ML20065A142

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 1 to Emergency Plan Implementing Procedures EPIP-26 Re Activation of Technical Support Ctr & EPIP-27 Re Activation of Operations Support Ctr.Revised Index Encl
ML20065A142
Person / Time
Site: Oyster Creek
Issue date: 01/28/1983
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19304A398 List:
References
NUDOCS 8302180082
Download: ML20065A142 (3)


Text

.

1 GPU Nuclear Uh g-P.O. Box 388 rorked River, New Jersey 08731 609-693-6000 Writer's Direct Dial Number:

January 28, 1983 Mr. Ronald C. Haynes, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA ~ 19406

Dear Mr. Haynes:

Subject:

Oyster C' reek Nuclear Generating Station Docket No. 50-219 Emergency Plan Implementing Procedures Enclosed are three copies of the Oyster Creek Emergency Plan implementing Procedures (EPIP's) which' have recently been revised.

This submittal is being made pursuant to Appendix 'E to 10 CFR 50 which requires that any changes to our implementing procedures be submitted within 30 days of such changes.

Very truly yours, Peter Billedler Vice President and Directcr Oyster Creek PBF: CMC:jal Enclosure s ec: Director (10 copies)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 y@

I M 8302180002 830214 CE PDR ADOCK 05000219 F

PDR

  • W f

M -,

b e

A8 am

01/20/83 4

Page 1 of 2 EMERGEEY PLAN IMPLEMENTING PROCEDURES INDEX PAGE DATE I

01/20/83 2

01/20/83 i

N CONTROLLED hi D cument Will Not Be gep, Up To Date m.w r

,--c-

_7 01/20/83 Page 2 of 2 I

EPIP TITLF LISTING EMERGENCY PLAN IMPLEMENTING PROCEDURES LAST LAST PROCEDURE NO.

Li,TLE REV. NO.

REV. DATE EPIP - 01 Classification of Emergency Conditions 3

07/20/82 EPIP - 02 Unusual Event 3

07/20/82 EPIP - 03 Alert 3

07/21/82 EPIP - 04 Site Emergency 3

07/21/82 EPIP - 05 General Emergency 3

07/21/82 EPIP - 06 Not Issued EPIP - 07 Personnel Injury 2

11/02/82 EPIP - 08 Fire 1

02/10/82 EPIP - 09 Offsite Dose Asse sment 2

11/02/82 EPIP - 10 Emergency Radiological Survey - Onsite 1

09/23/82 EPIP - 11 Emergency Radiological Survey - Jffsite 1

03/04/82 EPIP - 12 Personnel Accountability 2

01/27/82 EPIP - 13 Site Evacuation and Personnel Accountability After Sita Evacuation 1

02/17/82 EPIP - 14 Damage Control 1

03/04/82 EPIP - 15 Toxic / Flammable Gas Release 1

02/10/82 EPIP - 16 Radioactive Liquid Release Delete EPIP - 17 Activation of the Parsippany Technical Functions Center 0

02/26/82 EPIP - 18 Activation of the Remote Assembly Area 0

02/23/81 EPIP - 19 Einergency Dosimetry 1

02/17/82 EPIP - 20 Tornado /High Winds _

Delete EPIP - 21 Personnel Decontamination 1

02/19/82 EPIP - 22 Search and Rescue Operations 1

11/02/82 EPIP - 23 Thyroid Blocking 1

02/19/82 EPIP - 24 Emergency Respiratory Equipment 0

02/19/82 EPIP - 25 Activation of the Nearsite Emergency Operations Facility 1

09/23/82 EPIP - 26 Activation of the Technical Support Center 1

11/02/82 EPIP - 27 Activation of the Operations Support Center 1

11/02/82 EPIP - 28 Activation of the Farsite Emergency Operations Facility 0

02/24/81 EPIP - 29 Recovery Operations 1

03/04/82 EPIP - 30 Post Accident In-Plant Radiation Measurement 0

09/23/82 All EPAP's have been deleted 12/14/82 1

i

.