MONTHYEARLIC-93-0163, Forwards Rev 1 to Surveillance Test Procedure (STP) IC-ST-SI-0005, Channel Calibr of SI Tank SI-6A Nitrogen Pressure,Loop P-2901 & Rev 1 to STP IC-ST-SI-0008, Channel Calibr of SI Tank SI-6A Wide Range Level,Loop L-2904X1993-06-11011 June 1993 Forwards Rev 1 to Surveillance Test Procedure (STP) IC-ST-SI-0005, Channel Calibr of SI Tank SI-6A Nitrogen Pressure,Loop P-2901 & Rev 1 to STP IC-ST-SI-0008, Channel Calibr of SI Tank SI-6A Wide Range Level,Loop L-2904X Project stage: Other ML20045D3251993-06-22022 June 1993 Forwards SE for CEOG Rept CEN-387-P,rev 1, Pressurizer Surge Line Thermal Stratification Evaluation. Rept Found Acceptable Project stage: Approval LIC-93-0183, Forwards Strip Charts Generated During Calibr & Operation of Safety Injection Tank Level & Pressure Instrumentation.Chart Verbally Requested by SD Bloom,Nrc Project Manager1993-07-13013 July 1993 Forwards Strip Charts Generated During Calibr & Operation of Safety Injection Tank Level & Pressure Instrumentation.Chart Verbally Requested by SD Bloom,Nrc Project Manager Project stage: Other ML20057E3451993-10-0101 October 1993 Forwards Safety Evaluation Advising That Based on Determination That Alternative Testing Consistent w/OM-10, Paragraph 4.3.2.2 Requirements,No Relief Required Project stage: Approval ML20059C1981993-10-27027 October 1993 Forwards Updated Info on Rv Structural Integrity & Construction Period Recovery for FCS Project stage: Other ML20058G9171993-12-0303 December 1993 Forwards Amend 158 to License DPR-40 & Safety Evaluation. Amend Extends Expiration Date to 130809 or 40 Years After Date of Issuance of OL Rather than 40 Years from Date of Issuance of CP Project stage: Approval ML20059J2141994-01-14014 January 1994 Forwards Amend 159 to License DPR-40 & Safety Evaluation. Amend Revises TS to Change Setpoint Limit for degraded- Voltage Protection Sys Referred to as offsite-power Low Signal Project stage: Approval ML20059K5641994-01-27027 January 1994 Discusses GL-89-10,Suppl 5, Inaccuracy of Motor-Operated Valve Diagnostic Equipment Project stage: Other ML20064D1731994-03-0101 March 1994 Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues & That Subject to Agreement by Nrc/Nrr Project Manager,Items Considered Ready to Close Project stage: Other 1993-06-22
[Table View] |