- l,
. Ccmmsnwsalth Edis:n Braidwood Nuclear Power Station
..m
. Z; Route #1, Box 84
\\' U' ' Braceville, Illinois 60407 Telephono 815/458 2801 March 10,1994 Bw/94 0044 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk
Dear Sir:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period February I through February 28, 1994.
JC. L. Kofron Station Manager Braidwood Station Attachments cc:
J.B. Martin, NRC, Region III R.R. Assa, U.S.N.R.C.
I.D.N.S.
NRC Resident Inspector, Bwd INPO Records Center D.L Farrar, Nucl. Reg. Serv. Mgr.
D. M. Saccomando, Nucl. Lic. Admin.
D.R. Eggett, Nucl. Eng. Dept.
S.M. Berg, Jr., Site V.P., Dwd Nucl. Fuel Serv., PWR Plant Support Results Eng. Group, Sys. Eng., Bwd Nucl. Group, Sys. Eng., Bwd I.D.N.S. Resident Inspector, Bwd J.M. Bunecicky, Westinghouse D.R. Seavers, A.N.I.
9403170314 940228 7
PDR ADOCK 05000456 d
l-
.tULevu,.
PDR s.
=
d
- .r.
4
. 4 e
4 II.'
MONTIILY REPORT FOR BRAIDWOOD UNIT 2 A.
Summary of Operating Experience Braidwood Unit 2 entered the month of February 1994 at approximately 90%
capable The Unit operated routinely through the end of the month.
W 4
- I 2
i
.m
B.
OP8 RATING DATA REPORT Docket No: 50 - 457' Unit: Braidwood 2 Date: 03/10/94 Completed by: Paul Stanczak Telephone: 815-458-2801 OPERATING STATUS I)
Reporting Period: February 1994 Gross Hours: 67]
- 2) Currently Authorized Power Level (MWt):
341[
Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
JJ20 Max Dependable Capacity (MWe-gross):
J_121 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (if Any):
Mqne
- 4) Reasons for restrictions (If Any):
None This mo Yr tq_dqts
- Cumulative
+!
4
- 5) Report Period liours:
672.0 1,416.0 47,051.0
- 6) llours Reactor Critical:
672.0 1,416.0 39,730.1 7)- RX Reserve Shutdown Hours:
.0
.0. -
0
- 8) Hours Generator on Line.
672.0 1,416.0 39,402.3
- 9) Unit Reserve Shutdown flours:
.0
.0
.0 l
- 10) Gross Thennal Energy (MWHt):
2,220,994.2 3,888,819.7 118,377,016.7
- 11) Gross Elect. Energy (MWH):
771.,424.0 1,342,432.0 40,456,255.0
- 12) Net Elect. Energy (MWH);
747,227.0 1,292,750.0 38,759,333.0
- 13) Reactor Service Factor:
100.0 100.0 84.4
- 14) Reactor Availability Factor:
100 0 100.0 84.4
- 15) Unit Service Factor:
100.0 -
100.0 83.7 1
- 16) Unit. Availability Factor:
100.0 100.0 83.7
- 17) Unit Capacity Factor (MDC NET):
99.3 81,5.
73.6
- 18) Unit Capacity Factor (DER NET):
99.3 81.5 73.6
- 19) Unit Forced Outage Rate:
0.0 0.0 3.5
- 20) Unit Forced Outage Hours:
0.0 0.0 1446.0
- 21) Shutdown Schedule Over Next 6 Months.
N/A
- 22). If Shutdown at end ' f Reporting Period, N\\A-o Estimated Date of Startup.
h
~.--
C.
AVERAGE DAILY UNIT NET POWER LEVEL LOG J
Docket No: 50'-457 Unit:- Braidwood 2
'l Date: 03/10/94-Completed by: Paul Stanczak Telephone: 815-458 2801
.I MONTil: February 1994 Day MWe.nej Day MWp-nqj I) 1007 16) 1137
- 2) 1043 17) 1140
- l 3)
- 18)
I139
- 4)
JMi*
19) 1141
- 5)
JJ43
- 20) 1136
- 6) 1140
- 21) 1139 *
.i 7) 1141
- 22) 1139
- j 8)
HH*
23)
I140
- 9) 1136*
24) 1077 10) lI46
- 25) 957 11)
J141
- 26) 936 12)
JJJ3
- 27) 1038 13) 11 12.
- 28) 1128*
14)
H)J
- 29) 15)
H22
- 30) 31)
- Due to condenser efliciency l
t--
M
D.
Unit Shutdowns / Reductions Docket No.:
50 - 457 Unit:
Braidwood 2 Date:
03/10/94
^
Completed by:
P. Stanezak Telephone:
815-458-2801 i
I Report Period: Februarv 1994 LER Cause & Corrective Action Date Tvee Hours Reason Method Number System Component to Prevent Recurrence None.
i F
I r
i TYPE REASON METHOD SYSTEM & COMPONENT F - Forced'-
A - Equipment Failure Maint or Test 1 - Manual S - Schsduled -
. B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination.
5 - Reduced Load (NUREG-0161).'
F - Administration G - Oper Error
- H - Other. -
m.
t E.
Safety /Re:ief Valve Operations Docket No.:
50 - 457 Unit:
Braidwood 2 Date:
03/10/94 Completed by:
P. Stanezak Telephone:
815-458-2801 i
l Valves No. & Type Plant Description of Event Date Actuated Actuation Condition None 5
t U
9 w
F.
Licensec Event Reports - Unit 2 The following is a tabular summary of all Licensec Event Reports submitted during the reporting period February I through February 28,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensec Event EspsalEtinihst D_at.t Tiite or occusgrtqq None.
1
,f
-n
8 4
e HilAIDWOOD NUCI EAll POWEll STATION UNrr i AND UNIT 2 i
510NTillN PEltFOllalANCE ItEPOllT Contmonwealth Edison Company NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKER NO. 050-457, LICENSE NO. NPF 77 4
y+..
y 9
c
a 1.
MONTilLY REPORT FOR BRAIDWOOD UNIT I A.
Summary of Operating Experience Braidwood Unit i entered the month of February 1994 at approximately 100% -
capable. The Unit operated routinely through the end of the month.
l
,I
)
y
B.
OPERATING DATA REPORT Docket No: 50 - 456 i
Unit: Braidwood I l
Date: 03/10/94 j
Completed by: Paul Stanczak
-l Telephone: 815-458 2801 OPERATING STATUS
- 1) Reporting Period: February 1994 Gross llours: 622
- 2) Currently Authorized Power Level (htWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe nct):
112.0 Max Dependable Capacity (MWe-gross):
11.25 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (If Any):
Npng N_o_n.s
- 4) Reasons for restrictions (if Any):
o This mo Yr to_d_atg Cumulative
- 5) Report Period Hours:
672.0 1,416.0 48,969.0
- 6) Hours Reactor Critical:
672.0 1,416.0 39,014.2
- 7) RX Reserse Shutdown llours:
.0
.0
.0 8)llours Generator on Line:
672.0 1,416.0 38,441.0
- 9) Unit Reserve Shutdown Hours:
.0
.0
.0
- 10) Gross Thermal Energy (MWilt):
2,135,231.4 4,612,064.2 117,552,591.2 1!) Gross Elect. Energy (MWil):
745,480.0 1,606,620.0 40,421,207.0
- 12) Net Elect. Energy (MWii):
721,165.0 1,554,179.0 38,696,996.0
- 13) Reactor Service Factor:
100.0 100.0 79.7
- 14) Reactor Availability Factor:
100.0 100.0 79.7
- 15) Unit Service Factor:
100.0 100.0 78.5
- 16) Unit Availability Factor:
100.0 100.0 78.5
- 17) Unit Capacity Factor (MDC NET):
95.8 98.0 70.6
- 18) Unit Capacity Factor (DER NET):
95.8 98.0 70.6
- 19) Unit Forced Outage Rate:
0.0 0.0 9.2
- 20) Unit Forced Outage Hours:
0.0 0.0 3905.1
- 21) Shutdown Schedule Over Next 6 Months.
Refuct 3/4/94
.l 22)If Shutdown at End of Reporting Period,
)
Estimated Date of Startup.
4/27/94 l
.=.
1 4
i 1
C.
AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 456 l
Unit: Braidwood i J
Date: 03/10/94 l
Completed by: Paul Stancrak I
Telephone: 815-458 2801 MONTil: February 1994 Ray M We-ns_t par M W e-n.s1
.I 4
I) 1111
- 16) 1084 2) 11 14
- 17) 1076 3)
IL4_4
- 18) 1073 4) 1144
- 19) 1066 5) 1J43
- 20) 1!)il 6)
JM 21) 1052 7) 1103 22) 1043 8) 1LO2 23) 1029
~l 9) 1089 24) 1028 10) 1094 25) 10 2 1I) 1094 26) 1020
.)
12) 224 27) 10J2
~
13)
LO8(2 28) 222 14)
.1060 29) 4 15)
L012 30) 31) 1
.)
- Due to condenser efficiency o
.j 5:
=.
i D.
Unit Shutdowns / Reductions Docket No.:
50 - 436 Unit:
Braidwood 1 Date: 03/10/94 Completed by:
P. Stanczak-Tebphone:
815-458-2801 Report Period: Februarv 1994 LER Cause & Corrective Action No.
Date Tme Hours Reason Method Number Svstem Component to Prevent Recurrence
- None.
0 I
t i
i P
TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test -
1 - Manual
- S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for
' C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet
. D - Regulatory Restriction 4 - Continued
. Licensee Event Report (LER) File E - Operator Training & Licensee Eumination
~ 5 - Reduced Load (NUREG-0161).
F - Administration G - Oper Error H - Other
=
m r
v
~'-
.m_
,f ^J Qi :
E.
Safety 1 Relief Valve Operations Docket No.:
50 - 456 Unit:
Braidwood 1 Date:
03/10/94 Completed by-P. Stanczak i
Telephone:
815-458-2601 3
r Valves No. & Type.
Plant Description of Event Date -
Actuated Actuation Condition None t
i I
h b
4 4
v 4
t s.
. s.
- l
. 1 i
F.
Licensee Event Reports - Unit i The following is a tabular summary of all Licensco Event Reports submitted during the reporting period, February I through February.28,1994. This information is provided pursuant to the reportable occurrence reporting q
requirements as set forth in 10 CFR $0.73.
Licensec Event 1
Rgport Number
.Dats.
Title of Ocqntrence
-l None.
' l i
l-l 1
1 4.
i -
5 2
0 y
g t r f wv---.
~
r y
e--
y, w
--y
--w--
-+-
n>
-+.. -
e.. -+-,,
w e
p-4