ML20064J753
| ML20064J753 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 02/28/1994 |
| From: | Mccraw E, Robert Williams DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9403220068 | |
| Download: ML20064J753 (14) | |
Text
.3 thae 1%urt Company
- Untrk Center l'O llox 1006 (krlotte, N C 28201 1004 DUKEPOWLM March 15. 1994-U.S Nucar Rer'. vury Commission
.Attentico:
Document Control Desk Washington, D.C.
20555 RE: Catawba Nuclear Station Docket No. 50 413 and -414 L
Dear Sir:
Please find attached information concerning the 3erformance and operating status of the Catawba Nuclear Station for the month of r bruary. 1994.
e Very truly yours.
- b. be. b k.hA E. O. McCraw. Manager Operations. Performance & Automation EOM/ raw Attachments xc:
Mark Lesser Bob Martin Regional Administrator / Region II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 101 Marietta Street.
NW Suite 2900 Washington, D.C.
20555 Atlanta GA 30323 INPO Records Center Ms. Margaret Aucoin Suite 1500 Nuclear Assurance Corporation 1100 Circle 75 Parkway Suite 200 Atlanta, GA 30323 655 Engineering Drive j
Norcross. GA 30092-2843 American Nuclear Insurers R. J. Freudenberger c/o Dottie Sherman, ANI Library Senior Resident Inspector Town Center. Suite 300S Catawba Nuclear Station 29 South Main Street West Hartford. CT 06107-2445 940322o069 94o228 gDR ADOCK05 cog 3 j
QV
4
- File:
GS 801.01-U.S. NRL - Catawba
. March 15, 1994 Page 2-bc: K. S. Canady (EC08H) s T. E. Mooney (EC05N)
B. J. Horsley (EC03U)
N. A. Rutherford (EC07I)
E. C. Fisher (MNS)
B. W. Walsh (PB02L)-
Judy Smoak (CNS)
C. D. Denton (PBOSE)
Caridace Paton (PB02L)
D. R. Groux (ON0lVP)
D. W. Denard (ON0102)
G. A. Copp (EC050) (File)
B. T. Faulkenberry (EC07C)
J. S. Forbes (CNS)
E. G. LaCasse (CNS)
- 2. L. Taylor (CNS) i 1
P 4
s o
6 c
-~.
r-
OPERATINS DATA REFORT DOCKET NG 50-413 DATE March 15. 1994
- Q_PERAtlfKi Sl Ait3 COMPLETED BY R.A. Williams TELEPH0)lE 704-39.g-5346 f1.UnitNaae: Catawba 1
- 2. Reporting Pericd: February 1, 1994 febraart 28, 1994 3.LicensedTherealPcwerIMWt):
3411
- 4. Naseplate Rating (Gross MWe h 1305:
Notes tNaseplate Rating
- 5. Design Electrical Rating (Net MWe):
1145 (Gross MWe) calculated as
- 6. Maxieus Dependable Capanty (Bross MWel:
1192 1450.000 MVA x.90 power
- 7. Maxisus Dependd le Capacity (Net NWel:
1.129 factor per Page lii, 8.'If Changes Occur in Capacity Ratings litees Number 3 Through 7) Since Last
.NUFEG-0020.
Feprt. Give Peasons:
r
- 9. Fewer Level Io Which Restricted, If Any INet MWe):
- 10. Reason for Restricticas, If any:
f f
This Month Yr.-to-Date.
Cusulative
- 11. Hourt, In Reporting Period 672.0 1416.0 76009.0
- 12. Nunter Of Heurs Reactor Was Critical 672.0 1399.6 57167.6 I
- 13. Reacter Reserve Shutdenn Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 672.0 1378.1' 56031.5
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Stoss Thermal Energy Generated (MK 223 % 11 4476859 1817'9395
- 17. Steis Electrical Energy Benerated (M M 305536 1606395 63970530
- 13. Net Electrical Energy Eererated (MWH1 764145' 1520955 60065584 19, Unit Service factt r 100.0 97.3 73.7 l
20.UnitAvalldilityfactor 100.0 97.3 73.7 2!. Unit Capacity Facter (Ustng MDC Net) 100.7 95.1 69.7
- 22. Unit Coacity Factor O! sing DER Net!
99.3 93.0 69.0-
- 23. Unit forced Outage Rate 0.0 2.6 10.1 e
- 24. Shutdown kneduled Over heut 6 Manths (ly;9, Date, and Duration of Each):
i None E5. If Shut ben At End Cf Report Period. Estiaated Date of Startup:
- 26. Units It1 Test Status (Prior to Ceanarcial Operation):
forecast Achieved l
l INITIAL CRiflCAll1Y
[NITIAL ELECTAIClit COME4CIAL OPERATICN I
j
.i l
J
4 i i-OFERATINS LATA REPORT 1
i i
DOCTET NO 50-413 UN!!
Catawba 1 DATE March 15, 1994 COMPLETED By R.A. Willians TELEPHONE 704-382-5346 HONTH Fetruary, 1994
[dl AVERABE DAILY F0WER LEVEL BAl AVERASE DAILY F0WER LEVEL (MWe Net)
(MWe-Net) 1 1141 17 1139 2
1140 19 1139 r
3 11 0 19 1135 4
.lj40 20 1135 i
5 1137 21
!!35 t
6 1137 22 Ll35 7
1139 23
'1136 j
E 1134 24 1138 i
!128 25 1141 3
10 1139
'26 1141 1118 27 1141
.12 1139 2B 1140
]
13 1139 14
!!40 15 1138 16
!!39 u
.i
- s.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME w Awea 1 DATE usl1 bin REPORT MONTH February 1994 COMPLETED BY x.
A.
wiu1 lam TELEPHOhT tIus;-364-3446 (1)
(2)
(3)
(4)
(5)
~
R MET-E HOD T
A OF-LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE' E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S 4
. (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sneets For Licensee's C-Refueling 3-Automatic Scram Event Report (LER) 4 D-Regulato n Restriction 4-Other (Explain)
File ( M EG-0161)
E-Operator Training & License Examination F-Administrative (5)Exhibit I
-Same Source G-Operator Error (Explain) (Explain)
H-Other
-o 4
4 v A m
--,-w,*-
i4 w
r ev it w
7 v'
v'
--P'^
t--
7 W"
w.-vr r-t-
M1r'w."t t
iwu
--1
. _ _ ~ -.. _,__
i-DOCKET: 50-413 UNIT: Catadn 1 Date:
03/15/94 NARRATIVE SCM &RY
!OtW: February 1994 I
Catada Unit 1 operated the month of February at or near 97.5% reactor power due to reactor coolant flow the entire month. The generator operated at or near 100% power the entire tronth,
-)
f9 1
?
1 i
h
~
l i
P 3
Prepared by: R. A. Williams Telepirne: (704)~382-5346
. i 1
I
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: Catawba, Unit 1 2.
Scheduled next refueling shutdown: February 1995 l
3.
Scheduled restart following refueling: April 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date (s) for submitting proposed licensing action and supporting information.
f 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
j 7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 484 4
8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase.
9.
Projected date of lart refueling which can be accommodated by present licensed capacity: September 2009
?
DUKE POWER COMPANY DATE:
March 15. 1994 i
Name of
Contact:
R.
A.
Williams Phone:
(704)-382-5346 4
?
r
U-9 P
4 DPERATING DATA REPORT LOCKET NO 50-414 a
DATE March 15, 1994
-QFERATINGSTATUS C0rPLETEDBY-R.A. Willi ns TELEPHONE 704-30?-5346
- 1. Unit Nue Catawba 2 2, Reporting Period: February 1,1994-February 20,19?4
- 3. Licensed thereal Fower (MWt):
3,11
- 4. Naeplate Rating (Gross Se):
1305e.
Notes ANaseplate Rating
- 5. Design Electrical Rating (Net MWe):
1145 (Gross MWe) calculated as 6, Marinus Dependable Cap 6 city (Stoss MWe):
1172 1450.000 M A
.90 power 7, Mninus Dependable Capacity (Net Ne):
!!29 factor per Page lii,
- 9. If Changes Occur in Capacity Patings (iteas %ber 3 Through 7) Since Last
.NURE6-0020.
Report. Give Beasons:
L
- 9. Power Level To Which Restricted, if Any (Net NWe):
- 10. Reason For Restrictions, If anyt e
This Month Yr.-to-Date Cuealative i
!! Hours In Reperttr.g Period 672.0 1416.0 66025.0
- 12. Nusber Of Hars Reactor Was Critical 672.0 1416.0 51356.9
- 13. Feacter sesene Shutdm Hoars
--0--
--0--
--0--
- 14. Houis Gererator DeLine 672.0 1301.5 50461.0
- 15. Unit Reserve Shutdown Heurs
--0--
~ 0--
--0--
- 16. Gr oss Thermal Energy Generated (NH) 2136125 4419712 161308751:
- 17. Gross E!ectrical Energy Senerated (Mk) 765391 1596784 57164043 l
- 13. het Electrical Energy Generated (WH) 725400 1503577 53793634
- 19. [htt Service Facter 100.0 97.6 76.4
- 20. Unit Availability factor 100.0 97.6 75.4 El. Unit Capacity factor IUsing MDC Neti 95.6 94.1.
72.0
- 22. Unit Capacity facter (Ustr<g DER Wet) 94.3 92.7 71.2 2
- 23. Unit forced Outage hte 0.0
$.4 9.5
- 24. Stutdeva screduled Over Next 6 P.cnths tige, Date, and Deation of Ea:hi:
,,_Re f u e l l tm - A p r i l 29, 1994 - 60 davs
- 25. If Shut Down At End Of Fecort Fericd. Estiested Date of Startup:
- 26. Uptts in lest Statss (Prior to Ceasercial Operation):
forecast Achieved INiflAL CR111CAlliY IN111AL ELECTRICliY CONMERCIAL DPERATION J
1 n
-~-.. -
,a,.
.n.
v e. -
r
A j
j l'
CFEH i!NG CATA REFORT DOCrEl NO 50-414 UNIT Catamba 2 DATE Natch 15, 1994 COMPLETED BY R A. Willi n s TELEPHONE 704-392-5346 NONTH februnn 1994 5
DE[
AVE 90E LAILY F0iiER LEVEL
[A(
AVERASE DAILY F0WER LEVEL (M!ie-tie t 1 (MWe-Net) 1 1155 17 1152
- 5 2
1156 18 1151 3
1154 19 1149 4
1153 20 1147 5
1150 21 11 %
6 1DI 22 692 7'
!!51 23 144 8.
!!66 24 662 l
9 1136 E5
!!20 10 1851 26
'1152 11
!!54 27
!!54 12
!!33 20 1153 13 1152 i
14 1L53 15 1152 16 1153 i
?
~
UNIT SHUTDOWNS AND POWER' REDUCTIONS DOCKET NO.
50-414-UNIT NAME talawsA z.
DATE v3/id/ys-REPORT MONTH February 1994 COMPLETED BY x.
A.
W1Lb1AMd TELEPHONE
(/ust-362-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE S
SHUT EVFET SYS-CAUSE AND CORRECTIVE N
Y
. DURATION O
DOWN REPORT TEM COMPONENT ACTION TO O
P DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 2-P 94-2-23 F
A CB PUMPXX HOLDING AT 15% POWER FOR ADDITION OF OIL TO
'2B' REACTOR COOLANT PUMP (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G-Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee' C-Refueling 3-Automatic Scram Event Report ~ (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Araining & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I --Same Source H-Other (Explain) a
. =r
/
l DOCKET:.50-414 UNIT: Catawba 2 l
Date:
03/15/94 NARRATIVE SLMMY j
MJtIIH: Fehmary 1994 I
Catawba Unit 2 began the nanth of February operatimJ at 100% full power. On 02/21/94 at 2145 the unit began power decrease of 2.5% per hour to allow oil addition to '2B' l
reactor coolant pump. On 02/22/94 at 1446 decreasing condenser vacuum was observed at 56% power. The condenser vacuum recovered when additional steam was supplied to l
turbine steam seal. On 02/23/94 at 0545 the unit held at 15% power for '2B reactor coolant punp oil addition and investigation / resolution of loss of vacuum during power decrease. The unit returned to 100% pcwr on 02/25/94 at 0610. The unit operated at or near 100% full power for the remainder of the nonth.
l l
l l
Pmpamd by: R. A. Williams
'Iblephone: (704)-382-5346
l f
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility nam'e: Catawba.
Unit 2 2.
Scheduled next refueling shutdown: Agr11 1994 3.
Scheduled restart following refueling: June 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4-THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date (s) for submitting proposed licensing action and supporting information.
t 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance ana2.ysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 1HE 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increace: ---
- 9. Projected date of last refueling which can be secommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE:
March 15. 1994 Name of
Contact:
R.
A. Williams Phone:
(704)-182-5346 l
o CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT January 1994 1.
Personnel Exposure -
The total station liquid release for January has been compared with the Technical Specifications maximum annual dosc commitment and was less than 10 percent of this limit.
The total station gaseous release for January has been compared with the Technical Specifications maximum annual dose commitment and was less than 10' percent of this limit.
e l' o
. _ _