VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Oct.

YEAR 1978 (Revised December 5,1978) 1 i

SUBMITTED:

ND

_ r,%

SUPEMuIENDENT - STATION OPERATIONS' APPROVED:

MANAh 7812200257

l 1

i t

OPERATING DATA REPORT 50-338 DOCKET NO.

DATE 33-/-/8 COMPLETED BY D. C. Woods TELEPHONE 7n't AQA 'il51 x 360 OPERATING STATUS North Anna Notes

l. Unit Name:

October 1978

2. Reperdag Period.
3. LiesmeadThenmalPower(MWt):

2,775 947

4. Namupiste Radng (Gross MWe):

907

5. Desips D.carisal Rathag (Not MWe):

928

6. Maximusa C,
Capacity (Gross MWe):

898

7. Maximum C.;

": Capacity (Not MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Tiuoegh 7) Since Last Report, Give Reasons:

N/A

9. Power Level To which Restricted,if Any (Net MWe):

N/A

10. Renssen For Restrictions,if Amy:

N/A I

~

This Month Yr to.Dete Cumeistne 745 3,553 3,553 I1. Hoers la Repordng Period b/9.4 3.242.1 3.242.1

12. Number Of Hours Reacter Was Critical 0

0 0

13. Reactor Romerve Shutdown Hours
14. Hours Generator On.Une 657.2 3.211.4 L911 a
15. Unit Reserve Shutdown No.,.

0 0

o

16. Gross Thermal Energy Generated (MWH) 1,750,627 M.826 8.379.R76
17. Gross Electncal Energy Generated (MWH) 560,197 2.634.107 2.684.107
18. Net Electrical Energy Generated (MWH).

528,766 2.517.863 2.517.863 88.2%

90.4%

90.4%

19. Unit Semco Facto,
20. Unit Avaanbdity Factor 88.2%

90.4%

90.4%

79.0%

78.9%_

78.9%

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 78 34 7R_1Y 7R 1%

1

23. Unit Forced Outage Rate 5.66%

1.5%

1.5%

24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.and Durstma of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior ta Comnwrcial Operation):

Forecast Achieved INITIAL CRITICAUTY INITIAL ELECTRICITY 4

COMMERCIAL OPERAT10N M77)

-.g

---m-n

,,-.n.

gy,-,.

.,-e o

AVERAGE DAILY UNIT POWER LEVEL f

DOCKET NO.

50-338 UNIT North Anna #1

~

DAM II/7/70

0. C. Woods ND BY TELEPHONE 7012894-518i1__ x 360

. youm October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nm)

(MWe Nm) 0 844 2

0 is 840 3

  1. 91 is 834 73 836 4

20 481 832 5

21 750 833 6

22 834 836 7

23 844 634 s

24 837 407 9

25 785 820 to 2,

13 839 27 823-847

!2 23 825 845 831 13 29 840 828 14 3,

844 3

830 15 845 16 INSHUCITONS On this fermat, list the average dady unit power levelin MWe Net for each dayin the reporung month. Compute to the nearest whole rnegawatt.

(9/77) i

DOCKET NO.

UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME Nntth anna 1 DATE IQY - 1 147A October COMPLETED 8Y

. G. Neufer REPORT MONTil TEl,EPil0NE 703-894-5151 x 229

_3 E

E-3

  • E ~>

l_icensee Ee Cause & Corrective No.

Date

(

5 s

3$M

{j Action to Event j[

., 5 g Report #

<a 's Psevent Recurrence H

g 5

78-28 781003 F

12.3 B

4*

Manual Shutdown to repair blown plug on high pressure turbine cross under pipe rewelded returned to power.

78-29 781004 F

11.4 A*

3 High flux rate 2/4 channels caused reactor trip due to fault in a gain pot.

78-30 781024 F

15.7 A*

1 Manual reactor / turbine / generator trir due to a loss of cooling water to "A' reactor coolant pump. Repaired faulty cooling' water valve.

I 2

3 4

F: Forced Reason:

Method:

ExhiblI G - Instructisms 5: Scheduled A-Equipment Failure (Explatn) 1-Manual for Prepasation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event ReporI (LER) File (NUREG-D-Regulatory Restricthm 4-Other (Explain) 0161)

E-Operator Training & Ucenx Examinallon F-Administrative 5

i G4)perational Error (Explain)

Exhibit I - Sanw Source l

W/77) 11 Oth-r (Explain)

  • See attached sheet.

Pag 2 i or i UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH October UNIT NAME North Anna YEAR 1978 DATE Nov. 1, 1978 COMPLETED BY A. G. Neufer NOTE: Shutdown 78-27 was concluded 10-3-78 at 0023.

48.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

78-28 (4)

Reactor was not shutdown.

78-29 (A)

While power range nuclear instrumentation channel N-44 was in the trip mode due to maintenance, operator attempted to adjust remaining 3 NIS channels in accordance with calorometric data when adjust knob locking device was released. A voltage spike occurred causing a high flux rate trip in channel N-41.

This made up the 2/4 ccnsequence for automatic reactor trip.

78-30 (A)

The reactor was manually tripped by the operator from 100%

power due to a loss of cooling water to "A" reactor coolant pump. After the Rx was tripped, the reactor coolant pump was shutdown to preclude pump damage. Subsequent to the occurrence, a section of charging and volume control piping was being returned to service. A drain valve was left open while the piping was pressured. The drain valve allowed water to spray in the vicinity of the containment valve g'

penetration area. 1-TV-CC-102E "A" reactor coolant pump component cooling outlet valve was in the area. 1-TV-CC-102-E went closed at about the same time causing low CC flow alarm alerting the operator. Upon inspection of 1-TV-CC102E, electricians found a broken micro switch as well as moisture.

Either problem could have caused the valve to short out and close.