Responds to FOIA Request for Input to Chapter 7 & App J of Fes & Suppl to Crbr.Documents Listed in App a Available in Pdr.App B Documents Completely Withheld:Advice & Opinions (Ref FOIA Exemption 5)
ML20063N719
Person / Time
Site: Clinch River
Issue date: 08/24/1982
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Weiss E
HARMON & WEISS
Shared Package
ML20062N348 List:
References
FOIA-82-344 NUDOCS 8210060442
Download: ML20063N719 (4)


Text

P O R-ble

,s 4(my UNITED STATES dM I

NUCLEAR REGULATORY COMMISSION

~g j

4ju,

o C

WASWNGMN. D. C, 20555

+A August 24, 1982 g-g7 Ellyn R. Weiss, Esquire Harmon & Weiss 1725 I Street, N.W.

IN RESPONSE REFER Washington, DC 20006 TO F01A-82-344

Dear Ms. Weiss:

This is in response to your letter dated July 26, 1982 in which you requested, pursuant to the Freedom of Information Act, that the NRC make available all documents or other input to Chapter 7 and Appendix J of the Final Environmental Statement and its supplement for the CRBR.

The documents listed on Appendix A are being placed in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.

The documents listed on Appendix B contain advice, opinions, and recomendations of the staff.

These documents are being withheld from public disclosure g

pursuant to Exemption (5)(of the Freedom of Information Act (5 U.S.C.

i 552(b)) and 10 CFR 9.5(a) 5) of the Commission's regulations.

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation.

This denial may be appealed to the Comission's Executive Director for Operations within 30 days from the receipt of this letter.

As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."

Si eely,/

. M. Felton, Director ivision of Rules and Records Office of Administration

Enclosures:

Appendices 8210060442 820824 PDR FOIA WEISS82-344 PDR

.~. -. -

Re: F0IA-82-344

'O

-.w ; -

Appendix A i

i l

12/18/81 Memo for Paul Check from William Kreger re: Clinch River Breeder Reactor Plant Final Environmental Statement update j

(5 pages) r 2.

5/28/82 Memo for Paul Check from R. W. Houston re:

Evaluation of r

~

Class 9 Accidents for the CRBR Environmental Review (9.pages) l l

3.

7/1/82 Memo for Paul Check from R. W. Houston re:

Revised i

Evaluatior tecidents for the CRBR Environmental Review i

f 4.

6/82 Draft from EJ Rumbley re: Probabilities of Severe Accidents (20 pages) t 5.

5/10/82 Memo for L..Gr.Hulman from: Daniel R. Muller re: Input to CRBR FES (CP)

(4 pages)

,a 6.

2/10/82 Memo for Lewis Hulman from Wm. H. Regan Jr. re: 0-500 Mi% Radius Year 2010 Population Data for the CRBR Des Input (6 pages) 7.

4/13/82 Memo for Walter Pasedag from Irwin Spickler re: Meteorological-Input for CRAC Computer Code for CRBR (2 pages)

}

I 8.

12/22/81 Memo for R. Wayne Houston from George Lear re: L1gui'd Pathway Aaalysis for Clinch River Breeder Reactor Plant (2 pages)

?

9.

5/13/82 Routing and Transmittal Slip for Mohan Thadant from Charles Ferrell re: A Site Description of the CABRP-(17 pages) 10.

3/9/82 Memo for A. Thadani from L. G. Hulman re: Prababilistic Risk l

i Assessment Review for CRBRP (1 page)

.s 11.

3/3/82 Memo? for Distribution from A. C. Thadar.1 re: Draft Statement of f

Work for Technical Assistance Contract Relating to the CRBR Probabilistic Assessment and Reliability Program (13 pages) i Memo for A Thadani from L. G Hulman re: Tentative Schedule for -

12. 2/17/82 the Review of Consequence Aspects of the CRBRP Probabilistic Risk Assessment Study (1 page)
13. 5/28/82 Note to Homer Lowenberg from Paul Check re: CRBR Fuel Cycle Review of Draft Material for FES Update (1 page)

Memo for Paul Check from R..W. Houston-re: Evaluation of Class

14. 15/28/82 i

9 Accidents for the CRBR Environmental Review (9 pages)

[

I r.

I i

8

..-._-_.s

, ~.

Re: F01A-82-344 4.,

Appendix A

?'

15.

4/7/82.

Memo for Paul Check from R. Wayne Houston re: Updated CRBRP Final Environmental Statement: Summary of ~ Radiological Consequences of Postulated Accidents (3 pages) 16.

3/9/82 Memo for A. Thadani from L. G. Hulman re: Probabilistic Risk Assessment Review for CRBRP (1 page) 17.

12/18/82 Memo for Paul Check from William Kreger re: Clinc.h River e

Breeder Reactor Plant Final Environmental Statement Update (5 pages) 18.

12/22/81 Memo for R. Wayne Houston from George Lear re: Liquid Pathway Analysis for Clinch River Breeder Reactor Plant (2 pages) i 19.

12/18/81 Memo for Paul Check from William Kreger re: Clinch River Breeder Reactor Plant Final Environmental Statement Update (5 pages) 20.

4/2/82 Table 12.1-32 from Amendment 65 (Feb.1982) to the PSAR (13 pages) see item 2 Appendix B.

r i

l h

t

?

I l

i I

I r

r i

' I *.

Re: F01A-82-344 Appendix B 1.

3/31/82 Note to L. G. Hulman from P. S. Check; Class 9 Accident.

Consideration in the CRBRP Environmental Review.

(2 pages) 2.

4/2/82 Comments. The Environmental Statement Class 9 Accident.

(narrative withheld-4 pages, Table 12.1-32 from Amendment 65 (Feb.1982) to the PSAR, released )

3.

Undated Coments to P. Check on Environmental Impacts of Postulated Accidents'.