Omaha Public Power District 1623 HARNEY E OMAHA, NEaRASMA 68102 e TELEPHONE 536 4000 AREA CODE 402 December 30, 1982 LIC-82-413 Mr. Robert A. Clark, Chief U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation i
Division of Licensing
[
Operating Reactors Branch No. 3 Washington, D.C.
20555
Reference:
Docket No. 50-285
Dear Mr. Clark:
I NUREG-0737, Item I.A.1.3
[
Shift Manning Requirements I
0maha Public Power District's letter dated October 15, 1982 identified E
January 1,1983 as the schedule for fully implementing the subject requirements, assuming that two Senior Reactor Operator (SR0) candidates 5
passed SR0 examinations administered in September, 1982.
The District 6
was recently informed that one of the SR0 candidates failed the examin-ation. Accordingly, the District must again revise our schedule for having two Reactor Operators (R0's) and two SR0's on each of our six operating shifts, since there are now only eleven qualified SR0's on the i
shif t operating staff at the Fort Calhoun Station.
The District's earliest schedule for fully meeting the shift manning 1
requirements is now dependent upon the completion of training by the District's SR0 candidates and the Commission's 1983 examination schedule gr for the Fort Calhoun Station.
The SR0 candidate identified above who 1
failed the September,1982 examination will be eligible for a re-examination in early February,1983.
The District also has three additional SR0 candidates in training and these individuals are scheduled to be ready for examination in July or August,1983.
Please note that two of these three candidates were identified in the District's October 15, 1982 letter as undergoing training to be ready to take their SR0 examinations in early 1983. Based on the training that remains to be completed by these two individuals, this schedule was overly optimistic and they will not be ready for examination until the summer of 1983.
The four indi-viduals identified 1.bove represent the District's present resources for filling the one open SR0 position.
5 l
l 0
E B301110602 821230 PDR ADOCK 05000285 i
t P
PDR t
o Mr. Robert A. Clark LIC-82-413 Page Two Scheduling, conducting, and grading examinations for these SR0 candi-dates are the other factors which must be coordinated and completed before the Fort Calhoun Station can fulfill the shift manning require-ments. The District's intent is to have a twelfth qualified SR0 on shift ae soon as practical, considering the availability of our SR0 candidates detailed above and the 1983 examination schedule.
The District believes that based on the above resources, we should meet the schedule identified in the staff's proposed final rule which now identi-fies January 1,1984 as the implementation date for this NUREG-0737 item.
Sincerely, W. C./(Jonesh Division Manager Production Operations WCJ/TLP:jmm I
cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _