Monthly Operating Repts for Feb 1994 for McGuire Nuclear Station
ML20064J458
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 02/28/1994
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20064J454 List:
References
NUDOCS 9403210233
Download: ML20064J458 (10)


Text

. - . -. . _ - ,

4 DPERATINS DATA REPORT DOCKET NO 50-369 DATE darch 15. 1994 CDNPLETED EY R.A. Willi ns Q?lFATINGSTAiui TELEPHGNE 704-332-5346-

1. Unit N m McGuire 1
2. Reprtir,g Period: February 1,1994-February 22,1994

' 3. Li'.er. sed Thermal Feuer (MWt): 3411 .

4fNueplateilating(SrcssMWe): 13056 l Notes eNameplate Rating

5. Design Electrical Rating (Net MWe): 11B0 (Bress MWel calculated as
6. Muina Dependable Capacity iBross MWeh 1171 1450.000 MVA1. 90 power
7. Muisen Dependable Capacity (Net MWe): 1129 factor per Page lii,
3. If Chanps Occur in Capacity Ratings (Itess Nuster 3 Thrriugh 7) Since Last MURES-0020.

Report. Give Reasons:

9. Pener le<el To Which Restricted, If Any met Ne):
10. Reascn For Restrictions, If any:

This Month Yr.-to-Date Cuaulative

11. Hcurs in Reporting Peried 672.0 1416.0 107352.0
12. W M er Of Heurs Reactor Was Crit cal 97.0 629.0 74650.3 13, Reacter Reterve Shutdown Hours - --0-- --0--
14. He;rs Secerator On-Line 94.8 626.8 738M.3
15. Unit Reserve Shutd wn Heurs --0-- --0-- --0--

-16. Brcss Thermal Energy Generated ( M ) 299969 209 % 90 228319326

17. Grcss Electrical Energy Generated (MWH) 103183 726002 79688157-
19. Net Electrical Energy Benerated (NH) 996M 694641 75118791

-19. Unit Service Factor 14.1 n.3 68.9

20. Unit Anilability Factor 14.1 44.3 69.B
21. Ur.it Capacity factor (usirg NLC Net) 11.8 42.8 60.9
22. Unit Capacity f acter tusing DER Net) 11.3 41.0 59.3
23. Unit Forced Outage Rate 85.9 55.7 15.0
24. Shutdown Scheduled Dver Next 6 Months (Type, Date, and Duration of Eachl:

Refueling m

- August 19, 1994 - 65 days

25. If Swt Iban At End Of Report Feriod. Estisated Iate of Startup: ._
26. Units In Test $tatus (Prier to Coenercial Operationi Forecast 'ctr u j INITIAL CRITICAllTY INITIAL ELECTRICITY COMERCIAL OFERATION 9403210233 940315 PDR ADOCK0500g9 R

- - . . ~ , . . - . _ . . - . _ . ~ . _ _ . . . . . . . _ - - . . . - . - . - _ . . ~ . _ . . . . . _ . , . . - ~ . ~ . . . . . . . - - . . - . . _ - - .

i i

QPERATING DATA FEPORT  ;

DOCKET NO 50-359 UNIT M Suire !

DATE ff arch 15,1994-  !

COMPLETED BY R.A. Willians e TELEPHONE 704-3BP-5346

?!CtifH fervary, 1994 i

Ml HERASE DAILY F0WE'.; LEVEL . Dit AVERAEE DAILY POWER LEVEL '

0'We-Net) Wie-Het )

e 1 0 17 - 0 2 0 IB 0 3 0 19 0 4 0 20 0 5 0 21 0 l a

6 0 22 - 0

? 'O 23 0 t

8 0 24 0 ~

[

.I u

9 0 25 71B i

i 10 0 26 1135 11 0 27 1135  :~

l 12 0 29 1135

.13 0 l

14 0 15 - L l-

)

lb 0 .

'I i

I  ?

' . si ; c, m. ~_ .-_u. . . _._ . . . _ _ . _ . . _ . _ . . _ . _ _ _ _ _ _ . - . . . . . . . _ . . . . , _ _ _ - . - . . . . . . . , . ._-.._.__.. u .. - -._ .- , .,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME Mtuuixt 1 February 1994 DATE us/13/34 REPORT MONTH ^

COMPLETED BY x. a. w 1LLied TELEPHONE (/ vel-362-3346

~

(1) (2) .(3) (4) (5)

  • R MET-E HOD ,

T A OF LICENSE ,.

N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE .t O P DURATION O DOWN REPORT TFJ1 COMPONENT ACTION TO

. DATE E HOURS N R/X- NO. CODE CODE PREVENT RECURRENCE i

1 94- 1 .F. 577.15 A --

CH HTEXCH '1D' STEAM' GENERATOR TUBE LEAK 1.- P 94- 2-25 'S --

B --

IA INSTRU HOLDING AT 51% POWER FOR  !

CALIBRATION OF NUCLEAR INSTRUMENTATION SYSTEM i.

t 4

'I t

(1) (2) '(3) (4)

F Forced Reason: Method: Exhibit G - Instructions l- S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data i

B-Maintenance or test 2-Manual Scram Ent y Sheets For-Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulato7 Restriction 4-Other (Explain) . File ( N EG-0161)

, E-Operator Training &. License Examination F-Administrative (5)

G-Operator Error -(Explain) Exhibit I - Same Source- .

H-Other (Explain)  !

1

(

a i

1 4

DOCKETf: 50-369 UNIT: McGuire 1 -i

.1 Date: 03/15/94 -i NARRATIVE SLM@RY

.j PONIH: Febntary 1994 McGuire Unit 1 began the month of February in an outage for approximately 24.05' days I..

for '1D' steam generator tube leak. The unit returned to service on 02/25/94 at

~ 0109. The unit began to increase power and held at 51% power on 02/25/94.from 0800 to 0904 for calibration of nuclear instrumntation system. The unit returned to full

' power on 02/25/94 at 1855 and operated at or near 100% full power the remainder of -

the mnth. -. i i

Prepared by: R. A. Williams Telephone: . (704)-382-5346 j

,l 4

.}i 0 4 9

i 10NTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire, Unit 1
2. Scheduled next refueling shutdown: August 1994
3. Scheduled restart following refueling: October 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed.by Safety Review Committee regarding unreviewed safety questions?.

5. Scheduled date (s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 583 4
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE: March 15, 1994 Name of

Contact:

R. A. Williams Phone: (704i-38'-5346 2

I

= . :. -

CFERATING DATA EEPORT DOCKET NO $0-370 DATE Marth 15.'1994 (2%EAllH 5TATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346

1. Unit haae: McGuire 2
2. Reportirg Periedt February 1, 1994-February 23,1994 3.1.icensed theraal Power MWth 3411
4. Wateplate Rating (Gross MWeh 130 9 Netes 'Naseplate Rating-15, Design Electrical Rating (Net MWeh !180 (Gross MWel calculated as
6. Maxinue Dependable Capattty (Gross %h 1171 1450.000 MVA x .90 power
7. Matissa Cependable Capanty (Net MWeh  !!29 f atter per Page iii,-
3. If Changes Occur in Capa: tty Ratings (! tees Nunter 3 Through 71 Since Last NUREB-0020.

Re;crt. Give Reasans:

9. Fower Level Te Which Restricted, If Any (Nat MWe h
10. Reason for Restrictions, If ano 1 This Month Yr.-to-Date Cumulative
11. Hours In Reperting Period 672.0 1416.0 87648.0
12. Nester of Hours Reactor Was Critical 672.0 1273.4 67115.4
13. Reactor Reserve Shuta m Hoars --0-- --0-- - 1
14. Hours Genenter On-Line 672.0 1271.1 66147.3- !l
15. Unit Reserve Shuth at Hours - - --0--
16. Stoss Thersal Energy Ger,erated MWH) 2283841 4302693 216174690- I

- 17i Gross Electrital Energy Benerated (MWH) 801677 .1508183 75557118

19. Net Electrical Energy Secerated (MWH) 773388 1451323 72417443
19. Unit Service Facter 100.0 89.0 75.5

. 20. Unit Availability Fatter 100.0 89.8 75.5 21.1; alt Capacity Factor (Usteg MDC Net) 101.9 90.8 72.3 l

' 22. Unit Capa:ity factor tusing DER Net) 97.5 86.9 ~ 70.0 J

23. thit forced Catage Rate 0.0 10.2 7.2 1
24. Shutdown Scheduled Over Next 6 Menths (type, Date, and Duration of Eachn: -

None 2$.If$5atDoniAtEndOfReportPeriod.EstimatedDateofStart'sp

26. Units In Test Status (Frier to Ccesercial Operatienh Forecast Achieved l

1 INITIAL CRITICALITY INIT!AL ELECTRICITY 1 COMERCIAL GPERATION d 1

ig -l 1

l

_ . . .- .. . . . _ - - _ . _ _ ._ _ . _ _ - =. ,. - - _ -

CPERATING LATA REPORT

, DCCKET N3 50-370 UNIT McGuire 2 CATE March 15, 1994 COMPLETED Bf R.A,Willians-TELEPHONE 704-392-5346 .

4 MONIH Feb ruar y, 1994 LAf AVERAGE DAILY POWER LEVEL DAY AVERASE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1148 17 1146 2 1148 19 1146 3 1!50 19 1147

-4  !!53 20 1148 5 1153 21 1148 6 1153 22 115]

7 1153 23 1151 E 1153 24 1152 9 1149 -25 1154 10 ,,1150 26 1157 i

11 1152 27 1156

, '12' 1152 28 1157 13-  !!51 14 114B

~15- 1150 16  !!49-o - w- a -,- v

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mwy1xt, 2 DATE v3/1d/94 REPORT MONTH February 1994 COMPLETED BY x. A. W I LL14ew TELEPHONE t/usi-36z-5346 (1) (2) (3) (4) (5)

R MET-E HOD T

A OF LICENSE N Y -- S SHUT EVENT SYS- CAUSE AND CORRECTIVE

.O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- .

Method: Exhibit G - Instructions

.S Scheduled A-Equipment. Failure (Explain) 1-Manual for Preparation'of-Data B-Maintenance or test 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram Event Renort (LER)

D-Regulatory Restriction- , ,

4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5).

G-Operator-Error (Explain) Exhibit.I - Same Source H-Other (Explain)

W. -

DOCITP: 50-370 WIT: McGuire 2 Date: 03/15/94 NARRATIVE SO4W&

M RIM February 1994 McGuire Unit 2 began the nonth of February operating at 100% full power. The ' unit operated at or near 100% full pcwar for the entire nonth.

i l

.)

Prepared by: R..A. Williams Telephone: (704)-382-5346 l

. .m . .-.

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire, Unit 2
2. Scheduled next refueling shutdown: November 1994
3. Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF' ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS -4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by safety Review Committee regarding unreviewed safety questions?

5. Scheduled c' ate (s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis. methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool-: 817 -
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2001 DUKE POWER COMPANY DATE: March 15, 1994 j Name of