ML20065D191

From kanterella
Jump to navigation Jump to search
Amend 88 to License NPF-10,correcting Page 3/4 3-8,Table 3.3-2, Reactor Protective Instrumentation Response Time, Item 4, Pressurizer Pressure - High
ML20065D191
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/13/1990
From:
NRC
To:
Shared Package
ML20065D192 List:
References
NUDOCS 9009240275
Download: ML20065D191 (2)


Text

,

~

.?P' hI 1]

9009240275 900913 p"

^ "" O Reviye4 September 13. 1990 TABLE 3.3-2

[

R_EECTOR PROTECTIVE INSTRUMENTATION RESPONSE TIMES 5ar;'

FUNCTIONAL UNIT RESPONSE TIME Eq 1.

Manual Reactor Trip Not App 1tcable m

2.

Linear Power Le=9 - High-5 0.40 seconds

  • 3.

Logarithmic Power Level - High 5 0.40 seconds *'

- 4.'

Pressurizer Pressure - High

< 0.90 seconds

.I~

5.

Pressurizer Pressure - Low 1 0.90 seconds

[

6.

_ Containment Pressure - High i 0.90 seconds 7.

Steam Generator Pressure - Low

$ 0.90 seconds N

i

[

8.

Steam Ge.wrator Level - Low

$ 0.90 seconds L

9.

Local Power Density - High I

i a.

Neutron Flux Power from Excore Neutron Detectors

< 0.68 seconds

  • b.

CEA Positions I 0.68 seconds **

c.

CEA Positions: CEAC Penalty Factor 50.53 seconds 10.

DNBR - Low j

a.

Neutron Flux Power from Excore Neutron Detectors

< 0.68 seconds

  • M b.

CEA Positions i 0.68 seconds **

c.

Cold Leg Temperature 30.68secondsN 4:

l m

d.

Hot Leg Temperature

< 0.68 secondsM e.

Primary Coolant Pump Shaft Speed i 0.68 seconds #

5

r:

f.

Reacter Coolant Pressure from Pressurizer 7 0.68 seconds g.

CEA positions: CEAC Penalty : actor.

50.53 seconds P

g

_.