Fifth Interim Deficiency Rept Re Failure of Bolts & Nuts to Meet ASTM Requirements.Initially Reported on 810924. Engineering Interpretation/Recommendation Awaited.Also Reported Per Part 21.Next Rept Expected by 830110
ML20063N654
Person / Time
Site: Bellefonte  
Issue date: 09/27/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8210050115
Download: ML20063N654 (2)


Text

m

~

~

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II N

September 27, 1982

)

BLRD-50-438/81-64 U

Zb i*

o BLRD-50-439/81-62

- :U y

atn Cr; M9 Oo

%2 U.S-, Nuclear Regulatory Commission y

Region II ce l

Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - BOLTS AND NUTS FAIL TO MEET ASTM SPECIFICATIONS - BLRD-50-438/81-64, BLRD-50-439/81 FIFTH INTERIM REPORT-The subject deficiency was. initially reported to NRC-0IE Inspector R. V. Crlenjak on September 24, 1981 in accordance with 10 CFR 50.55(e)

-as NCR's 1597 and 1598. This was followed by our interim reports dated October 22 and December 8, 1981 and February 19 and June 29, 1982.

Enclosed is our fifth interim report. We expect to submit our next report by January 10, 1983 We consider 10 CFR Part 21 applicable to this deficiency.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, I

TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 i

l l

b O }'

gcG*C 1

8210050115 820920 8

l PDR ADOCK 05000438 S

PDR An Equal Opportunity Employer

j i

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 BOLTS AND NITIS FAIL TO MEET ASTM SPECIFICATIONS NCR'S 1597 AND 1598 BLRD-50-438/81-64, BLRD-50-439/81-62 10 CFR 50.55(e)

FIFTH INTERIM REPORT Description of Deficiency j

10,000, 3/4" stainless steel nuts (furnished by Chattanooga Bolt and Screw, Chattanooga, Tennessee) and 10,600, 3/4" x 3-1/2" stainless steel bolts (furnished by Challenge Enterprises, Chattanooga, Tennessee) were received not marked in accordance with ASTM specifications. Subsequent testing of the subject material by Singleton Materials Engineering Laboratory revealed the material failed to meet ASTM specifications. The associated documentation received with the material erroneously indicated that the nuts and bolts do meet ASTM specifications. Approximately 450 of these bolts and 1300 nuts have been issued to the field for installation.

Nonconformance report (NCR) 1597 pertains to the bolts and NCR 1598 pertains to the nuts.

Interim Progress After intense investigation and thorough searching for the missing nuts and bolts, TVA has determined that all of the bolts and nuts could not be located. TVA will perform an engineering evaluation to weigh the consequences of providing acceptance to use the bolts and nuts as is based on results of an analysis by TVA's Singleton Laboratory. The analysis results are in, but no engineering interpretations nor recommendations have been made. More information will be provided in our next report.