Confirms Tentative Schedule for Review of Crbr Program Probabilistic Risk Assessment Study to Be Included in Fes Suppl
ML20063A981
Person / Time
Site: Clinch River
Issue date: 02/17/1982
From: Hulman L
Office of Nuclear Reactor Regulation
To: Thadani A
Office of Nuclear Reactor Regulation
Shared Package
ML20062N348 List:
References
FOIA-82-344 NUDOCS 8203050073
Download: ML20063A981 (1)


Text

_ _ _ _ _ _

t; A - Q

.=

e t

W e

DISTRIBUTION DOCKET FILE AEB R/F FEB 17 1982 MThadani Docket No.: 50-537

.Wpasedag

'TGHulman j

MEMORANDUM FOR:

A. Thadant. Chief. Reliability and Risk Assessment Branch.

Division of Safety Technology FROM:

L. G. Hulman Chief. Accident Evaluation Branch. DSI

SUBJECT:

- TENTATIVE SCHEDULE FOR THE REVIEW 0F CONSEQUENCE ASPECT 5 r,m --

0F THE CRBRP PROBABILISTIC RISK ASSESSENT STUDY This is to confirm the following tentative schedule, agreed to by Mohan Thadani and Al Spano, for the review of the CRBRP Probabilistic Risk Assess-ment Study (PRA) to be included in the CRBRP Final Environmental Statement (FES) Supplement.

i proposed Schedule l

1.

Review of the Applicants Analysis of Accident Probabilistics Responsible Branch: RRAB Date of Input to AEB: 7/1/82 2.

Review of the Accident Release Source Terms Responsible Branch: AEB Completion Date: 8/15/82 3.

Review of the Accident Consequences and Preparation of Input for the FES Supplement Responsible Branch: AEB Start Date: 7/1/82 Draft Input Completed: 9/8/82 Completion Date: 9/15/82.

By a copy of this memo, the respective branches, which nomally make input to the accident section of the Environmental Statements, are requested to provide their inputs to AEB by 8/1/82.

Original siemed by:

/

~

L. G. Hulman, Chief gg Accident Evaluation Branch Division of Systems Integration cc: RMattson RStark SHanauer WRegan PCheck rpagann o[fer '