Monthly Oper Rept for Nov 1978
ML20064H492
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/01/1978
From: Woods D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20064H490 List:
References
NUDOCS 7812200255
Download: ML20064H492 (5)


Text

_ _ - _ _ _ .. . _ _ _

4 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH, November YEAR 1978 S'JBMITTED:

% ._\b +

SUPEMEBNDENT - STAT::0N OPERATIONS APPROVED:

Y l/

MANAfd 7 8 3 g g g g g g3

l

  • n OPERATING DATA REPORT DOCKET NO. 50-338 DATE 17-01-7R COMPLETED BY 0.C. Woods  !

TELEPHONE 70'l-RQA-5151 x 360j i

OPERATING STATUS i f

,,gg % North Anna Unit 1 Notes j

2. Report &ss Per6ed: NOV'50*P I978 -

2,775 3

3. Licensed Thanaal Power (MWt):
4. Namepasse Rating (Gross'MWe):

94# * ' ' ' ' ' '

[

5. Dengs Electrkal Rattag (Net MWe):
6. Maahmune N -- "': Capacity (Gross MWe): 97E
7. Maxianum Dependable Capacity (Not MWe): RQA t l '
8. If Changes Occ::r in Capacity Ratings (Items Nanber 3 Through 7) Since Last Report. Give Ressons:

N/A

9. Power Level To Which Restricted.lf Any (Nt MWe): N/A
10. Reasons For Resenctions. If Any: N/A f

r This Month Yr to Date Cuomistive

11. Hours la R ,%g Period 720 4,273 4.273
12. Nweber Of Hours Reactor Was Critical 716.8 3,958.9 3,958.9  ;
13. Reactor Reserve Shutdown Hours 0 0 0  ;
14. Hours Generator On4.ine 714.9 3.926.3 3.926.3  :

4 15. Unit Reestve Shutdown Hours '. 0 , 0 .- o r

16. Gross Thermal Energy Generated (MWH) 1.894.450 10.278.276 10.274.276 <
17. Gross Electncal Energy Generated (MWH) 606.775 . _ .

3.290.882 3.290.882 f

18. Net Electrical Energy Generated (MWH) . 572,250 3,090.113 3.090.113 ,.
19. Unit Service Factor 99 3% 91.9T Q1.QT [
20. Unit Avadsbiinty Factor 99.3% 91.9% 91,gg i
21. Unit Capacity Factor (Using MDC Net) 88.5% 80.5% 80.5%

87.6% 79.7% 7Q_7g I

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.7% 1.4% 1,4g i
24. Shutdowns Scheduled Over Nest 6 Months (Type. Dste, and Duration of Each1: .

Snubber Inspection April 1979, I week. j i

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Pnor to Commercial Operation 1: Forecas: Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 64/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT North Anna #1 DATE 12/01/78

, , ,y D. C. Woods 703-894-5151 x 360

. November

~ MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (ww m 3 616 806 1 37 681 808 2 33 798 810 3 3, 800 808 4 :n 780 809 5 21 6 806 22 808 7 803 23 814 g

s 805 781 24 8 809 9 25 806 810 to 7,

804 27 808 809 808 12 :s 811 810 13 2, 811 803 e4 3a 804 II 31 16 806 INSTRUCTIONS On thn format, list the average dady unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77) l

DOCKET NO.

50-338 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME North Anna 1 DATE Dec. 4. 1978 November COMPLETED BY A. G. Neufer REPORT MON 11f TELEPilONE 703-894-5 51 x 229 e.

- E E

, 5? 3 jE"4 Lkensee Eg vt Cause A Connective i

N. e . Date g 3g ( .3 s 5 Event g3 EO

^"""

b

$$ 5 j;?, g Repost # mO g Prevent Recurrence 6

78-31 781101 F 5.1 A* 2 Manual Reactor Turbine, Generation Trip due to total loss of cooling on "A" Phase of the unit main trans-former. Repaired oil pump / cooling fan relay contactor. Returned to power .

t, 1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: SchedulcJ A Equipment Failure (Emplain) I Manual for Psepasasion of Dasa B-Maintenance of Tes: 2-Manual Scrasn. Ensty Sheets fos Licensee C.Hefueling 3-Ausomatic Scenen. Event ReposI(LER) File (NUREG-D-Regulatory Restriction 40thes (Emplain) 0161)

E-Operator Training & Ucense Emandnasion F Adunnistrative 5 G Operational Essor (Emplain) Exhibis I-Sanie Sousee r8/77) llother (Emplain)

  • See Attached Sheet

Pag] 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH November U IT NAME North Anna YEAR 1978 DATE Dec. 4,1978 COMPLETED BY A.G. Neufer 78-31 (A) Both sets of cooling fans and oil circulating pumps were found to be inoperative. Attempts to restart cooling system failed.

A ramp down of power was begun. Shortly thereafter, it was discovered that this particular type transformer must not be energized with no cooling. At that time, the reactor, turbine and generator were tripped manually by the operator. Investigation determined a burned out circuit conttctor. .

1 f