Text
Docket No. 50-285 December 3, 1993 Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
SUBJECT:
FORT CALHOUN STATION, UNIT NO.1 - AMENDMENT NO.158 TO FACILITY OPERATING LICENSE NO. DPR-40 (TAC NO. M82834)
The Commission has issued the enclosed Amendment No.158 to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No.1.
This amendment consists of changes to the Technical Specifications in response to your application dated July 17, 1986, as supplemented by letters dated April 30, May 15, and December 21, 1987, May 18, 1989, December 16, 1991, March 17, May 15, July 6, 1992, and June 23, August 12, September 17, October 15, and October 27, 1993. The original work request performed using TAC No. M61976, was closed December 8, 1988.
The amendment makes changes the operating license to extend the expiration date to August 9, 2013, or 40 years after the date of issuance of the operating license rather than 40 years from date of issuance of Construction Permit.
A copy of our related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Reaister notice.
Sincerely, ORIGINAL SIGNED BY:
Steven Bloom, Project Manager Project Directorate IV-1 0 8 0 0 ^ c.
Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation Enc'osures:
- 1. Aaendment No. 158 to DPR-40
- 2. Safety Evaluation cc w/ enclosures:
See next page DISTRIBUTION:
- Docket File NRC/ Local PDR PD4-1 Reading B. Elliot J. Roe E. Adensam W. Beckner L. Lois P. Moonan ACRS(10) (MSP315)
OGC(MS15B18)
PD4-1 r/f D. Hagan(MS3206)
G. Hill (4)
C. Grimes S. Bloom OPA(MS2G5)
OC/LFMB(MS4503)
P. Harrell,RIV 0FC LA:PD4-T%
PM:PD4-1 OGC.
2 D:PD4-1 2
NAME PNoonanI' SBbN/vw
[I 7 WBecknYr U 9 /93
// /}d/93 l'k/'4/93 M
DATE ll/'l/93
/
OFFICIAL RECORD COPY Document Name:
FC82834.AMD 9312100181 931203 PDR ADOCK 05000285 P
a nau
,\\
UNITED STATES y
[,j NUCLEAR REGULATORY COMMISSION g g, '}JJ g
WASmNGTON, D.C. 20555-0001
%, v /
December 3,1993 Docket No. 50-285 Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
SUBJECT:
FORT CALHOUN STATION, UNIT NO.1 - AMENDMENT NO.158 TO FACILITY OPERATING LICENSE N0. DPR-40 (TAC NO. H82834)
The Commission has issued the enclosed Amendment No 158 to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit i!o. 1.
This amendment consists of changes to the Technical Specifications in response to your application dated July 17, 1986, as supplemented by letters dated April 30, May 15, and December 21, 1987, May 18, 1989, December 16, 1991, March 17, May 15, July 6,1992, and June 23, August 12, September 17, October 15, and October 27, 1993. The original work request performed using TAC No. M61976, was closed December 8, 1988.
The amendment makes changes the operating license to extend the expiration date to August 9, 2013, or 40 years after the date of issuance of the operating license rather than 40 years from date of issuance of Construction Permit.
A copy of our related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's next biweekly Federal Recister notice.
Sincerely, Steven Bloom Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No.158 to DPR-40
- 2. Safety Evaluation cc w/ enclosures:
See next page
Mr. Terry L. Patterson Omaha Public Power District Fort Calhoun Station, Unit I cc:
Mr. Michael F. McBride, Esq.
i LeBoeuf, Lamb, Leiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations i
Combustion Engineering, Inc.
i 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Nebraska Department of Health 301 Centennial Mall, South Post Office Box 95007 i
Lincoln, Nebraska 68509 Mr. James W. Chase, Manager Fort Calhoun Station Post Office Box 399 Fort Calhoun, Nebraska 68023
?
i
)