Other: LIC-93-0163, Forwards Rev 1 to Surveillance Test Procedure (STP) IC-ST-SI-0005, Channel Calibr of SI Tank SI-6A Nitrogen Pressure,Loop P-2901 & Rev 1 to STP IC-ST-SI-0008, Channel Calibr of SI Tank SI-6A Wide Range Level,Loop L-2904X, LIC-93-0183, Forwards Strip Charts Generated During Calibr & Operation of Safety Injection Tank Level & Pressure Instrumentation.Chart Verbally Requested by SD Bloom,Nrc Project Manager, ML20059C198, ML20059K564, ML20064D173
|
MONTHYEARLIC-93-0163, Forwards Rev 1 to Surveillance Test Procedure (STP) IC-ST-SI-0005, Channel Calibr of SI Tank SI-6A Nitrogen Pressure,Loop P-2901 & Rev 1 to STP IC-ST-SI-0008, Channel Calibr of SI Tank SI-6A Wide Range Level,Loop L-2904X1993-06-11011 June 1993 Forwards Rev 1 to Surveillance Test Procedure (STP) IC-ST-SI-0005, Channel Calibr of SI Tank SI-6A Nitrogen Pressure,Loop P-2901 & Rev 1 to STP IC-ST-SI-0008, Channel Calibr of SI Tank SI-6A Wide Range Level,Loop L-2904X Project stage: Other ML20045D3251993-06-22022 June 1993 Forwards SE for CEOG Rept CEN-387-P,rev 1, Pressurizer Surge Line Thermal Stratification Evaluation. Rept Found Acceptable Project stage: Approval LIC-93-0183, Forwards Strip Charts Generated During Calibr & Operation of Safety Injection Tank Level & Pressure Instrumentation.Chart Verbally Requested by SD Bloom,Nrc Project Manager1993-07-13013 July 1993 Forwards Strip Charts Generated During Calibr & Operation of Safety Injection Tank Level & Pressure Instrumentation.Chart Verbally Requested by SD Bloom,Nrc Project Manager Project stage: Other ML20057E3451993-10-0101 October 1993 Forwards Safety Evaluation Advising That Based on Determination That Alternative Testing Consistent w/OM-10, Paragraph 4.3.2.2 Requirements,No Relief Required Project stage: Approval ML20059C1981993-10-27027 October 1993 Forwards Updated Info on Rv Structural Integrity & Construction Period Recovery for FCS Project stage: Other ML20058G9171993-12-0303 December 1993 Forwards Amend 158 to License DPR-40 & Safety Evaluation. Amend Extends Expiration Date to 130809 or 40 Years After Date of Issuance of OL Rather than 40 Years from Date of Issuance of CP Project stage: Approval ML20059J2141994-01-14014 January 1994 Forwards Amend 159 to License DPR-40 & Safety Evaluation. Amend Revises TS to Change Setpoint Limit for degraded- Voltage Protection Sys Referred to as offsite-power Low Signal Project stage: Approval ML20059K5641994-01-27027 January 1994 Discusses GL-89-10,Suppl 5, Inaccuracy of Motor-Operated Valve Diagnostic Equipment Project stage: Other ML20064D1731994-03-0101 March 1994 Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues & That Subject to Agreement by Nrc/Nrr Project Manager,Items Considered Ready to Close Project stage: Other 1993-06-22
[Table View] |
Text
.
~~ tsw7 ;-
7 m;, y,,,+ ;q:g p g p %,e y p qg-
~
~~~
- p
- p z;g 4
- g3 _rp gagagg u m u2; w d h Q 9 a a s ~a A d ifi u i. q qgt.rg;;:ms02 % & 4..dasum U S S Ejwm ~
37hb hdss Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska G8102-2247 March 1, 1994 402/636-2000 LIC-94-010 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Closure of NRC TAC Issues for Fort Calhoun Station Omaha Public Power District has implemented the necessary actions associated with the open TAC issues listed below.
Subject to agreement by the NRC/NRR Project Manager, these items are considered ready to close.
JK #
pescription/ Status 72134 IEB 88-11, Pressurizer Surge Line Thermal Stratification Response Submitted to NRC:
December 20, 1993 82834 5-Year Construction Period Recovery, Amendment 158 Implemented:
January 10, 1994 84503 Safety Injection Tank Check Valve Dump Test SER Dated:
October 1, 1993 84710 OPLS Setpoint Change, Amendment 159 Implemented:
February 13, 1994 87950 GL 89-10, Supplement 5 SER Dated:
January 27, 1994 88079 Review of FCS PASS Status Letter LIC-93-0135 SER Dated:
February 17, 1994 Please contact me if you have any questions.
Sinterely, q.!
,. l l.
O S i (j 7 s
W. G. Gates
'l Vice President c:
LeBoeuf, Lamb, Leiby & MacRae L. J. Callan, NRC Regional Administrator, Region IV I
S. D. Bloom, NRC Pro 3ect Manager R. P. Mullikin, NRC Stnier Resident inspector 9403110063 94o3o1 PDR ADOCK 05000269 Th
) 0' 45 $124 P
PDR piormet wth Eau rwart unity L