ML20065H385

From kanterella
Jump to navigation Jump to search
Fourth Interim Deficiency Rept Re Seismically Unqualified Auxiliary Bldg Fuel Handling Zone Ventilation Fans.Initially Reported on 810506.Contract Awarded to Provide Qualified Coils in Fans.Next Rept by 830222
ML20065H385
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 09/28/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8210050094
Download: ML20065H385 (2)


Text

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 3 7401 400 Chestnut Street Tower II September 28, 1982 BLRD-50-438/81-35 BLRD-50-439/81-38 i

U.S. Nuclear Regulatory Cosatission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator r __

-? ?2 101 Marietta Street, Suite 3100 co m

>z Atlanta, Georgia 30303 zc

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - AUXILIARY BUILDING FUEL HANDLIh N

ZONE VElfrILATION FANS - BLRD-50-438/81-35, BLRD-50-439/81 FOURTH bQ

{

INTERIM REPORT g

The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on May 6,1981 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8111. This was followed by our interim reports dated June 5 and December 14, 1981 and June 11, 1982. Enclosed is our fourth interim report. We expect to submit our next report by February 22, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY k

L. M. Mills, Nanager Nuclear Licensing 1

Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 i

OtTICIAL cop 8210050094 820920 PDR ADOCK 05000430

-M[

S PDR An Equal Opportumty Employer

D c>

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 AUXILARY BUILDING FUEL HANDLING ZONE VENTILATION FANS NCR BLN BLP 8111 BLRD-50-438/81-35, BLRD-50-439/81-38 10 CFR 50.55(e)

FOURTH INTERIM REPORT Description of Deficiency The auxiliary building fuel handling zone ventilation supply air fans are mounted inside the common zone air intake plenums on elevation 686' along with hot water heating coils and chilled water cooling coils. Since these fans provide ventilation and cooling of filel handling engineered safety features (ESP) 7,ones, they are safety related. The heating and cooling coils are not qualified for seismic conditions since they were purchased nonseismic. During a seismic event, a hot water heating coil or chilled water cooling coil could rupture causing flooding of the air intake plenum and subsequent failure of both fuel handling zone ventilation supply air fans.

Interim Progress A contract has been awarded to have the coil manufacturer provide seismic qualification for both the hot water heating coils and the chilled water cooling cools. Additional information will be supplied in the next ceport.

di.T 2

sog me %i-

.e.

4-

..- --