Monthly Operating Repts for Feb 1994 for Sequoyah Nuclear Plant
ML20064F868
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/28/1994
From: Hollomon T, Powers K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9403150475
Download: ML20064F868 (10)


Text

. . . , . . . . . . _ _ . . _ . _ _ . _ _ _ _ . _ _ . . _. . _ _ . .

7y _

4 A

Tunsue vanov Asney ev. ion.ce um am sany oaw temwssn> ann March 11, 1994 l

l l

1 U.S. Nuclear Regulatory Commission I ATTN: Document Control Desk l Washington, D.C. 20555 j 1

I Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - FEBRUARY 1994 MONTilLY OPERATING REPORT Enclosed is the February 1994 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.

If you have any questions concerning this matter, please call J. W. Proffitt at (615) 843-6651.

Sincerely, Ken Powers Acting Site Vice President

-Enclosure cc: See page 2 1

~h r

9403150475 940228~

PDR' .ADOCK'05000327 R' PDR .m

- /[i f

l

. .. - . = ~ _ . _ . _ . . _ _ . _ . _ _ . . _ . _ . _ . . . . . _ .. . . _ _ . . _ ~ . . - _ . . . _ . . . _ _

." .4* g 4

U.S. Nuclear Regulatory Commission Page 2 March 11, 1994 l

i cc (Enclosure):

INPO Records Center ,

Institute of Nuclear Power Operations l 700 Galleria Parkway l' Atlanta, Georgia 30339-5957 Mr. D. E. IaBarge, Project Manager  ;

U.S. Nuclear Regulatory Commission l One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Ted Marston, Director Electric Power Research Institute P.O. Box 10412 Palo Alto, California 94304 NRC Resident Inspector Sequoyah Nucicar Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administration U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission Region II ,

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711  !

Mr. F. Yost, Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C. 20005 l

.I

~

3 l

l l

1

)

I i

TENNESSEE VALLEY AUTHORITY l NUCLEAR POWER GROUP j SEQUOYAll NUCLEAR PIANT 1 MONTIILY OPERATING REPORT TO THE NUCLEAR REGUIATORY COPMISSION FEBRUARL1914 UNIT 1 IX)CKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER S0-328 LICENSE NUMBER DPR-79

~

l' OPERATIONAL

SUMMARY

FEBRUARY 1994 IMIL1 The Unit 1 Cycle 6 refueling outage continued. Unit i remained in Mode 5 through the end of the month.

UNIL2 Unit 2 generated 785,496 megawatthours (MWh) (gross) electrical power during the month with a capacity factor of 102 percent. Unit 2 was operating at approximately 100 percent reactor power at the beginning of February.

On February 8, 1994, at 0941 EST, a power reduction was initiated for maintenance on the 2C No. 3 heater drain tank pump. Reactor power was reduced to approximately 70 percent so that the pump could be removed-f rom service. Repairs were completed, and a power increase was initiated on February 9 at 0550 EST. Unit 2 was operating-at 100 percent reactor power at 1455 EST that day.

Unit 2 continued to operate near 100 percent power for the remainder of the month.

. _ . - _.~__._; _ . _ . . . - _ .___ . . _ _ _ _ . . . _ _ _ . _ . . _ _

4 AVERACE DAILY UNIT POWER LEVEL DOCKET NO. 50-327 UNIT No. One DATE: _Q3-Q.L-94 COMPLETED BY: I._L_Rallamon TELEP110NE: 1615) 843-7_123 MONTH: _fERRUARY_Ut2h__

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Ne d DAY (MWe-N.e.O 1 -1 17 -7 2 -1 18 -4 3 -L 19 -4 4 -4 20 -3 5 - - 6_ 21 -4 6 _. -6 22 -4 7 -6 23 -4 8 -4 _ 24 -5 9 -6 25 -5 10 -6 26 -5 __

11 -7 27 -5 12 -5 28 -5 )

13 -5 29 NA 'l l

14 - Z. 30 NA 15 -6 31 NA 16 -8

- - - .-- -- . - . - . . ___ _ __ _ _ _ _ _ _ _ _l

AVERACE DAILY UNIT F0WER LEVEL DOCKET NO. __50:328 UNIT No. __Two DATE: _Q3-01295 COMPLETED BY: L J. Ital 10 mon TELEP110NE: .(115)_84_3-Z528 MONTil: _FEBRUARL1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DM (We-lie.t) EM (WerNetl 1 __ _1.13 2 17 Ll37__

2 l1ho 18 L139 3 1L41 19 11h0 4 . . _ _ _ 11h1 __

20 11AL _

5 __. IlhL 21 11AL i 6 L141 22 LL42 7 LIAL 23 1139 8 _latz 24 1130 9 1933 25 1139 10 1137 26 1145 11 1140 27 LL45 12 1141 28 1144 13 LL43 29 NA 14 1.1h2 30 NA 15 Lisa 31 NA 16 LL41

.-. . ~ ... . - . . - . . . . . . - . - . .. - - - . . .. ... .. . - - - .

l OPERATING DATA REPORT DOCKET NO. _50:327 ' _

DATE .QJLQJd4 COMPLETED DY L_L_U.allomon_

TELEPHONE 16JhLBal-11Zd__

OfLEALIEtilalVS.

l Notes l

1. Unit Name: _ .Sigugyahj) nil _Qng ____l l
2. Reporting Period: February 1994 _ l l
3. Licensed Thermal Power (MWt): 3411.Q l l
4. Nameplate Rating (Gross MWe): _1220.6 l l S. Design Electrical Rating (Net MWe): ._1_14_Q . 0 l l
6. Maximum Dependable Capacity (Gross MWe): J.151a l l
7. Maximum Dependable Capacity (Net MWe): ._1111.0 l I.  ;
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report; Give Reasons: l I
9. Power Level To Which Restricted, If Any (Net MWe): N/_A
10. Reasons for Restrictions, if Any: N/A 1

I This Month Yr-to-Date Cumulative

]

l

11. Hours in Reporting Period 672 i d16__ 11LQ21._._ '
12. Number of Hours Reactor Was Critical 0 Q_ JLQ2.9
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-tine 0 0 54.02.8.5 15, Unit Reserve Shutdown Hours 0 0 0
10. Gross Thermal Energy Generated (MWH) 0 Q_ __.ll6&3J54
17. Gross Electrical Energy Generated (MWH) Q 0 __ _JQJ0L654
18. Net Electrical Energy Generated (HWH) -2.982 -7.513._._ .58.156.519
19. Unit Service factor 0 f_

t 49.4

20. Unit Availability factor 0 r_ 49.4 .
21. Unit Capacity factor (Using MDC Net) -0.4 -0 1_ 41J _.
22. Unit Capacity factor (Using DER Net) -0.4 -QJ_ 45 4 _
23. Unit forced Outage Rate 0 0 38.7
24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: _jiarch_.26. 1994 (gtn synel

> m . - . __ _ . . _ . . _. m-_._ _ _ _ _ _ . . . _ . . . _ . _ . .__ ... _ . _ . _ . _.

>, . .?

OPERATING DATA REPORT DOCKET NO. _5.0-328 DATE _Q31QJZ94 COMPLETED BY LAlfojj amon TELEPHONE .l6151 a4_3-15EL OELRAIJEL5lAIUS l Notes l

1. Unit Name: ._ SegynyatLU.nlt Two l l
2. Reporting Period: _1ghtyary 1994 l l.
3. Licensed Thermal Power (MWt): _3411.0 l -l
4. Nameplate Rating (Gross MWe): _12Z026 l l
5. Design Electrical Rating (Net MWe): 114LD l l
6. Maximum Dependable Capacity (Gross MWe): .11461 0 l l ,

7 .' Maximum Dependable Capacity (Net MWe): 1106.0 l I

8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) $1nce Last Report, Give Reasons: ,
9. Power level To Which Restricted, If Any (Net HWe): N/A
10. Reasons For Restrictions, If Any: N/A_.

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 672 1,.4. LL._ 10Z,90L ,_
12. Number of Hours Reactor Was Critical 612.0 1.356 1. 60.115
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 672.0 1.30LL SL535J_.
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) LZZO20ZL.a__ 4,351 J E Z_ _lE.11L556
17. Gross Electrical Energy Generated (HWH) 785.496 1.4932.QJh_._ _52 426J60
18. Net Electrical Energy Generated (MWH) . 760,222_ 1.4492357 ;_59J27.643
19. Unit Service Factor 10 0.0 92 . Q_. 55J

'20. Unit Availability factor 10Q,0 9Z,0_ S QJ_._

21. Unit Capacity Factor (Using MDC Net) 10ZJ_ 9L5_ 52.4 ,
22. Unit Capacity Factor (Using DER Net) 9a 5 . ahZ 50J _
23. Unit forced Outage Rate Q20 8.0 35 7 24, Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

UniLZlyrle_LRefue.llag,.Qutagel_ July 3.1994: 67 day.:L,_.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: . . - _

t

", , , . n ,-n+ - .r. ,--,,.a..n-. .- ,. - - - . - .

e:

DCCKET NO: 50-327 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT MANE: -One DATE: 03/07/94 .

. REPORT HONTH: Februarv 1994 COMPLETED BY:T. J. Hollomon - *'

TELEPHONE:(615) 843-7528 Method of Licensee Cause and Corrective Duration Shutting Down Event System Component Action to No. Date Type l (Hours) Reason Reactor 3 Report No. Code Code 0

Prevent Recurrence 1 940201 5 672 C 4 N/A N/A N/A The Unit I Cycle 6 refueling outage continued.

R 3

i

'f I I 2 3 #

I:F Forced Reason: Method: Exhibit G-Instructions S: Scheduled -A-Equipme<tt Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram _ Entry sheets for Licensee f

C-Refueling 3-Automatic Scram Event Report (LER) File 0-Regulatory Restruction 4-Cnntinuation of Existing Outage (NUREG-1022)- ,

E-Operator Training and License Examination 5-Reduction. ,

F-Administrative 9-Other I 5

G-Operational Error (Explain) . Exhibit I-Same Source s H-Other (Explain) f 4

_ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ ________E_____._______ _ _ _ - _ + - __ _ -

DOCKET NO: 50-329 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: Two .

DATE: 03/07/04 -

REPORT MONTH: Feb rua ry 1994 COMPLETED BY:T. J. Hollomon TELEPHONE:f6151 843-7528 Nethod of Licensee Cause and Corrective Duration Shutting Down Event System Compgnent Action to . ,

4 No. 'Date Type (Hours) Reason Reactor3 Report No. Code Code Prevent Recurrence 2 940208 F N/A B 5 N/A N/A N/A On February 8, at 0941 EST, a power level reduction was initiated for  ;

maintenance on the ZC No. 3 heater drain tank pump. Reactor power was 1

reduced to approximately 70 percent so that the pump could be removed f rom service. Repairs were i completed, and a power increase was initiated on February 9 at 0550 EST. Unit 2 was operating at near 100 percent reactor power to the end of the month.

i r

I 2 #

F: Forced Reason: Method: Exhibit G-Instructions 5: Scheduled A-Equipment failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee

=

C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1022)

E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other c

G-Operational Error (Explain) " Exhibit I-Same Source H-Other (Explain) 1__ _ _ _ . _ _ _ . ___ _ _ _ _ . . _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . -. _______.- ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _