Amend 6 to Facil Oper Lic NPF-2 Rev Tech Specs.Change Auth Plant Startup W/High Efficiency Particulate Air Filters in One of Two Redundant Trains of Penetration Room Filtration Sys at 99.93% Efficiency Instead of at 99.95%
ML20064E778
Person / Time
Site: Farley 
(NPF-02-A-006, NPF-2-A-6)
Issue date: 11/09/1978
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20064E780 List:
References
NUDOCS 7811220118
Download: ML20064E778 (4)


Text

-

UNITED STATES

/

'o, NUCLEAR REGULATORY COMMISSION 8

j WASHINGTON, D. C. 20555

y s.,*..../

ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSEPH J. FARLEY NUCLEAR PLANT, UNIT NO. 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No.6 License No. NPF-2 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The applicatien for amendment by Alabama Power Company (the licensee) dated October 26, 1978, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of e

the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; I

and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

I 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

i 781122Cug l

. "(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

6, a re l

hereby incorporated in the license. The licensee shall operate the facility in accordance with the l

Technical Specifications."

3.

This license amend, ment became effective as of October 26, 1978.

FOR THE NUCLEAR REGULATORY COPNISSION l

ll% 4 & W A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance: November 9,1978 j

i

ATTACHMENT TO LICENSE AMENDMENT NO.6 FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Replace page 3/4 7-23 of the Appendix "A" Technical Specifications with the enclosed page. The revision is identified by Amendment number and contains a vertical line indicating the area of change.

The corresponding overleaf page is also provided to maintain document completeness.

I

i PLANT SYSTEMS 3/4.7.8 ECCS PUMP ROOM EXHAUST AIR FILTRATION (PENETRATION ROOM FILTRATION 5YSTEM)

LIMITING CONDITION FOR OPERATION 3.7.8.1 Two independent penetration room filtration systems shall be OPERABLE and aligned to the spent fuel pool room.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With one penetration roca filtration system inoperable, restore the inoperable system to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the fcilowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. NOTE: On a one time basis starting on October 26, 1978 and ending at 12:30 pm on November 1,1978, Specification 3.0.4 does not apply. This allows startup (Mode 2) and power operation (Mode 1) with Train B of the Penetration Room Filtration system operable in the degraded condition as described in Alabama Company's letter dated October 26, 1978.

SURVEILLANCE REQUIREMENTS 4.7.8.1 Each penetration room filtration system shall be demonstrated OPERABLE:

a.

At least once per 31 days on a STAGGERED TEST BASIS by:

1.

Initiating, from the control room, flow through the FEPA filter and charcoal adsorber train and verifying that the train operates for at least 15 minutes, b.

At least once per 18 months or (1) after any structural main-tenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any vent-ilation zone cummunication with the system by:

1.

Verifying that with the system operating at a flow rate of 5000 cfm 10% and exhausting through the HEPA filters and charcoal adsorbers, the total bypass flow of the l

system to the facility vent, including leakage through I

the system diverting valves, is 1 1% when the system 1s tested by admitting cold 00P at the system intake.

l FARLEY - UNIT I 3/4 7-23 Amendment No.6 l

!