ML20063N005

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1982
ML20063N005
Person / Time
Site: Crystal River 
Issue date: 09/01/1982
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20063N002 List:
References
NUDOCS 8209170004
Download: ML20063N005 (4)


Text

. - -

i.

OPERATING DATA REPORT 4

DOCKET NO. 50-302 DATE 9/1/82 COMPLETED RY n nnonre TELEPilONE (904 f795-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit #3 Notes

2. Reporting Period:

8/1/82 - 8/31/82

3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe):

m

6. Maximum Dependable Capacity (Gross MWe):

R45

7. Maximum Dependable Capacity (Net MWe):

806

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

2475 MM chormn1.

10. Reasons For Restrictions,if Any:

Pump Power Monitors in bypass.

This Month Yr.-to-Date Cumulative f

11. liours In Reporting Period 744 5831' 47951
12. Number Of lionrs Reactor Was Critical 723.4 4799.5 30248.89
13. Reactor Reserve Shutdown flours 0

71.1 1280.3

14. Ilours Generator on-Line 720.3 4718.6 29530.78'
15. Unit Resene Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (MWil) 1630568 10624795 65991736
17. Gross Electrical Energy Generated (MWil) 555261 3607499 -

22407090

18. Net Electrical Energy Generated (MWH) 527888

'1430039 21259337

19. Unit Service Factor 96.8%

80.9%

61.6%

20. Unit Asailability Factor 96.8%

80.9%

61.6%

21. Unit Capacity Factor (Using MDC Net)

'88.0%

73.0%

56.5%

22. Unit Capacity Factor (Using DER Net) 86.0%

71.3%

53.7%

23. Unit Forced Outage Rate 3.2%

19.1%

25.5%

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

Nnno

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed i

INITIA L CRITICALITY 1/14/77.

INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPER ATION 3/13/77 8209170004 820913 (9/77)

PDR ADOCK 05000302 R

PDR


v n

y gn

,e

,, -~

,m_

o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT Fi_CRP-3 DATE 9/1/82 COMPLETED BY D. Bostart I

TELEPilONE (904) 795-6486-MONTli August 1982 DAY

~ AVER AGE DAILY l'OWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 780 17 735 785 2

33 780 81 788 3

,9 4

663 20 785 5

662 21 802 691 795 6

22 1

7 764 23 779 8

295 24 815 9

336 762 25 10 789 26 791 11 785 27 773 12 801 481 yg 13 760 29 507 l

14 767 30 569 15 773 571 3

789 16 I

I INSTRUCTIONS On this format.hst the average daily unit power level in MWe-Net for each day in the reporting inonth. Compute to i

the nearest whole megawatt.

(9 /77 )

.. r

O O

'O

\\

1 1 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

5f.4f I?

UNIT NAME FLCRP-3 DATE _9/?/n?

COMPLETED BY M it en1ver

- REPOR F MONTil 8/82 TELEPilONE (onM 70s AAAA w.

jg 3

[i Licensee h

Cause & Corrective g

No.

Date e-.

E 4

33 Event c; ?

c?

Action to S

[@

3d5 Report rN 0

!0 Present Recurrence e

S L

82-23 820804 F

B N/A N/A HC HTEXCH Reduced power due to turtle grass problems at the circulating water inlets and to clean waterboxes.

82-24 820808 F

23.7 A

3 N/A CB INSTRU Flow indicator in A loop of the RCS failed, causing the system to change FW flow with a final result of a reactor trip on high pressure.

82-25 820827 S

H N/A N/A HH MECFUN Reduced power to the 65% to 70% FP range to replace the temporary condensate pump with the original which has been repaired.

I i

I 2

3 4

F: Forced Reason:

M ?.cd:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-M.nual for Preparation of Data

.l B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee -

C Refueling 3-Automatic Scram.

Event Report (LER) File INUREG-l D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

i G-Operational Error (Explain)

Exhibit I Same Source.

(9/77)

Il-Other (Explain) 1 i

4

MONTHLY OPERATIONAL SUmfARY STATD!Eh7 j

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 9/2/82 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTil Att gus t 1982

SUMMARY

STATDfENT:

The unit experienced one shutdown and two significant power reductions this month.

O l

i i

i d

l l