21. Unit Capatity Factor (Using MDC Net) 101.5 96.6 72.3 I
22. Unit Capacity Factor (Using DER Net) 100.1 95.3 71.5
23. Unit Forted Outage Pate 0.0 1.6 9.4
24. Shutdown Scheduled Dver Next 6 Months (Type, Date, and Duration of Eacht:

l

_.... R e fitn14 n? - April 9 - 1994 - 60 rinyn l

l

25. If Shut Down At End Of Report Period. Estiaated Cate of Startco:

l;

26. Units in Test Status (Prior to Consercial Operationh

. Forecast Achieved 1-l-

m l

INiilAL CRITICALITY

'i j

INITIAL ELECTRICllY COMMERCIAL 0FERATION j

/

j'

's; I

i

^!

4'

't

I

-l 1

OPERATING OATA REF0kt i.

j-DOCKET NO

'50-414

.j i-UN!!

Catawba 2 DATE @gr1112dL94 COMLETED BY_Rduyllligei TELEPHONE 7,qt3BR-5h6'

]

3 t

i

.1 i

HONTH March,1994

[

l t

M AVEPAGE DAILY POWER LEVEL QA1 AVERASE DAILY F0WER LEVEL P

(MWe-Net)

(MWe-Net) j j

i

'l 1149 17

!!50 2

1151 19 1145 I

i 1

3 1101 19 1149 1

i 4

1147 20 1147

~i 1

8 5

1149 21 1143 i

i 6'

1149 22 1147 1

7 l!43 23 1144 I

8 1143 24 1139 e

9

!!49 25 1141 l

10 1150 26 1147 i

11 1152 27 11J4 L

1 12 1152 23 IlL7 l

[

13 1:49 29

_1147 i.

14

!!49 30.

1149 16 1150 f

,,.1

(.g.,. -

1

,0. j '

- 7w

.a..

..m

.m <.z.

1

s

- UNIT SHITi' DOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 d

UNIT-NAME urancie 2 -

DATE u-i / i d / 9 = _ _.

REPORT MONTH March 1994 CCMPLETED BY x.

a _. W11 Alans TELEPHONE

.itus) 3 u2-s346 -

(1)

(2)

(3)

(4).

(5) i R

MET-E HOD i

T A

OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE p

NO

' SHUTDOWNS OR REDUCTION S I,

b (1)

(2)

(3)

(4)

F Forced Reason-Method:

-Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee Event Report (LER (NUREG-0161))

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (S)

G-Operator Error'(Explain)

Exhibit I - Same Source H-Other (Explain)

.o l

(o I-o

DOCKET: 50-414 UNIT: Catawba 2 Date:

04/15/94 NTRRATIVE SLM4ARY T4 t m i: MTrch 1994 Catawtu Unit 2 bygan the notith of M1rch operating at 100% full power. The unit operated at or near 100% full per for the entire rienth.

[

,,))gjp$Y t

Prepared by: R. A. Williaita Telephone: (704)-382-5346 t

1

m._ ~_ _

k MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: Catawba.

Unit 2 2.

Scheduled next refueling shutdown: Anril 1994 3.

Scheduled restart following refueling: June 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION'OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

THROUGH 6 WILL NO. LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and-supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 211 8.

Present licensed fuel pool capacity: 141Q Size of requested or planned increase: - --

9. Projected date of last refueling which can be accommodated by f

present licensed capacity: September 2011 DUKE POWER COMPANY DATE:

Anril 15, 1994

{

Name of

Contact:

Ra A.

Williams Phone:

(704)-382-5346

.e-

-,y..m,-y,~~,.

.a,y,,-.

7,,,y.,_,,,,,n,__

4_ _,

y,,

,,.,, +,

-,.,e_w,_

,,.w,.

_,,n_.,

.e4 e,e

4 CATAWBA-NUCLEAR STATION MONTl!LY OPERATING STATUS REPORT February 1994 1.

Personnel Exposure -

The total station liquid release for February has been compared witti the Technical Specifications maximum annual dose commitment and was less than 10 percent of this' limit.

The total station gaseous release for February has been-compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.